Noise Abatement Strategies: The Critical Questions - PowerPoint PPT Presentation

About This Presentation
Title:

Noise Abatement Strategies: The Critical Questions

Description:

Noise Abatement Strategies: The Critical Questions Which runway use provides the most noise reduction north of the airport? east preference (current) – PowerPoint PPT presentation

Number of Views:60
Avg rating:3.0/5.0
Slides: 6
Provided by: Tarc
Category:

less

Transcript and Presenter's Notes

Title: Noise Abatement Strategies: The Critical Questions


1
Noise Abatement StrategiesThe Critical Questions
  • Which runway use provides the most noise
    reduction north of the airport?
  • east preference (current)
  • west preference
  • no preference
  • day/night split
  • Which runway use provides the most noise
    reduction south of the airport?
  • mixed divergence off west runway (current)
  • all diverge
  • no divergence (except simultaneous ops)
  • resolve Fort Knox restricted area issue
  • How can we minimize exceptions to contraflow
    operations, thus minimize sleep disturbance?
  • options
  • operations affected/cost
  • benefits
  • How can we improve the consistency and
    predictability of runway use direction?
  • education/knowledge base
  • too hard for model

2
Noise Abatement StrategiesThe Critical Questions
  • Which turning rules give the best results?
  • noise exposure
  • consistency/predictability
  • alone/with standard prescribed tracks
  • What prescribed tracks give the best noise
    reduction, while remaining operationally sound?
  • for arrivals
  • for departures
  • with/without exceptions for visual
  • handoff/gateway points
  • What navigation aids or standards can be applied
    to minimize deviation from prescribed tracks?
  • required navigational performance (RNP)
  • specific hardware/procedures
  • for emerging technology, knowledge base
  • What other operational procedures can be added to
    reduce noise exposure?
  • costs
  • benefits
  • What other facilities, use restrictions,
    regulations, and management measures can be
    applied to enhance the program?

3
Noise Abatement StrategiesBear Traps
  • Imprecision
  • daytime contraflow
  • I-65 corridor
  • straight-out departure track
  • Premature Closure
  • advanced technology
  • contraflow exceptions
  • runway use criteria
  • net assessment
  • Terminology
  • preference/preferential use
  • peak/non-peak
  • voluntary measure
  • Meaningful progress depends on our ability to
    avoid these traps. If we dont, we get stuck.

4
Noise Abatement StrategiesImperatives
  • Precise definition of each strategy
  • measures included
  • measures excluded
  • rationale
  • follow-up documentation
  • Close - intimate - communication on analysis
  • Study Group checks inputs
  • emerging insights relayed right away
  • anomalies identified for further study
  • course corrections when appropriate
  • Open-ended review of results
  • think before packaging
  • challenge assumptions, conclusions
  • ongoing feedback
  • Results of this phase crucial to study results.
    Oops no longer affordable.

5
Noise Abatement Strategiesrecommended to the
Study Group
  • Common elements
  • minimize contraflow exceptions
  • noise-optimal prescribed tracks (STARs, SIDs)
    with minimal exceptions
  • RNP or hardware specs to minimize deviation
  • operational measures (potential excursions)
  • facilities, use restrictions, regulations,
    management measures
  • document knowledge of emerging measures
  • Principal alternatives
  • Limit east runway preference to daytime only
    southbound divergence according to destination
  • Eliminate runway preference all southbound
    diverge on 17R
  • Reverse runway preference no divergence on 17R,
    except simultaneous operations
  • Key conditions
  • Ft Knox issue resolved favorably
  • Results for each major lobe of noise contours
Write a Comment
User Comments (0)
About PowerShow.com