Title: NAVAL REACTORS PROGRAM TMDE Status


1
  • NAVAL REACTORS PROGRAM TMDE Status
  • Gregory L. Nelson
  • NAVSEA 08
  • (202) 781-6177
  • Gregory.l.nelson1_at_navy.mil

2
NAVSEA 08K
  • Responsible for the development, manufacture,
    installation, testing, operation, and maintenance
    of
  • Reactor Plant IC equipment and systems used to
    monitor and control the reactor plant.
  • Steam and Electric Plant IC equipment and
    systems used to monitor and control the main
    engines and electric plant.

3
Background
  • What are we trying to fix?
  • Maintenance personnel have difficulties in
    identifying meter equivalencies
  • Increasing number of GPETE models called out by
    08 procedures are obsolete
  • Test equipment called out in technical manuals
    may not have the procedures required for
    calibration
  • Equipment technical manuals lacking test
    equipment definitions

4
Fix Use the NAVSEA 04 process
  • Use SCAT codes to call out TMDE, no need for
    worker to determine equivalency, just pick any
    current meter from the SCAT code.
  • NAVSEA 08 will no longer need to track GPETE
    obsolescence, NAVSEA 04 actively does this in
    TMDE index.
  • Formal Communications All of our measurement
    requirements are now know by NAVSEA 04, including
    when SPETE is required. This should eliminate
    surprises at the Cal Lab.
  • CMRS data sheets All measurement requirements
    are now documented for future use.

5
Big Picture Plan
  • Step 1 Formulate plan and get NRHQ approval
  • Step 2 Review and update source requirements as
    required.
  • Step 3 Determine measure requirements, assign
    SCAT codes, and incorporate them into component
    technical manuals (CTM).

6
Conversion Status Step 1 Get NRHQ approval for
change.
  • The long term plan to convert the NAVSEA 08
    process for determining meter equivalency to the
    NAVSEA 04 process was approved by NAVSEA letter
    Ser 08K/05-04118, dated 21 December 2005.

7
Conversion Status Step 2Update all source
requirement documents
  • The following source document revisions were
    authorized by NAVSEA 08 on 13 December 2006.
  • TM-1- Preparation of Technical Manuals for
    Special Purpose Mechanical and Electrical
    Equipment
  • Provides guidance on how to incorporate SCAT
    codes into manuals.
  • MIL-DTL-23200- Detail Specification, General
    Specification for Control and Instrumentation
    Equipment
  • Removed Portable Test Equipment List 1A
  • E-569368-DID-I- Data Item Description for
    Equipment Hardware Design Documentation
  • Requires vendor to provide measurement
    requirements. If required, BPMI completes the
    CMRS data sheet.

8
Conversion Status Step 2
  • New BPMI Operating Instruction (OI) EN112 Test,
    Measurement Diagnostic Equipment
  • Provides relevant TMDE definitions
  • Identifies how to complete a CMRS form
  • Details the interface with NAVSEA 08 and NAVSEA
    04
  • NAVSEA 0989-031-4000 Reactor Plant
    Instrumentation Control Equipment Maintenance
    Manual
  • Section G/I 8 - Selection of Equivalent
    Electrical Meters, Recorders and Oscilloscopes
    updated to recognize use of SCAT codes.

9
Conversion Status Step 3
  • Schedule
  • Schedules are based by ship class and equipment
    suit installed (i.e. S8G Type 2, 688 Type 1 )
  • Based on remaining service life, not all class
    manuals will be converted. (i.e. CVN65, NR-1,
    Analog equipment being replaced by Microprocessor
    equipment)

10
Conversion Status Step 3
  • Conversion Outline
  • Applicable system engineers completed part 1 of
    CMRS data sheets based on Component Technical
    Manual procedures. To aid NAVSEA 04, current
    model used was also listed.
  • It was stressed NOT to base measurement
    requirements solely on existing model being used.
  • Completed sheets are provided to NAVSEA 04 by
    BPMI. BPMI co-ordinates any questions from
    NAVSEA 04 to the applicable system engineer.

11
Conversion Status Step 3
  • Conversion Outline
  • Once completed, NAVSEA 04 provided completed CMRS
    data sheets (SCAT code assignment) to BPMI.
  • SPETE (which may not have been previously
    identified to NAVSEA 04) is also being assigned a
    SCAT code to ensure proper support is identified.
  • BPMI updates the component technical manual to
    use SCAT codes during next routine manual
    revision. Any measurement that does not meet a
    41 Test Accuracy Ratio requires NAVSEA 08
    approval prior to use.

12
Conversion Status Step 3
  • First conversion (S8G - Type 2) process is in the
    final stages of CTM revisions.
  • Remaining project schedules are being evaluated.
    Next project being worked is 688- Type 2.

13
Future Projects
  • Contracts will be written to require the vendor
    to provide measurement requirements. BPMI will
    use this data to complete the CMRS data sheet.
  • CVN78 contracts have been written using the new
    process.
  • Type 2 equipment contracts for Virginia and
    Seawolf classes have also been written using the
    new process.

14
Summary
  • Significant progress has been made to date for
    this effort.
  • All parties have been participating in bi-weekly
    telecons to review status and address any issues.
  • Having completed the first project, all parties
    are currently looking at lessons learned, and
    updating processes to make improvements.

15
Questions?