STATUTORY REQUIREMENTS - PowerPoint PPT Presentation

1 / 27
About This Presentation
Title:

STATUTORY REQUIREMENTS

Description:

... we are guided by the government of India ... 1986 Air (Prevention & Control of Pollution Act ... Central Excise Act, 1944 Essential Commodities Act, 1955 ... – PowerPoint PPT presentation

Number of Views:982
Avg rating:3.0/5.0
Slides: 28
Provided by: KOTHARIPR77
Category:

less

Transcript and Presenter's Notes

Title: STATUTORY REQUIREMENTS


1
  • STATUTORY REQUIREMENTS
  • AT POL LOCATIONS

2
An Introduction
  • All our storage locations, its facilities and
    the processes involved in carrying out the
    Receipt, Storage and distribution activities
    are guided by well formulated set of guidelines
    , Controls, manualised systems and procedures
    designed and implemented by our corporation
    which are periodically updated and revised basis
    the experiences encountered and hence, the need
    is felt for bringing a uniformity, consistency
    in all areas and at all locations across the
    country.
  •  

3
  • Over and above all these guidelines, we are
    guided by the government of India through various
    ministries and its statutory bodies and it
    becomes imperative for us to follow and abide by
    the rules and regulations of all the Statutory
    authorities as the case may be for ensuring safe
    and correctly guided working.
  • All of our activities/locations are governed by
    various statutory requirements either at the
    design stage, pre commissioning stage, operating
    stages wherein many of those conditions set /
    guidelines given are to be adhered to .
  •  

4
  • The training Module is developed for covering all
    Statutory requirements at all our Terminals , In
    land relay depots and Tap off points all of
    which are under the major Accident Hazards (MAH)
    installations . 
  • This module is also needed most
  • 1)For new assigned employees and as a refresher
    for the experienced
  • 2)As a check while Handing over and taking over
  • 3)As a guideline when new equipment, facility or
    processes are introduced
  • 3) When licenses have to be revised or updated.
  • 4) Provide latest information to all concerned.

5
  • Efforts are made to make this module
    comprehensive and Organized with a view on the
    Statutory requirements to be ensured - Facility
    wise , equipment wise and process wise .
  • YOUR FEEDBACK IS VERY MUCH ESSENTIAL TO MAKE THE
    MODULE COMPLETE IN NATURE.

6
  • Emphasis today here is made on POL locations
    only.
  • Ist Stage (PROJECT STAGE)
  • NOCS / STATUTORY APPROVALS.
  • List of Approvals required prior to setting up
    the facility , the guidelines for the design /
    construction and meeting the stipulated
    conditions.
  • II nd Stage (PRE-COMMISSIONING/OPERATING STAGE
  • STATUTORY LICENSES. 
  • Obtaining licenses and complying the
    requirements.
  •  

7
  • IIIrd Stage (OPERATIONS)
  • STATUTORY REQUIRMENTS / RECORD KEEPING
  • Reporting to authorities as required, updation of
    modifications, renewals.
  • Carrying out of testing, calibrations, registers,
    Inspections, maintaining records and maintaining
    the facilities in ship shape.
  •  
  •  
  •  

8
Guiding Rules / Acts
  • For facilities / Equipment
  • Petroleum Act 1934 and the Petroleum Rules 2002
  • MSI HC rules, 1989
  • Electricity Act, 2003
  • Central Motor vehicle rules, 1989 Motor vehicle
    Act, 1988
  • Explosive Act, 1884 Explosive rules, 1983
  • Gas cylinder rules, 1981
  • Standard of weights Measures, 1976
  • Factories Act, 1948

9
  • Contract labour Central rules, 1971
  • Environment Protection Act, 1986
  • Air (Prevention Control of Pollution Act, 1981)
  • Water (Prevention Control of Pollution Act,
    1974)
  • Central Excise Act, 1944
  • Essential Commodities Act, 1955
  • Information Technology Act, 2000
  • Public Liability Insurance, 1991
  • Shops Establishment Act

10
PROJECT APROVALS
  • LAND
  • DMs NOC CCOE
    (Layout clearances)
  • DISH /FACTORIES PCB (Consent to
    Establish)
  • PANCHAYAT/MUNICIPAL Port Authority clearance
  • Forest dept clearance ROW
    (right of way)
  • State Industrial Development Board clearance
  • MOEF (For projects gt 50 crores)
  • Airports Authority, clearance (For high masts
    etc)

11
PRE-COMMISSIONING APROVALS
  • Building completion certificates
  • From Development authority, Municipality /
    Panchayat,
  • As-built drawings approval from CCOE Factories.
  • DG set Approval from State Electricity Regulatory
    Commission (ERC).
  • Earthing certificate by competent persons
  • CEA clearance for charging the power
  • DMP approved by District Authorities.
  • OISD Acceptance Committee clearances and
    compliance.

