Title: FREIGHT


1
OPERATING DEPARTMENT
FREIGHT
2009 - 2010
2
FREIGHT OPERATIONS
  • Implementation of Operation Chetak
  • Running time of trains was calculated on absolute
    basis i.e. running was calculated at the speed of
    75 Kmph and 60 Kmph (for Sumo rake). Analysis of
    detention is done against these timings. This
    has led to improvement in running of trains.
    Diesel loco utilization improved by 0.47 and
    electric loco utilization improved by 2.96.
  • Extended Crew runs
  • Emphasis was put on extended crew runs so as to
    cut down detention at major terminals like
    Varanasi, Roza, Ambala and Ludhiana. Average 800
    crack trains were run per month during
    2009-2010as against 598 cracks per month in the
    last year. The extended crew runs have led to
    reduction in running timing of power house rakes
    being received at MGS, 38-40 hrs. which used to
    be 60 hrs.

3
  • Breaking the mould -
  • Divisions are being encouraged to provide out of
    box solution to problems.
  • Shortage of diesel locos led to running of long
    haul jumbo empties over Moradabad division.
  • Now 22 loaded BCN wagons are being run in
    Haridwar Rishikesh / Harawala section with
    single WDG-3 loco as against 14 which were run
    earlier and full empty rake of jumbo is run with
    a single power on this section
  • Multi has been replaced by single WDG4 on PTK-JAT
    section.
  • Running of Down trains through to PBH and UP
    trains on FD loop
  • To overcome shortage of jumbos N.R. used premium
    BCN rakes for internal loading and were able to
    achieve 4 loadings during their premium validity
    . This helped to maximize loading despite the
    shortage.
  • Delhi division streamlined movement between
    GZB-SBB by making it direction wise reducing the
    running time to 20-30 min from 1-130 hrs. LKO
    division is also attempting similar exercise.
  • Formulated guidelines regarding sidings of PCOs
  • Standardizing statistical formats for divisions.

4
  • Enabling through IT -
  • New Operating website URL http//10.2.2.19/dept/o
    perating/index.htm
  • Enables Operating Officers have topic wise
    availability of circulars Rate Freight
    Circulars, Freight Marketing Circulars, Traffic
    Transportation Circulars and many other useful
    links.
  • Archival formats of Central Control to be
    generated from FOIS and record keeping to be made
    digital, reducing requirement of storage space
    and manpower.
  • Concept Plan-
  • Divisions have been asked to make long time plan
    for enhancement of freight terminal capacity and
    line capacity. LKO ,MB divisions have been
    reviewed.

