INSURV AD/SD DTE DEMONSTRATION (sample brief) updated 07 Nov 11

1 / 19
About This Presentation
Title:

INSURV AD/SD DTE DEMONSTRATION (sample brief) updated 07 Nov 11

Description:

Required Other Notes Operators will record: AAWC IFF Detection Range ASTAC UHF Comms Loss/Gain and TACAN Range RSC Radar Detection Ranges MSS ... –

Number of Views:250
Avg rating:3.0/5.0
Slides: 20
Provided by: FrankMig2
Category:

less

Transcript and Presenter's Notes

Title: INSURV AD/SD DTE DEMONSTRATION (sample brief) updated 07 Nov 11


1
INSURV AD/SD DTE DEMONSTRATION(sample
brief)updated 07 Nov 11
UNCLASSIFIED
2
NOTES
  • This is a sample brief only and does not need to
    be copied verbatim. It does, however, reflect
    all items that INSURV inspectors need to see as
    part of the AD/SD DTE brief in order to ensure
    there are few, if any, questions prior to
    commencing the exercise. Please do not omit any
    required slides as noted.
  • This is designed for ships that will conduct both
    Area Defense and Self Defense. Ships performing
    SD only will need to tailor accordingly.

3
References
Required slide
  • (a) INSURVINST 4730.21(series) Area Defense Self
    Defense Detect To Engage
  • (Include any other references such as PMS or
    local instructions.)

UNCLASS
4
Watch Stations
  • Include your watch bill for the evolution here.

5
Communications
  • This is where you can include any communication
    info

6
Equipment Readiness
Required slide
  • All systems are fully operational
  • (Annotate any system discrepancies here)
  • All pre-fire checks were completed satisfactorily
  • (Provide status of pre-fire checklist to Senior
    C5 Inspector at brief and completed copy before
    Demo)
  • FIS/RLEP PMS check was completed within 30 days
    per INSURVINST 4730.21J.
  • (state accomplishment date and provide the signed
    memo to WP inspector)

UNCLASS
7
System Configuration
Required slide (for applicable weapons onboard)
VLS
  • System in Test
  • SIM Load
  • Auto-SM statement INSURV AUTO SM activated
  • Fire Authorization Bypass off (MSS in the loop)
  • CAW off
  • MR only
  • One MK99 Illuminator will illuminate the target
    A/C at a time
  • Firing policy of S-L-S
  • Fore/Aft SM Permitted.
  • Fore/Aft Magazines Authorized
  • CEC Off

IAW MIP 8443 OCSOT
8
System Configuration
Required slide (for applicable weapons onboard)
  • GUNS
  • MT 51/52 TRAINING, SIM loaded
  • GFCS will acquire and track at maximum effective
    range
  • The gun will train, elevate and simulate firing
    (including cycling the ammunition loading system)
  • Minimum of 15 rounds expended
  • (Place your gun system configuration here)

9
System Configuration
Required slide (for applicable weapons onboard)
  • CIWS
  • ARMED
  • HOLD FIRE Deselected
  • SECTOR HOLDBACK TOOL Removed
  • FIRING CIRCUIT Closed
  • HIGH POWER
  • PASS LOADED
  • MAGAZINE LOADED WITH DUMMY AMMUNITION
  • AAW AUTO
  • AUTO DESIG Enabled (1 run), Deselected (1 run)
  • PHALANX DESIG TEST Enabled
  • AUTO POWER Off
  • RCP Control
  • MWC Enabled (if available)

10
System Configuration
Required slide (for applicable weapons onboard)
NSSMS
11
System Configuration
Required slide (for applicable weapons onboard)
  • RAM
  • Block 0 or Block 1 FRS/CRS will be used
  • SLQ-32 interface operation (if applicable)
  • Etc

12
System Configuration
Required slide
  • Include CDS status, doctrine statements (speed
    gates, ID doctrine, etc) as applicable

13
DTE Sequence
Required slide
  • A/C vectored to range IAW AREPS, 30,000 ft
  • A/C turns inbound and will be manually dropped.
  • A/C detected and engaged by SM2 by doctrine at
    max range.
  • No track refresh rate change (ex. TACSIG) during
    detection phase, no bypasses
  • Each illuminator will be downed upon successful
    engagement.
  • Upon completion of AD DTE, A/C to descend to
    300ft _at_ 40nm and track manually dropped, then
    commence SD DTE
  • Radar contact, then engagement by GWS, ESSM, and
    CIWS
  • Upon completion of the first SD run, the A/C will
    be vectored out to approx 15nm and engaged again
    until all weapon systems (and MWC, if applicable)
    have been demonstrated. (provide detailed
    explanation of your run sequence plan)
  • (Ensure a copy of AREPS report is available to
    Senior C5 Inspector at brief)
  • (Tailor the sequence of events to best suit your
    ships capabilities and locale.)
  • (It is generally a good idea to include a screen
    shot of OPAREA and anticipated ships maneuvering
    to include a/c radials)

UNCLASS
14
Procedure
Required slide
  • Include any specific ship procedures here.
  • Include which ship radials you expect engagements
    to occur on, including what weapon systems you
    anticipate being exercised for each run.
  • ...

15
Other Notes
Required slide
  • Operators will record
  • AAWC IFF Detection Range
  • ASTAC UHF Comms Loss/Gain and TACAN Range
  • RSC Radar Detection Ranges
  • MSS Illuminator assigned for each SM
    engagement, Range of each engagement
  • MT 51 of Rounds Expended
  • CIWS of Rounds Expended and First Detect
    Range (and obtain PASS data printout for WP
    inspector if requested)
  • Comms with A/C will be placed in an overhead
    speaker by AIC for INSURV inspector.
  • Internal CIC net (ex. Net 15) will be placed on a
    speaker near either the TAO, CICWO, AAWC, or
    radar operator console
  • Each evolution will commence and complete upon
    indication from the Senior C5 Inspector that
    INSURV is ready and has seen everything they
    need.

16
Other Notes (continued)
Required slide
  • TACAN Father checks will be accomplished every
    10nm during outbound (if a/c is to check-in and
    mark-on-top prior to starting this event) or
    inbound leg.
  • Aircraft is carry an I (or J, etc) band EW pod
    and will activate by 100nm.
  • EW Operator will report threat over internal CIC
    net when acquired and when correlated to track.
    INSURV inspectors will then verify. When
    requested by INSURV, AIC will ask pilot to kick
    to different pod frequency. Both sides of SLQ-32
    will be verified during SD DTE runs.

17
Safety
  • Include any safety criteria.

18
ORM
  • Include any Risk Management.

19
Questions