12
LIST OF LICENSES
  • Storage License from CCOE Nagpur (final)
  • Contract labour (Regulation and Abolition) Act
    1970 Registration (COR).
  • State Pollution Control Board Clearance Consent
    Registration under Air and water
  • Factory license (Manpower employed, HP connected)
  • Legal Metrology (weights and Measures dept), PWD,
    calibration clearance for storage tanks/ Proving
    tanks / Flow meters etc.
  • SKO selling License.
  • Potability test for water (For Bore wells).

13
  • Hazardous wastes (Management and handling) Rules,
    1989.
  • Prohibited Areas, Notification in Gazette
  • Central Excise License
  • Customs License
  • CST State ST License
  • State ST/GST Registration
  • Insurance of location Public Liability
    Insurance and Package Insurance (Comprehensive
    Mega Risk Policy)
  • State Excise
  • ESIC, if applicable
  • Any other license as required

14
  • Operating Stage

Equipment Equipment Equipment
Approvals required from Renewal /Testing Frequency
Storage tanks (tankage), allied piping CCOE, DISH, EXCISE/CUSTOMS, FIRE DEPT, Pollution Control Board CCOE - 1 to 5 yrs. Excise - Yearly PCB 1 to 5 years / Fire One time basis NOC.
Storage tanks CPWD / Legal Metrology for calibration CPWD Ten years for water bottom tanks. Legal Metrology - 5 yrs
Buildings / Structures DISH, Development authority, Municipality/ Panchayat DISH Stability by Competent authority once in 5 years.
Electricity connection HT/LT Allied connections Electricity boards, Electricity regulatory authority One time approval Annual inspection cum health testing Electrical Safety Audit once in 3 years.
15
Equipment Equipment Equipment
Approvals required from Renewal /Testing Frequency
Transformer Electricity boards, Electricity regulatory authority One time approval, annual filtration Yearly inspection carried out by Electrical Inspectorate.
DG set Electricity boards, Electricity regulatory authority, pollution control board (only for stack emissions) One time approval for commissioning. Annual returns (CESS) to Electrical Inspectorate
Fire engines (For Stack emissions) Pollution Control Board
VHF / PA system Wireless Planning Co-ordination wing (WPC) Dept.of Telecom 1 to 3 years
Weighbridge/ scales/ weights Legal metrology Yearly
16
Equipment Equipment Equipment
Approvals required from Frequency
Measuring Tapes/Master dip rods / Cans Legal metrology Yearly
Dispensing units Legal metrology/CCOE Yearly
Filling machines/Dosing meters Legal metrology Yearly
Kettles / Boilers DISH 1 to 5 years
Flow meters, Calibration Provers, Legal Metrology Yearly
High Masts Airports Authority One time basis
Tank Trucks RTO, Legal Metrology, CCOE RTO Yearly / Calibration Yearly CCOE 1 to 5 yrs.
Forklifts RTO Yearly
17
Equipment Equipment Equipment
Approvals required from Frequency
BA sets, gas cylinders CCOE approved makes One time basis
FLP fittings CMRI approved makes One time basis
HOT /EOT cranes/Hoisting equipment DISH Yearly for stability of equipment by Competent authority approved by DISH
Compressors / pressure vessel DISH Yearly pressure testing, hydraulic testing once in 4 years by Competent person.
Chemicals/ Additive storage DISH, MPCB
PV vents/Safety and relief Valves DISH Half yearly testing
VSAT/Antenna Towers Wireless Planning Co-ordination (WPC) Dept. of Telecom 1 to 3 years.
18
Utilities Utilities
Approvals required from
Water Development authority, Municipality Panchayat
Drainage Development Authority, Municipality, Panchayat, Pollution Control Board
General Requirements Health Inspector
ESIC/PF/LABOUR REGULATIONS
No Habituation Zone / Prohibited area Protection scheme MOHA
Over all facilities, as applicable CPWD/Railways
Emergency preparedness scheme (For major projects) M O E F
19
REGISTERS TO BE MAINTAINED/RETURNS TO BE SENT TO
THE FACTORY INSPECTORATE.
  • Registers that are required to be
    maintained in a factory and which are to be put
    up for inspection by Inspectors appointed under
    the Act.
  • Register of Adult Workers
  • Muster Roll (Attendance Register)
  • Leave with wages register
  • Register of Accidents and Dangerous Occurrences.
  • Bound Inspection Book containing the following
    details.
  • List of exemptions obtained or availed by the
    factory.
  • Particulars of work rooms.