5
REVENUE EARNING LOADING (In Million Tonnes)
SN COMMODITY TARGET APR TO MAR ACTUAL APR TO MAR ACTUAL APR TO MAR age Variation over last year age Variation over Target
SN COMMODITY 2009-10 2008-09 2009-10 age Variation over last year age Variation over Target
1 FOODGRAIN 14.50 14.97 18.62 24.38 28.41
2 FERTILIZER 6.60 6.36 6.75 6.13 2.27
3 POL 5.75 5.73 6.35 10.82 10.43
6 CEMENT 3.02 2.74 2.49 -9.12 -17.55
4 IRON STEEL 0.13 0.03 0.02 -33.33 -84.62
5 CONTAINER 5.72 6.13 6.64 8.32 16.08
7 OTHERS 5.48 4.15 4.39 5.78 -19.89
8 TOTAL 41.20 40.11 45.26 12.84 9.85
Northern Railway has achieved everbest
loading during 2009-2010
6
OPERATING PERFORMANCE
S.N. ITEMS APR - MAR APR - MAR age variation
S.N. ITEMS 2008-2009 2009-2010 age variation
1 THROUGH PUT (Wagons per day) 12400 13487 8.77
2 TOTAL RECEIPTS (Wagons per day) 6200 6746 8.81
3 TOTAL DESPATCHES (Wagons per day) 6200 6741 8.73
4 LOADED RECEIPTS (Wagons per day) 4970 5709 14.87
5 WAGON TURN ROUND (Days) 1.35 1.34 -0.74
6 REVENUE LOADING EARNING (Crores Rs.) 3568.08 4296.85 20.42
7 REVENUE LOADING (Million tonnes) 40.11 45.26 12.84
8 DIESEL LOCO UTILISATION (Kms/loco/day) 531.5 534 0.47
9 ELECTRIC LOCO UTILISATION (Kms/loco/day) 489.5 504 2.96
10 CRACK TRAINS RUN (per month) 598 800 33.78
7
Status of FOIS projects on Northern Railway
DIVIN RMS RMS TMS (PHASE - I) TMS (PHASE - I) TMS (PHASE - II) TMS (PHASE - II)
DIVIN Sanctioned Commissioned Sanctioned Commissioned SanctionedPh I of TMS PhII CommissionedPh I of TMS PhII
DLI 8 7 13 12 7 3
MB 2 2 6 6 4 2
UMB 6 6 20 20 4 3
LKO 3 3 7 7 4 1
FZR 5 5 16 16 4 4
TOTAL 24 23 62 61 23 13
Note - For TMS Phase-II of Phase II , 139 New
locations have been sanctioned
8
Status of FOIS projects on Northern Railway
DIVIN ICMS ICMS CMS CMS COA COA
DIVIN Sanctioned Commissioned Sanctioned Commissioned Sanctioned Commissioned
DLI 6(12) 6(10) 13 13 6 6
MB 5(10) 5(10) 7 7 5 5
UMB 6(12) 6(12) 5 5 4 4
LKO 3(7) 3(7) 8 8 6 6
FZR 6(10) 6(10) 7 7 4 4
NDBH 1(14) 1(14) 0 0 0 0
TOTAL 27(69) 27(67) 40 40 25 25
9
OPERATING DEPARTMENT
OPERATING SAFETY
2009 - 2010
10
  • Achievements and Innovations
  • Total number of amendment slips issued as
    under-
  • GSR Book - 17
  • Operating Manual - 01
  • Block Working Manual - 03
  • Accident Manual - 03
  • Master Amendment Slip for LC gate working
    - 01
  • Operating Safety Seminars Meetings organized
    at
  • HQs level 02

11
  • ZRTI/ Chandausi
  • Achievements-
  • Committee of 3 SAG officers (COM/G,CEGE
    CE/PD) visited ZRTI/CH
  • for improvement/ upgradation of the training
    facilities at ZRTI/CH.
  • The problem of messing charges to be realized
    from trainees has been
  • resolved.
  • Training courses on Disaster Management for
    Supervisors has been
  • introduced.
  • Training Modules of Induction Course for multi
    skilled group D staff
  • approved and implemented.
  • The Training Modules of Induction Course for
    multi skilled group C
  • Category, Station Assistant has also been
    approved and implemented.

12
  • Innovations-
  • Long awaited reprint of GSR book of N.Rly with
    latest Correction Slip no.147 dt.05.04.10 has
    been approved for printing and will be supplied
    to all Divisions by April.
  • New revised Operational forms for train
    operations has been approved and supplied to the
    divisions for smooth operations.
  • Data Base of SWRs with Station diagrams and
    Traffic LC gates on proper prescribed proforma
    with details of Civil Police authorities, Fire
    Brigades, Hospitals and NGO etc of all the
    stations of N.Rly being prepared.
  • Establishing a Work Station for training of Optg
    staff of NR on IT matters to assist in IT
    projects (under process)

13
OPERATING DEPARTMENT
PLANNING
2009 - 2010
14
Functions of Operating Planning Cell in Head
Quarter.
  • To co-ordinate with divisions ,examining, and
    finalizing of works pertaining to Plan
    Head-11(New lines ,gauge conversion), 15
    (Doubling) and 16 (Traffic facility).
  • Monitoring of the progress of on going works
    under plan head- New line, Gage conversion,
    Doubling, Traffic facility etc.
  • To co-ordinate with Non interlocking works.
  • To examining ESPs keeping in view the operating
    facilities.
  • To prepare preliminary Works Programme of Vol-II
    complete in all respect and sending it to Railway
    Board.
  • To examine plans of level crossing gates.
  • Examining and processing of Private Siding
    Proposals.

