... and Seepage * Fiscal Year Acres Disturbed Plans Reviewed 06 28926.67 5194 07 24134.75 3880 08 13801.45 3684 09 ... – PowerPoint PPT presentation

Number of Views:48
Avg rating:3.0/5.0
Slides: 19
Provided by: lzd3
Category:

less

Transcript and Presenter's Notes

Title: Dfjkasdf;ajsdfasff


1

Urban Lands Supervisor TrainingAugust 17 -18,
2012
Guerry Thomas Resource Specialist gthomas_at_gaswcc.o
rg
2
Program Updates
  • Education and Certification course revisions
  • The Manual for Erosion and Sediment Control in
    Georgia
  • Plan reviews

3
Education and Certification
  • GSWCC is revising all course material, starting
    with Level IA. The Level IA
  • revision will be completed in October and a pilot
    course offered in
  • November
  • Changes
  • Two manuals for each course
  • Student manual - will read more like a text book
  • Trainer manual - guide for trainers that will
    prompt an interactive course.
  • A summary page at the beginning of each section.
  • Thorough index to locate information
  • Exam questions will be revised to correlate with
    new material

4
Certification Numbers
5
The Manual for Erosion and Sediment Controlin
Georgia (Manual)
  • Contains standards and specifications that are
    followed and practiced in the State of Georgia.
  • Chapter 6 focuses on specifications for planning,
    design and installation of ES measures

6
319 BMP Grant
  • GOALS
  • Establish a process and procedures for
  • accepting new practices into the Manual.
  • Revise outdated information
  • Incorporate information from other related
    manuals (Stormwater/DOT)

7
BMP Grant Objectives
  • Establish a Technical Advisory Committee that
    will be
  • responsible for
  • Determining what tests and test methods should be
    accepted and adopted by GSWCC.
  • Establishing procedures and criteria for
    accepting new practices into the Manual.
  • Act as subject matter experts to GSWCC regarding
    other revisions to the Manual.
  • Determine criteria for testing facilities

8
Technical Advisory Committee
  • Committee Members
  • Joshua Escue
  • Dr. Britt Faucette, CPESC, LEED (Chair)
  • Adena Fullard, PE, CPSWQ
  • Reece Parker, RLA, ASLA, CLARB, LEED
  • Jim Sloan CPESC, CPSWQ
  • Brian Watson, PE, PH
  • Committee Advisors
  • Davie Biagi, Registered Architect, GA DOT
  • Diane Guthrie, PE, NRCS
  • Marc Mastronardi, CPESC, CPSWQ, GA DOT
  • Dewey Richardson, GA EPD

9
BMP Grant Objectives
  • Determine what tests and test methods should be
  • accepted and adopted by GSWCC for the following
  • BMPs
  • Sediment Barriers (Silt fencing)
  • Inlet sediment traps
  • Tackifiers and binders
  • Checkdams
  • Channel stabilization
  • Polyacrylamide (PAM)

10
BMP Grant Objectives
  • Contracted with TRI Environmental, Inc to
  • conduct testing for sediment barriers and
  • checkdams

11
(No Transcript)
12
Sediment Barriers
  • Selected a test that incorporates ASTM standards.
  • The test was chosen because it best represents
    real
  • world conditions.
  • Tested practices for Type A, B and C applications
  • Used a soil mixture that is common in GA
  • Test simulated 2,4,6 hour rain events

13
Checkdam
  • Selected ASTM D7208 Standard Test Method for
  • Determination of Temporary Ditch Check
  • Performance
  • Practices Evaluated
  • Stone check dams
  • Hay bales
  • Products listed on the GSWCCs Approved Products
    List for Compost Filter Socks
  • Georgia Department of Transportations (GA DOT)
    velocity dissaptor practice

14
Check Structure over Bare Soil
Initial Flow and Upstream Ponding
Increased Ponding and Seepage
15
General Revisions
  • Working with state and federal agencies to
  • update information and technical guidance.
  • Recommending the adoption of new practices
  • Temporary Sediment Traps
  • Silt curtains

16
Expected Outcome
  • Once the grant has been completed, GSWCC
  • will have established benchmark standards for
  • specific BMPs in the Manual that new practices
  • will be reviewed against.
  • New practices that meet or exceed current
  • standards will be considered for inclusion into
    the
  • Manual.

17
Public Comment Period
  • A draft of the revised Manual will be
  • released for a public comment period before
  • changes are finalized.

18
Snapshot of Development