CGC HEALY Commissioned in 2000 Funding shortfalls Experiencing obsolescence of electronic control systems Spare parts inventory POLAR Breakers - Aging Assets CGC ... – PowerPoint PPT presentation

Number of Views:52
Avg rating:3.0/5.0
Slides: 8
Provided by: KerryLF5
Learn more at: https://www.nsf.gov
Category:
Tags: cgc | healy | breakers

less

Transcript and Presenter's Notes

Title: CGC HEALY


1
CGC HEALY
  • Commissioned in 2000
  • Funding shortfalls
  • Experiencing obsolescence
  • of electronic
  • control systems
  • Spare parts inventory

2
POLAR Breakers - Aging Assets
  • CGC POLAR STAR
  • 29 years of service
  • 17 Deep Freeze missions, including 2004-2006
  • CGC POLAR SEA
  • 27 years of service
  • 16 Deep Freeze missions, including 2001-2004

3
Engineering Status
  • Complex propulsion plant
  • Optimized 70s technology to meet requirements
  • Achieved reliability through redundancy
  • Current condition
  • Critical systems require replacement or upgrade
  • Obsolescence
  • concerns
  • Reliability
  • concerns

4
Sustainment Plan
  • Short term
  • Goal of improving reliability to continue to
    accomplish the Deep Freeze mission annually
  • CGC POLAR SEA is in a two-year maintenance
    availability
  • CGC POLAR STAR will undergo similar repairs in
    FY07 and FY08
  • Long term
  • Initiate major acquisition process to upgrade or
    replace heavy icebreakers

5
FY05 Funding Status
  • HEALY
  • CG has obligated 4.1M baseline maintenance
    funding
  • CG has obligated 4M above baseline to prep for
    AWES 05
  • POLAR STAR
  • All FY05 baseline Polar Class maintenance funding
    obligated
  • to PSTAR7.4M.
  • CG has obligated 3.6M above baseline
  • Ensure readiness for DF06 deployment
  • POLAR SEA
  • CG has obligated 4.8M above baseline
  • Working with NSF for transfer of 9.2M in
    OMB-directed split of FY05 extraordinary
    maintenance expenses
  • Maintain progress toward readiness for DF07
    deployment

6
Bridging Strategy(short term)
  • Address reliability, safety, and obsolescence
    through upgrade or replacement
  • Key systems include
  • Main propulsion motors
  • Main diesel engines
  • Shafting
  • Central hydraulic system
  • Motor safe boat
  • Gas turbines

7
Acquisition Process(long term)
  • Initiate acquisition process for heavy
    icebreakers
  • in accordance with DHS procedures
  • First asset will not be available until approx. 6
    years after funding becomes available
  • Multiple options will be compared as part of an
    analysis of alternatives
  • Shift of Polar Icebreaker funding to NSF in FY06
    may affect process to obtain acquisition funding
  • Will likely require a national icebreaker policy