Title: ANSALDO SEGNALAMENTO FERROVIARIO Company overview and ERTMS/ETCS references
1ANSALDO SEGNALAMENTO FERROVIARIO Company
overview and ERTMS/ETCS references
- UNIVERSITY OF PARDUBICE
- October 25, 2004
2(No Transcript)
3(No Transcript)
4Corporate Architecture
5(No Transcript)
6Main Systems and Products
- Electronic interlockings
- ERTMS/ETCS
- Conventional ATC and ATP
- CTC
7Interlockings portfolio equipped stations
ACEI
ACC
153
1000
111
40
800
811
2
779
692
600
519
400
262
120
200
62
0
70
75
80
85
90
95
'00
'04
8Orte
Pisa
Viterbo
Operator Interface of the Supervision system
Fara Sabina
H. V. Firenze
Monterotondo
Cesano
Settebagni
Cab C
Smistam.
La Storta
Bivio Nord
Cab F
Maccarese
N. Salario
M. Mario
R. Salario
Roma Termini
Scalo S. Lorenzo
Nomentana
Aurelia
Tiburtina
San Pietro
B. Tiburtuina
Aeroporto L. Vinci
B. Portonaccio
P.co Prenestina
B. Tuscolana
Prenestina
Ostiense
Tor Sapienza
Trastevere
Tuscolana
Magliana
P. Galeria
Casilina
Salone
B. Casilina
Lunghezza
Bagni Tivoli
Roma Junction lay out
Guidonia
Ciampino
Pescara
Cassino
Torricola
A.
F.
V.
9West Coast main line
10(No Transcript)
11SCMT Sistema Controllo Marcia Treno
- Wayside installations 2.000 km lines length, 300
stations - - Firenze junction 120 stazioni
- - Napoli junction 72 stazioni
- - Torino junction 50 stazioni
- Verona junction 14 stazioni
12(No Transcript)
13CTC Grande Rete
Brennero
Torino
Mi
CTC Grande Rete per Genova junction (650 trains
per day) Venezia junction (630 trains per
day) Napoli junction (1150 trains per
day) Tirrenica line (500 trains per
day) Adriatica line (590 trains per day) Bologna
- Brennero line (400 trains per day) Palermo
junction (490 trains per day)
Venezia
Bologna
Genova
Roma
Napoli
Bari
Palermo
Messina
Siracusa
14Italian High Speed Network
Main traffic characteristics Main train
speed 300 km/h Min. headway 2.5 min Min.
timetable 5 min. Electric traction 25 kV
ac Long distance trains Fast freight trains
15Mass Transit main references
Italy Genova Milano linee 1, 2,
3 Napoli Roma linee A, B Perù Lima U
K Birmingham Br Belo Horizonte
16(No Transcript)
17 Goals Achieved
- ASNV involvement in the ERTMS Specs Development
as Eurosig/Unisig Member - Selection of ASNV technology for Eurobalise
- ASNV participation in the French and Italian
Pilot Projects - ASNV leading role in the Vienna-Budapest ERTMS
Implementation Project - ASNV Extremely successful in EMSET Tests
(Madrid-Sevilla)
18 Goals Achieved
- ETCS Lev. 1 in Bulgaria (as supplier of
components) - ETCS Lev. 1 in Hungary (as supplier of
components) - ETCS Lev. 1, 2 in Madrid-Barcelona (Spanish HSL)
- ETCS Lev. 2 for all Italian HSL
- ETCS Lev. 1,2 for the TGV Est Européenne
19- THE HIGH SPEED PROJECT IN ITALY
20Italian Project Sections
21Italian Project Sections
22Italian Project Sections
23Italian Project Sections
24H. S. line Roma-Napoli system architecture
RBC ALSTOM
Centro GSM-R SIRTI
SCC ANSALDO
NSS
BSC
Posto Centrale
Rete TLC-LD SIRTI
Posto Periferico
Periferia GSM-R SIRTI
BTS
NVP - GAT ANSALDO
Interfaccia CdB audiofr.
Cabina
Boe ANSALDO
Dev. Oleodinamici Dev. Elettromecc. ALSTOM
CdB audiofrequenza ALSTOM
Altri dispositivi (RTB,) ALTRI
Piazzale
25Milano - Bologna
Italian Project ERTMS overall architecture
26Torino - Milano
Italian Project ERTMS overall architecture
27Bologna - Firenze
Italian Project ERTMS overall architecture
28TGV Est Européenne
- ERTMS/ETCS lev. 1 and lev. 2 (plus TVM and
electronic IXLs ) - 300 km from Vaires (Paris) to Baudrecourt (Metz)
due to open in 2007 - Operating speed 320 km/h
29ETCS Level 1 PROJECT Spanish High Speed Lines
- ASNV is providing for this line both Level 1 and
Level 2, with ASFA as a fall back system - Project Name Madrid Lerida
- Location Spain
- Name of the Customer GIF
- Date to be in Commercial Service N/A
- Date Trials due to/have finished Sept 2004
- Conformant with Specification UNISIG 2.0.0
- Line Performance Capacity 11 trains per hour
per direction - Line Performance Speed 300 km/h
- Mixed Traffic Line Yes
- Number of Complex junctions 13
30MADRID - LERIDA line equipped with ERTMS project
description and development
PUIGVERD DE LLEIDA
440 Km, 13 stations, 1100 track circuits
LLEIDA
ZA - Aeropuerto
EL SEGRE
ZARAGOZA
BUJARALOZ
CALATAYUD
PLASENCIA de JALON
GOMARA
SORIA
ARIZA
Soria - Calatayud 90 Km
LAS INVERNAS
MEDINACELI
GUADALAJARA
MADRID SUR
MADRID
31ETCS Lev.1 References
- BDŽ (Bulgaria) Sofia Burgas
- Supplier of Alcatel Austria for
- BTM and Antennas (184)
- Eurobalises (1.078)
-
32ETCS Lev.1 References
- MÁV (Hungary) Budapest-Kelenföld-Kimle
- Supplier of Alcatel Austria for
- BTM and Antennas (20)
- Eurobalises (1.800)
-
33ETCS Lev.1 References
- GIF (Spain) Madrid Puigvert de Lleida (Lev.12)
- Supplier (for the Lev.1 system) of
- BTM and Antennas (32)
- LEU (347)
- Eurobalises (3.500)
-
34ETCS Lev.1 References
- SNCB (Belgium)
- Design and development of specific LEU for the
national application.
35ETCS Lev.1 References
- RFI (Italy) SCMT
- Design, configuration, supply and installation of
the complete wayside and on-board system - EVC (gt 1.100)
- BTM and Antennas (gt 2.200)
- LEU Cabinets (700) and LEU modules
- Eurobalises (gt 23.000)
36ETCS Lev.1 References
- RFI (Italy) High Speed Lines
- Design, configuration, supply and installation of
the complete signalling system based on
ERTMS/ETCS Lev.2. - RBC (5)
- LEU (for interconnections) (320)
- Eurobalises (2.500)
37(No Transcript)
38RBC
39RBC Architecture
40ETCS On-Board
EUROCAB
On-board Computer
Cab Display
3
40
09/01
CSEE Transport
41LEU cabinets
42LEU module
43Eurobalise
44Eurobalise installation
45Eurobalise programmer and tester
46Thank for your attention