Title: 7E2: EM test plans
17E2 EM test plans
GLAST Large Area TelescopeTracker Subsystem
Nicola MazziottaUniversity and INFNBari -
Italymazziotta_at_ba.infn.it
2Outline
- Test strategies
- First results
- Panel vib plan
- Tray thermal plan
- Tower vib plan
- Tower thermal plan
- EM Matrix plan
- Reference LAT Documents
- LAT-MD-00408, LAT Instrument Performance
Verification Plan - LAT-SS-00788, LAT Environmental Specification
- LAT-TD-01005, Thermal Test Results on Thick
Converter Mock-up Trays - LAT-TD-01249, Thermal Test Results for
Pre-Engineering Model Trays - LAT-PS-01584, LAT Tracker Tray SSD Ladder Panel
Assembly Procedure - LAT-TD-01004, EM Tray Vibration Test Plan
- LAT-TD-01037, EM Tray Thermal Test Plan
3Tray assemblytest sequence
Live trays
4Tray vib levels
White Noise
Sine sweep
Frequency range 20 ? 2000 Hz
Sweep rate 2 oct/min
Target Amplitude 0.5 g0-pk
Frequency (Hz) ASD WN Level(g2/Hz) Overall grms Duration (min)
20 2000 10-4 0.45 1
Random vibration
Frequency (Hz) ASD Qual Level (g2/Hz) ASD Accept Level (g2/Hz) ASD Launch Level(g2/Hz)
20 0.026 0.013 0.0065
20-50 6 dB/oct 6 dB/oct 6 dB/oct
50-800 0.16 0.08 0.04
800-2000 -6 dB/oct -6 dB/oct -6 dB/oct
2000 0.026 0.013 0.0065
Overall 14.0 grms 10.0 grms 7 grms
Duration 2 min 1 min 1 min
5Tray vib set up
W side on the top
- Accelerometers position
- Control two mono-axial accelerometers
positioned on two of the four L-shaped block
TP1TP2 - Fixture three mono axial accelerometers placed
on a corner on one of the four L-shaped block TP6 - Tray one three-axial accelerometer in the middle
TP5
- Centrotecnica set up
- - 1 LDS V864LT shake table
- 2 fixtures
- 9 read out channels
- 4 trays/day test rate capability
6Tray vib sequence thrust axis
Step Description Test Level
1 Fixture, tray and accelerometers mounting
2 Fixture calibration and tray resonance search Sine sweep 0.5 g 0-pk
3 Pre-random vibration White noise 0.45 grms
4 Random vibration Random vibration Launch
5 Post/Pre-random vibration White noise 0.45 grms
6 Random vibration Random vibration Acceptance
7 Post/Pre-random vibration White noise 0.45 grms
8 Random vibration Random vibration Qualification
9 Post-random vibration White noise 0.45 grms
10 Normal mode check Sine sweep 0.5 g 0-pk
11 Dismounting
12 Test completion
7First results TG07 (1)
Sine sweep before/after random
Random vibration White noise
Z accelerometer response X accelerometer
response Y accelerometer response
Resonance search ?0 815 Hz, Q ? 51
Resonance check ?0 809 Hz, Q ? 49
8Last Vib Runs (Mar, 17-19) (1)
Light
1000Hz
660Hz
800Hz
Heavy tray
Mid tray
9Last Vib Runs (Mar, 17-19) (2)
Heavy tray (TS05) Q100 _at_ 660Hz ?
