Implementation process of Mahatma Gandhi NREGS * * * * * * * * At GP level Schemes deals with MGNREGS, TFC, KL Grant, GP Fund. MGNREGS Maintaining of Case Record in ... – PowerPoint PPT presentation

Number of Views:189
Avg rating:3.0/5.0
Slides: 25
Provided by: DrDa50
Category:

less

Transcript and Presenter's Notes

Title: Implementation process


1
Implementation process of Mahatma Gandhi NREGS
2
1. Model case record of different schemes
maintenance of Case record by GPs
  • At GP level Schemes deals with MGNREGS, TFC, KL
    Grant, GP Fund.
  • MGNREGS
  • Maintaining of Case Record in three Stages
  • Before Execution
  • During Execution
  • After Completion

3
  • A. Before Execution
  • The Project is to be approved by Palli Sabha,
    Gram Sabha Panchayat Samiti Zillaparisad.
  • Approved Project List/Action Plan is to be sent
    to GP PS and work to be taken up on priority
    basis.
  • The Plan, Estimate Design to be prepared by the
    JE with wage component of minimum 60, the
    same to be technically sanctioned by the
    competent authority.

4
  • Project Code to be generated at Block Level
    NREGAsoft (http//nrega.nic.in).
  • Example- 2427004011/RC earthen Road 70335
  • Financial Sanction will be done at DPC level.
  • C1 - is the demand for the work, C2 - is the Job
    provided Muster roll to be generated with
    computerised number the same will be issued by
    the Programme officer.
  • Case Record is to be opened indicating (Front
    Page)
  • Project Code.
  • C/R NoFinancial Year
  • Name of the Work..
  • Name of the village.
  • Name of the GP.
  • Name of the PS..
  • Heads of A/C.
  • Estimated Cost
  • Date of Commencement
  • Date of Completion..
  • Name of BDO, Name of AE, Name of JE, Name of EO,
    Name of Gram Sanjojak.
  • MB no.. Page.

5
  • Case Record contains
  • Copy of Approved Annual Action Plan
  • Approved Plan Estimate
  • Copy of Financial Section
  • Copy of monitoring committee
  • Work order of Gram Sanjojaka
  • Pre Photograph of Work Side
  • Photograph of Transparency pillar
  • C1,C2 form and muster roll

6
  • During Execution
  • Work Site will be facilitated with rest shed,
    First-aid box ,drinking water supply Creatures
    if required.
  • The Gram sanjojaka will be provided with a bag
    containing a copy of Case Record, Stock Register,
    Grievance Register, Muster Roll, Diary,
    Measurement register,Measuring Tape, Calculator,
    First-Aid box , other register forms
  • Photographs of Working laborers at regular
    interval indicating dates.
  • The muster roll is to be maintain by Gram
    Sanjojak Daily _at_90/Day per head.
  • The daily Measurement will be taken by Gram
    Sanjojak in his note book should be signed by
    the group leader.
  • The Measurement will be taken by the JE in every
    Seven days which is to be check measured by the
    competent authority.

7
  • During Execution (contd..)
  • After passing of bill the payment will be made
    through the Post Office/Bank.
  • the Gram Sanjojaka has to collect the
    signature/LTI from the labourer he should
    declar the wage amount , name of the Bank/Post
    office wage slip given to the labourers.
  • Interim monitoring committee report is to be
    attached.
  • Online entry of paid muster roll vouchers by
    the CP will be done.
  • Payment amount will be entered in job card
    employment register
  • The most sincere duty of a Gram sanjojaka to
    provide regular mesurement, regular payment,
    smooth management of work site.

8
  • C. After Completion
  • Final monitoring committee report
  • Final photographs of Project.
  • Completion certificate of indicating( Date of
    Comm, Date of Comp., Mandays generated,
    Expenditure incurred)
  • Hard copy of expenditure report.
  • Social Audit.
  • Success Story.

9
  • Six Register of MGNREGA will be maintained
    properly at GP level to ascertain the
    transparency of MGNREGS.
  • Application register
  • Muster roll received register
  • Job Card register
  • Employment Register
  • Complain register
  • Asset register

10
SUCCESS STORIES UNDER MGNREGS
RAIN WATER MANAGEMENT PROJECT, PUA(WODC
MGNREGS)
11
11
12
How do we do that? Infiltration Design network
Yellow Primary guide bond Blue - Secondary
guide bond Red- Runoff water
12
13
Convergence of MGNREGS with WODC fund
Project PUA G.P-PUA, Block-Tarva Before Treatment
Project PUA G.P.-PUA, Block-Tarva AFTER
TREATMENT Construction of Secondary guide bonds
Project Cost-53.74 lakh Benefit- i.For
conservation of run off Water. ii.To raise
ground water table . iii. To create addl. Rabi
Summer Crop.
13
14
Construction of Primary guide bonds
14
15
Farm ponds under NREGS (30 X 30 X 10)Ft.
15
16
Secondary Guide bonds
16
17
Mango Plantation under NREGS
17
18
Men at work under NREGS
18
19
(No Transcript)
20
Name of the Project- Const.of Farm Pond Name of
the Beneficiary- Deba Podha Village - Brahmani
under Tarva block Est.Cost- 50,000/- Head of
account - MGNREGA It will provided water for
vegetable Cultivation
21
Name of Work Farm Pond of Sri Chandra
Mendili Estimated Cost Rs.35,000/-, Name
of Village Dahanipali under Hillund GP of Bmpur
Block
22
Improvement of Road from Malpur to
mahanadi Chadeipank GP under Ullunda
Block Cost-5.00 lakhs Benefits-It connects 3 nos
of villages
23
MGNREGS PROJECT
Project- Check dam, Sardhapali Cost- 80000/- GP
- Kalapathar Block- SONEPUR Benefit- 1.To
raise ground water 2.Protective irrigation
during dry spell period. 3. for common uses.