15
Improvements- Planning cell
  • Development of works Programme Data Base.
  • Development of Data Base of Private Siding
    proposals.
  • Short CSL running line identified over Northern
    Railway network- 1 station completed and works at
    51 stations are under progress.
  • JPO for finalizing check list for processing
    Engine Scale Plan.
  • Policy for provision of RD lines at Private
    Container Sidings issued.
  • PI/RRR commissioned at 37 stations yards during
    2009-10.

16
Performance of Planning Cell
  • 60 number of works were sanctioned in vol V
    (2009-10) within GM Power.
  • A total No. of 33 works were proposed to Rly
    Board out of which 11 nos of works have been
    sanctioned by Railway Board in Vol II (2010-11).
  • Works under progress-
  • New Lines Works 12
  • Doubling works 15
  • Traffic Facility works 49
  • Law Book 19
  • Volume V works 64
  • No. of ESPs finalized other than level crossing
    gates - 63
  • 3 works under Plan head 15 25 works under Plan
    head 16 were completed during 2009-10

17
Streamlining of Procedures for Private Siding
proposals
  • A separate cell headed by Sr.Scale Officer setup
    to process Private Siding proposals
  • Clearly delineated procedure for processing of
    proposals
  • Ensures availability of appropriate operational
    facilities and accurate traffic projections.
  • Ensure all charges payable to Railways are
    submitted.
  • Ensures timely execution of work and
    commissioning

18
OPERATING DEPARTMENT
COACHING
2009 - 2010
19
SPECIAL TRAINS RUN
2009-2010
SPECIAL TYPE APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
SUMMER SPECIAL 818 1089 1081 42 0 0 0 0 0 0 0 0
PARA-MILITARY SPECIAL 3 56 2 0 18 7 3 5 0 0 0 4
DURGA PUJA SPECIAL 0 0 0 0 0 508 0 0 0 0 0 0
MELA SPECIAL 0 0 16 0 0 0 0 0 0 72 66 85
DIWALI/WINTER SPECIAL 0 0 0 0 0 0 1338 569 552 439 0 0
UNION SPECIAL 0 0 0 0 0 0 0 0 0 0 0 0
YATRA SPECIAL 6 5 5 2 12 5 11 11 10 14 11 11
EXTRA SPECIAL 1 48 10 511 347 24 0 6 9 5 360 468
TOTAL 853 1198 1114 555 377 544 1352 591 571 530 437 568
20
TRAINS INTRODUCED/EXTENDED/ FREQUENCY INCREASED
DURING 2009-10
  Introduction Introduction Total Extension Extension Total Increase in Frequency Increase in Frequency Total
  NR FR Total NR FR Total NR FR Total
Duronto 4 7 11     0     0
Yuva 0 2 2     0     0
Mail/Exp. 4 12 16 2 3 5 4 3 7
Passenger 0 0 0 1   1     0
EMU 4 0 4 1   1     0
Total 12 21 33 3 3 6 4 3 7
21
Punctuality age of Mail/Express Trains
Months Punctuality
Apr-09 77.30
May-09 79.00
Jun-09 82.80
Jul-09 83.50
Aug-09 84.60
Sep-09 75.00
Oct-09 66.90
Nov-09 66.60
Dec-09 67.80
Jan-10 40.00
Feb-10 59.00
Mar-10 66.70
Cummulative 70.80
Note The COA system became operational in
October09, Thus heralding real-time
feeding of time and 1 minute Punctuality
22
THANK YOU