20
  • Particulars of Painting, white washing etc.
  • Report of examination of pressure vessels or
    plants.
  • Particulars of Manufacture of gas holder.
  • Report of Testing of of Lifting Machines, chains,
    ropes.
  • Test reports of Dust Extraction System.
  • Register containing the names specially trained
    adult workers.
  • Certificate of stability of building and
    fixtures.

21
  1. Certificates of Fitness issued to young persons
    employed in a factory.
  2. Humidity Register
  3. Register of Compensatory Holidays if any given
  4. Register of Child workers
  5. Overtime muster roll for exempted workers (month
    wise)
  6. Health Registers (for factories falling under
    Schedule I to XXV under rule 122).
  7. Register giving details of closure (If the
    factory is seasonal or intermittently operated.

22
LIST OF NOTICES THAT ARE REQUIRED TO BE
PROMINENTLY DISPLAYED IN A FACTORY.
  • Notices of periods of work.
  • An abstract of the Factories Act Rules (In
    English local language).
  • Notice in each work room giving maximum number of
    workers who may be employed in each work room.
  • Names contact nos. of the Dy. Director / Jt.
    Director, DISH/ FACTORIES . Name of the Labour
    Officer / Commissioner.
  • Name contact nos. of the Occupier
  • CCOE License no.
  • Prohibited area (under officials Secrets Act).
  • Notices of prevailing minimum wages.

23
FORMS TO BE MAINTAINED UNDER THE ACT AND CENTRAL
RULES ARE GIVEN BELOW. PARTICULARS MAY BE
MAINTAINED/ SUBMITTED IN THE SAID FORMATS.
  • RULE MATTER
  • Form I 17 (1) Application for
    registration of establishments employing Contract
    Labour.
  • Form II 18 (1) Certificate of
    Registration to be displayed in the premises.
  • Form IV 21 (1) Application for license
    of contractor submitted by contractor prior to
    commencement of work.

24
  • Form V 21 (2) Form of certificate by
    principal employer to be submitted
  • Form VI-A- 25 (2) Notice of
    commencement / completion of work by contractor
    within 15 days of commencement/ completion of
    work.
  • Form VI-B 81 (3) Notice of commencement
    / completion of work by principal employer within
    15days of commencement/completion of work.
  • Form VII 29 (2) Application for renewal
    of license.
  • Form XII 74 Register of Contractors.

25
  • Form XIII 75 Register of Workmen -
    employed by Contractors.
  • Form XIV 75 Employment Card. To be
    maintained for all contract workmen.
  • Form XV 77 Service certificate to be
    given to all contract workmen on completion
    service.
  • Form XVI 78 (1) (a) muster roll for all
    contract workers employed on premises.

26
  • Form XX 78 (I) Deductions from Monthly register
  • (ii) Wages.
  • Form XXII do-Register of Advances Monthly
    register.
  • Form XXII do Register of O.T Monthly
    register.
  • Form XXV 82 (2) Annual return to be annually sent
    by employer to registering officer.

27
IT IS VERY ESSENTIAL FOR ALL OF US TO BE ABREAST
/ UPDATED WITH AMENDMENTS IN LAWS / ACTS ALL THE
TIME AND CUSTOMIZE THESE GENERAL GUIDELINES BEING
EXPLAINED HERE JUDICIOUSLY TO EACH OF OUR
LOCATIONS AND WORK AREAS FORIMPLEMENTATION.OVER
AND ABOVE ALL, WHENEVER A PROCESS IS MODIFIED,
FACILITY IS AUGUMENTED/ADDED. NECESSARY PLANS TO
BE APPROVED, RISK ASSESSMENT CARRIED OUT,
LICENSES TO BE AMENED.
Write a Comment
User Comments (0)
About PowerShow.com