National Traffic Management Log (NTML) Overview - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

National Traffic Management Log (NTML) Overview

Description:

... WG established under the TUT Committee Regularly scheduled meetings and OT&Es Biweekly telecons Joint Management / NATCA membership Focal point for ... – PowerPoint PPT presentation

Number of Views:142
Avg rating:3.0/5.0
Slides: 12
Provided by: FAAU
Category:

less

Transcript and Presenter's Notes

Title: National Traffic Management Log (NTML) Overview


1
National Traffic Management Log (NTML) Overview
  • CDM Brief
  • March 5, 2003

2
Why NTML? An Overview
  • Improved Log Entry Communication
  • Between TM, Controllers, Users
  • Single Point of Data Entry for NAS TM Messages
  • Collect NAS Causal Data
  • Key missing element for NAS operational analysis
  • Integration with ETMS, OPSNET, OIS, ESIS, ERIDS,
    FSM, Outage DB, SUA . . . .
  • Movement towards a decision support tool

3
Program Challenges
  • Network bandwidth
  • Integration of two independent networks
    (ETMS/ADTN)
  • Integration across different types of facilities
  • Wide range of locally developed software used in
    individual facility TMUs
  • Need for additional hardware (Linux PCs)

4
NTML User Workgroup
  • TM User Team (TUT) Working Group (WG)
  • First WG established under the TUT Committee
  • Regularly scheduled meetings and OTEs
  • Biweekly telecons
  • Joint Management / NATCA membership
  • Focal point for operational development
    priorities
  • End User Feedback
  • Workshops and Ad Hoc local user meetings
  • Formal and informal user feedback (Application /
    Web Site)
  • Bring SMEs into WG meetings

5
Deployment Strategy/Timetable
  • Tier 1 Six west Centers
  • Focus on DCC 11 22 and associated facilities
  • Version 3.0 successfully completed on Dec 12,
    2002
  • Tier 2 Continue movement East and Southeast
  • DCC 12/24/16 and associated facilities
  • Targeted for March 31, 2003
  • Tier 3 Add remaining facilities (Northeast)
  • Version 3.1 - ESIS / MyEntries/Output mappings
    (April 03)
  • Version 3.2 - View/Log filters current only
    (Summer 03)
  • Version 3.3 - SWAP / SIA (Winter 03)

6
(No Transcript)
7
Program Enhancements in Tier 1 (Version 3.0
Dec 02)
  • Improved look/feel
  • User interfaces (GUIs)
  • Template redesign
  • Menu redesign
  • Template redesign
  • RSTNs, GS, Free form, Delay, Runway
  • Pending box and view dialog improvements

8
Program Enhancements in Tier 2 (Version 3.1 -
April 03)
  • ESIS Database Table Access (Link between TMU
    operational areas)
  • Ability to save and recall entries
  • Enhanced views, pending, and interfaces
  • Revised output mappings (Reduce size of log)
  • OIS integration (single point of entry)

9
Program Enhancements in Tier 2 (Version 3.2 -
Summer 03)
  • ESIS Database Table Access (Link between TMU
    operational areas)
  • Ability to save and recall entries
  • Enhanced views, pending, and interfaces
  • Revised output mappings (Reduce size of log)
  • OIS integration (single point of entry)

10
Program Enhancements in Tier 3(Version 3.3
Winter 03)
  • Status Information Area (SIA) (TMU heads-up
    display)
  • SVR WX (SWAP/RERTE/RTE closure status)
  • Smart use of ETMS Parse-able advisories
  • ERIDS (link between TMU, OPS Sup, and TMU)
  • Make data available to airlines via web site
    (Spring 2K IOU)

11
NTML Planned NTML Data Flows
ATT-220
Write a Comment
User Comments (0)
About PowerShow.com