Transcript and Presenter's Notes

Title: LONG BEACH, CALIFORNIA


1
October 18-20, 2010
LONG BEACH, CALIFORNIA
2
October 18-20, 2010
LONG BEACH, CALIFORNIA
Airside Capacity Evaluation Techniques
Matt Davis Assistant Director of
Planning Hartsfield-Jackson Atlanta International
Airport Matt.Davis_at_Atlanta-Airport.com
3
Agenda
  • Define the Problem
  • Whats the Appropriate Tool?
  • What are Your Data Sources?
  • Challenge Your Assumptions
  • Gain Consensus

4
Define the Problem
  • What Is Your Airfield Problem?
  • What Do Your Stakeholders Think the Problem is?
  • Is it in the Airspace?
  • Other Airport Conflicts?
  • Obstacles?
  • Noise Abatement Routes?
  • Is it on the Ground
  • Taxi in/Taxi Out Delay?
  • Runway Crossings?
  • Apron Congestion/Gate Availability?
  • How Do You Define Your Problem?
  • Demand versus Capacity, Delay, Or Something Else?
  • Air and/or Ground Delay
  • Gate Utilization
  • Payload/Range

5
Sample Problems
  • San Antonio Airspace
  • San Antonio International Airport
  • Runway 3-21 Vs Randolph Air Force Base 15-33
  • Stinson Municipal ILS on Runway 14-32
  • Kelly Air Force Base Runway 15-33
  • Stinson Municipal Airport Runway 14-32
  • San Antonio International Airport Runway 12-30

6
  • SAT Airspace Image

7
Sample Problems
  • Ground
  • Hartsfield-Jackson Atlanta International Airport
  • 6th Runway?
  • Air and/or Ground Delay versus Taxi times
  • South Gate Complex?
  • Gate Utilization/Availability
  • Air and/or Ground Delay versus Taxi times
  • Extension of Runway 9L-27R
  • Payload/Range
  • Extension of Runway 10-28
  • Air and/or Ground Delay versus Taxi times vs. 6th
    Runway

8
ATL 2009 Comprehensive Development Plan
9
Gate Metrics
10
Gate Metrics
11
2008 ATL Gate Analysis
12
2008 ATL Gate Analysis
13
Gate MetricsAirfield Capacity vs Gates
Source Jacobs Consultancy, February 2008
14
Gate MetricsAirfield Capacity vs Gates
Source Jacobs Consultancy, February 2008
15
FAA ASV Delay Curve
16
Whats the Appropriate Tool?
  • Traditional Airfield Capacity Tools
  • AC 150/5060-5a Airport Capacity Handbook (ACRP
    currently studying an update to this 1985
    document).
  • FAA Airfield Delay Model (Another 1980s cheap
    solution)
  • Airfield Simulation Models (Very Complex Very
    Expensive)
  • SIMMOD, TAAM, Airport Machine and FAA Technical
    Center RDSIM. This is not an exhaustive list.
  • Gate Scheduling Models
  • Numerous commercial and proprietary software
    packages are available.

Airfield Models Are Data Sensitive. The Lack of
Quality Data Can Make Your Results Suspect.
17
Tool Box
  • Handbooks/nomographs
  • (FAA Airport Capacity and Delay Advisory
    Circular)
  • Analytical models
  • (time-space diagrams, FAA Runway Capacity and
    Annual Delay models)
  • Runway queuing models
  • (LBs AirSim, Delays)
  • Microsimulation models
  • (SIMMOD, ADSIM/RDSIM, TAAM)
  • Real-time simulation methods
  • (FAA and NASA tower simulators)

18
ATL ASV Calculation
19
VTASIM Range of Results
20
VTASIM Range of Results
21
SIMMOD Sample
  • Simmod Video clip

22
What Are Your Data Sources?
  • Analysis is only as good as the data from which
    it is derived from.
  • Official Airline Guide (OAG) for Airline Schedule
    Information
  • Does not include Cargo, Charter, Military or
    General Aviation Operations
  • FAA - ASPM, Tower Counts, and ASR-9 records.
  • RITA BTS
  • Only includes those airlines that provide ACARS
    data to FAA
  • No International Flight Information
  • Airport Records
  • Recorded Observations
  • Sensis Aerobahn
  • Passur

23
VTASIM Range of Results
  • AeroBahn clip

24
Challenge Your Assumptions
  • How Do the Airlines/ATC Respond to These Events
    at Your Airport
  • IMC Conditions What is the split between VMC and
    IMC?
  • CAT II and below how often are you in low
    visibility conditions?
  • Snow/Icing Conditions Throw their hands up in
    the air and quit?
  • What is the Impact of the Airlines Business
    Plans on Your Analysis?
  • What Are the Little Things You Can Do To Make
    Valuable Improvements?
  • End Around Taxiways
  • Strategically Placed High Speed Exits
  • New Runway Crossing Locations

There Are Several Small Improvements That Can Pay
Off In The Long Run.
25
Gain Consensus
  • Get Agreement Up Front on The Metrics You Will
    Use
  • How Detailed Do The Results Have To Be?
  • Delay in the Apron Areas, Runway Crossing, or
    Departure Queue
  • Overall Taxi times. (Delay plus unimpeded taxi
    time)
  • Whats Important and to Whom?
  • How Important is Safety When You are Preparing a
    Benefit/Cost Analysis?
  • How Do You Measure Safety if Your Concern is
    Efficiency?
  • What if There is No Differential Savings in the
    Results, but the Outcome is More Predictable?
  • Whats Your Definition of Acceptable Delay?