Output-expected 140.4 grms
Applied notching on qual ASD output 16 g2/Hz
(?? Q10) Watch-dog
Input-notched 13.6 grms Output-notched 59.6
grms
10EM Vib Runs Summary (16 trays)
No relevant changes in the resonance frequency
after the random
All trays first mode 500 Hz
11Thermal tests on pre-EM trays set-up
Procedures LAT-TD-1037 Pre-EM Results
LAT-TD-1249
Service box
12Thermal tests on pre-EM trays some results
Stability _at_ plateau dT/dt lt 3C/hr
Tchamber
Tsilicon
Silicon temperature delay ? 45 min
plateau ? 5 hr
13Tray thermal levels
Acceptance Qualification/Survival
Temperature Range -20C ? 35C -30C ? 50C
of cycles 4 4
Temperature rate 20C/hr 20C/hr
Pressure 1 atm T-C 10-5 Torr T-V 1 atm T-C 10-5 Torr T-V
Duration _at_ T extreme 5 hr 5 hr
Total Duration 62 2 hr 72 2 hr
T-C Thermal cycle (dummy trays) T-V Thermal
vacuum (live tray)
On orbit temperature range -15C ? 30C
14Tray thermal sequence
The EM dummy trays will be tested at ambient
pressure into the service boxes
Step Description Level
0 Strain gauges and thermocouple set up
1 Chamber set up
2 Strain gauges calibration
3 Thermal cycles Qualification
4 Dismounting
5 Test completion
15Tower vib levels
Low frequency sine sweep
White Noise
Frequency (Hz) ASD WN Level(g2/Hz) Overall grms Duration (min)
20 2000 10-4 0.45 1
Random vibration
Frequency(Hz) ASD Acceptance Level (g2/Hz) ASD Qualification Level (g2/Hz)
20 0.01 0.02
20-50 5.9 dB/oct 5.9 dB/oct
50-800 0.06 0.12
800-2000 -5.9 dB/oct -5.9 dB/oct
2000 0.01 0.02
Overall 8.7 grms 12.3 grms
Duration 1 min/axis 2 min/axis
High frequency sine sweep
Frequency range 20 ? 2000 Hz
Sweep rate 2 oct/min
Target Amplitude 0.5 g0-pk
16Tower vib set up
- Accelerometers set up (TBR)
- 3 axial on the shaker table (control
accelerometer) - 3 axial on the center of the bottom tray lower
surface - 3 axial on the center of the top tray upper
surface - 3 axial accelerometer X sidewall center of the
thermal boss tray number 12 - 3 axial accelerometer Y sidewall near the center
of the tray number 10 - 3 axial accelerometer Y sidewall center of the
thermal boss of the tray number 1 - 3 axial accelerometer Y sidewall center of the
thermal boss of the tray number 19 - 3 axial accelerometer -X sidewall center of the
thermal boss of the tray number 10 - 3 axial accelerometer -Y sidewall near the center
of the tray number 10, on the center plane
17Tower vib sequence X,Y,Z axis
For each axis
Step Description Test Level
1 Fixture, tower and accelerometers mounting
2 Fixture calibration High frequency sine sweep 0.5 g 0-pk
3 Normal mode search High frequency sine sweep 0.5 g0-pk
4 Pre-random vibration White noise 0.45 grms
5 Random vibration Random vibration -6 dB Qual
6 Post/Pre-random vibration White noise 0.45 grms
7 Random vibration Random vibration -3 dB Qual
8 Post/Pre-random vibration White noise 0.45 grms
9 Random vibration Random vibration 0 dB Qual
10 Post-random vibration White noise 0.45 grms
11 Normal mode check High frequency sine sweep 0.5 g0-pk
12 Low frequency test Low frequency sine sweep Qual
13 Dismounting
14 Test completion
18Tower thermal levels
Thermal-Vacuum cycling/Qual-Surv level Thermal-Vacuum cycling/Qual-Surv level
Ranges -30C ? 50C
of cycles 8 (12)
Temp. rate 20C/hr
Pressure 10-5 Torr
Duration _at_ extreme 12 hr
Total Duration 256 (384) hr stabilization
19Tower thermal set up
Tower covered with a thermal blanket during T-V
cycles.
The tower has a large number of thermocouples in
the read out cables that can be acquired by using
the TKR DAQ system.
- Additional thermocouples (TBR)
- Y sidewall center of the thermal boss of the
tray number 1 - X sidewall center of the of the tray number 1,
on the center plane - Y sidewall center of the thermal boss of the
tray number 19 - X sidewall center of the of the tray number 19,
on the center plane - -X sidewall center of the thermal boss of the
tray number 10 - -Y sidewall near the center of the tray number
10, on the center plane
The temperature control point for the cold part
of the cycle will be the coldest thermocouple,
while the control point for the hot part of the
cycle will be the hottest one.
20Tower thermal sequence
Step Description Level
0 (Strain gauges and) Thermocouple set up
1 Chamber set up
2 (Strain gauges calibration)
3 Thermal vacuum cycles Qualification/Survival
4 Dismounting
5 Test completion
21EM matrix
Item Quantity Quantity to test High freq sine Sweep 20-2000 Hz Random Vibe White noise Low freq sine Sweep 5-50 Hz Functional Thermal Cycle Thermal Vacuum Test site
Panels 24 24 Qual Z axis Qual Z axis ? Centrotecnica (vib)
Live Trays 5 1 Qual Z axis Qual Z axis ? ? Qual Centrotecnica (vib) Alenia (thermal-vac)
Dummy Trays 19 5 vib 19 ther Qual Z axis Qual Z axis ? Qual Centrotecnica (vib) INFN Perugia (in Terni) (thermal)
Tower 1 1 Qual X,Y,Z ? Qual X,Y,Z Qual Alenia