Title: Fundamentals of Retro-Commissioning
1Fundamentals of Retro-Commissioning
- Tom Meyer
- CSME, GGP, CBCP, QCP, EBCP
- The ESCO Group
2Fundamentals of Retro-Commissioning
Fundamentals of Commissioning Existing Buildings
Fundamentals of Optimizing Existing Buildings
3Purpose of Retro-Commissioning
Optimization of Existing Buildings
4Why Existing Buildings?
- Lots of existing buildings
- All have opportunities
- Benefits range from less than a month to a year
economic payback - Helps identify capital and rehab projects with
economic payback from one to 20 years.
5Not ALL Buildings are Candidates
- If there is no functional use and you want to
save energy close the building down.
6Flavors of Commissioning
- New Construction Commissioning
- Re-Commissioning
- Continuous Commissioning
- Retro-Commissioning
7Defining Retro-Commissioning
- Q What does retro-commissioning mean?
- Returning out of spec equipment back to original
design. - Commissioning a building again after several
years since it was commissioned as new
construction. - Commissioning a building never before
commissioned to the owners current requirements.
8Limited in Scope
- Most retro-commissioning programs are limited in
scope. - System
- Equipment
- Problem
9Motivation
The Building Owners motivation is the
determining factor of scale and depth of the
commissioning process.
10Nuts and Bolts of Cx
- Benefits of Retro-Commissioning
- Process of Retro-Commissioning
- Commissioning Methods
- Types of Commissioning
11Top 10 Retro-Cx Measures
- Improve boiler efficiency/controls
- 9. Reset supply static pressure setpoint
- 8. Review terminal unit operation
- 7. Return VFD to variable speed operation
- 6. Lower condenser water temperature
-
Courtesy of San Diego Energy Office
12Top 10 Retro-Cx Measures
- 5. Calibrate sensors and instrumentation
- 4. System level and balance
- 3. Optimize economizer operation
- 2. Eliminate simultaneous heating cooling
- 1. Turn off equipment when not needed
-
Courtesy of San Diego Energy Office
13Confused?
14Get Professional Help!
Any successful commissioning plan starts with the
right people led by a person with the proper
training and experience.
15QUESTIONS?