Title: XYZ Port Facility Maritime Security Drill
1XYZ Port FacilityMaritime Security Drill
date
2- Emergency Response
- Security measures compromised
Activation of SSAS
Drill D413
3- Scope
- Date, time, location
- Aim
- Objectives
- Desired outcomes
- Controllers
- Players
- Materials
- Scenario
- Master Events List
- Controller Tasks
- Communications
- Safety
- Debrief
4Drill number X/XX Date Start
Time Location Estimated End Time
5Aim To enhance the proficiency of port facility
security staff in responding to an activation of
the Ship Security Alert System (SSAS) onboard a
ship in the port facility
6- Objectives
- Respond to an activation of the SSAS onboard a
ship in the port facility according to procedure
in the PFSP.
7- Desired outcomes
- Security staff will be able to
- Recognize the various means by which an
activation of the SSAS from a ship alongside may
be communicated to the Port Facility. - Communicate with and render assistance to ship
as required.
8- Control Team
- Chief Controller Security Manager, Mr. AAA
- SSO of participating ship
9- Players
- Security staff on duty
10- Materials
-
- Participating ship
11Scenario The SSAS on a ship alongside the port
facility has been activated. The Flag State has,
through the Port State, requested the port
facility to verify the alert and to provide the
necessary assistance.
12Master Events List
S/N Time Event From To Means of Delivery Expected Response Remarks
001 0900 All participants in position
002 0905 Drill commence Chief Controller All Walkie Talkie None Drill Start
003 0955 PFSO informed of the activation of MV ABCs SSAS Chief Controller PFSO Telephone What did the PFSO do? Were the actions in accordance with procedures?
004 1100 Drill completed Chief Controller All Walkie Talkie Dispersal of personnel/ equipment Drill End
005 1130 Hot Wash Chief Controller All
13- Controller Tasks
- Confirm ship is ready for drill
- Inform security staff that Flag State has
requested port facility to verify the activation
of SSAS - Ship to simulate communication failure and not
respond to any communication from port facility - Ship will confirm activation is due to false
alarm.
14- Communications
- Mobile phone
-
- Walkie-Talkie
- Player Ch YY
- Controllers Ch ZZ
15Code words
Drill Start The drill is to commence
Drill Suspend The drill is temporarily suspended
Drill Go The drill is to resume from where it was suspended
Drill Stop The drill is to be terminated (prematurely)
Drill End The drill is completed
Drill, Drill, Drill The message or statement that follows this preamble relates to the drill only, and is not to be confused with real activity
16- Safety
- Physical safety of personnel is paramount
- There is to be no physical contact between
player and controllers acting as intruders, etc. - Security staff are not to use abusive language
when talking to controllers acting as intruders - Do not neglect the safety of equipment
17- Debrief
- Location
- Secretary
- Attendance
-
-
18Any questions ?