Title: Product Mix
1Product Mix Throughput Adjustment of TargetsPMO
- Gareth Stace
- Dairy Energy Savings
2Are you meeting your second milestone target ?
- YES No worries
- NO Problem
- Are there a solutions ?
- Yes
- Need to find the right one for you
3Can you be re-certified along with the rest of
the sector if the sector passes the overall
target?
- DANGER
- Emissions Trading
- Ring Fencing
4What are the options open to you to avoid losing
the rebate ?
- Tolerance Band
- Regulatory Constraint
- Buy Carbon Dioxide Allowances
- Or Use PMO
5Has your Site Seen a Significant Drop in
Throughput, or a Change in the Mix of Products
the Site Produces?
6This is an Overview of PMO
- For greater scope of this tool
- See DEFRA Document CCA 08
- Guidance on How to Adjust Targets to Allow for
Product Mix and Throughput Changes
7What Will You Need ?
- Good data
- Weekly, or monthly
- From base year, or even target period (two
methods of calculation) - Complying with qualitative requirements
8How Production EffectsYour Target
9There is no single required approach the
approach taken will depend on facilitys
circumstances
- Just a simple approach tackled here
10How is This Done ?
- The target is adjusted, not the data
- Need to establish a relationship between base
data and performance in the target period - Regression analysis
11Monthly Data for a Large DairyExample 1. Data
from base year
12Historic Recent Data
13Regression Chart for Electricity
14Regression Chart for Gas
15Perform the Calculation
Original milestone target 382.01 Target year
performance 561.78
16Method if no Base Year Data is Available
- Use data from the target period
- Slightly more difficult to calculate
17Monthly Data for a Large DairyExample 1. Data
from target period
18Historic Recent Data
19Regression Chart for Electricity
20Regression Chart for Gas
21Target Period CalculationHow Does it Differ ?
- Need to Calculate 3 different SECs
- SEC 1 Base year production applied to our new
ymxc - SEC 2 Target period production applied to our
new ymxc - SEC 3 Base year SEC from original data
22What Now ?
- Need to find a new SEC that will be the adjusted
SEC - SEC4 SEC3(SEC2/SEC1)
23Perform the Calculation
- SEC 1 Base year production (monthly) applied to
our new ymxc - y 332.38 32,828 3,346,139.37
- Therefore, y 14,257,510
- SEC 1 14,257,510 / 32,828
- SEC 1 434.31
24Perform the Calculation
- SEC 2 Target period production applied to our
new ymxc - y 332.38 17,054 3,346,139.37
- Therefore, y 9,014,604.52
- SEC 2 9,014,604.52 / 17,054
- SEC 2 528.59
25Perform the Calculation
- SEC 3 Base year SEC from original data
- SEC 3 451.08
- Need now to find SEC 4
- SEC4 SEC3(SEC2/SEC1)
- 451.08(528.59/434.31) 549.00
- New MS2 Target (SEC4 - 2.3) 536.38
- Target year performance 561.78
26Product Mix Issues
Throughput not the problem A shift from one
product produced to a more energy intensive
product since base year One possible answer is
multiple regression Excel will do this for
you Same calculation as throughput adjustment,
but with more than one m (ymxc)
27Historic Recent Data
Base Year Data Base Year Data Base Year Data
 Annual Monthly
Product A 147,346 12,279
Product B 98,231 8,186
Electricity 57,163,928 4,763,661
Gas 62,402,438 5,200,203
Base Year SEC (kWh/tonne) Base Year SEC (kWh/tonne) 486.88
MS1 Target SEC (kWh/tonne) MS1 Target SEC (kWh/tonne) 475.68
Target Year Data Target Year Data Target Year Data
 Annual Monthly
Product A 99,506 8,292
Product B 145,219 12,102
Electricity 73,901,907 6,158,492
Gas 76,687,547 6,390,629
Target Year SEC (kWh/tonne) Target Year SEC (kWh/tonne) 615.34
28Perform the Calculation (base year data)
Elec Elec Gas Gas
Intercept 3,302,948.37 Intercept 654,164.92
Product A 158.28 Product A - 194.18
Product B - 97.72 Product B 829.82
Total Intercept Product A Product B
 3,957,113.29 - 35.90 732.10
Apply the constants to the target year data with
the following equation
New SEC 3957113 (-35.908292) (732.112102)
/ (829212102)
29Perform the Calculation
New SEC 3957113 (-35.908292) (732.112102)
/ (829212102) New SEC 613.86 New MS2 Target
(New SEC 2.3) 599.75 Old MS2 target
475.68 Target year performance 615.34 Again
target year performance doesnt meet new target,
but goes a long way there
30What Next ?
- Look at your data
- If you are not going to meet your target, read
CCA08 from DEFRA - Perform some analysis
- See if that helps
- Most important, please contact me if you think
that you will not meet your target
31Timetable
- Look at your data as soon as possible
- If you believe that this approach will not work
for you, contact me soon - All data to be submitted at the same time
32What I Will Do?
- Be on hand to assist members
- Issue a template for sites to submit all
necessary information for DEFRA - It will not be easy
33Gareth Stacegstace_at_dairyUK.orgTel. 020 7467
2602Fax. 0207487 4734Dairy UK93 Baker
StreetLondon, W1U 6QQ