ITU-T Status Report on Disaster Relief and Early warning - PowerPoint PPT Presentation

About This Presentation
Title:

ITU-T Status Report on Disaster Relief and Early warning

Description:

ITU-T SOURCE: ITU-T Status Report on Disaster Relief and Early Warning TITLE: Joint GTSC/GRSC, agenda item 4.2 AGENDA ITEM: Pierre-Andr Probst (probst-pa_at_bluewin.ch) – PowerPoint PPT presentation

Number of Views:113
Avg rating:3.0/5.0
Slides: 9
Provided by: StephanieM151
Learn more at: https://docbox.etsi.org
Category:

less

Transcript and Presenter's Notes

Title: ITU-T Status Report on Disaster Relief and Early warning


1
ITU-T Status Report on Disaster Relief and Early
warning
SOURCE ITU-T
TITLE ITU-T Status Report on Disaster Relief and Early Warning
AGENDA ITEM Joint GTSC/GRSC, agenda item 4.2
CONTACT Pierre-André Probst (probst-pa_at_bluewin.ch)
GSC11(06)_Joint_49
  • P.A.Probst/Chairman of ITU-T SG16

2
ITU-T Status Report on Disaster Relief and Early
warning
  • Scope of ITU-T activities
  • Development of Recommendations for interoperable
    systems and telecommunications facilities in
    Early Warning and Disaster Relief
    situations(Study Groups)
  • Coordination and collaboration among the key
    players involved in those situations(PCP-TDR)

3
ITU-T Status Report on Disaster Relief and Early
warning
  • Main Study Groups involved 1/2
  • SG 2 (International Emergency Preferential Scheme
    / IEPS, special numbering for TDR scenarios, )
  • SG 4 (Network management framework for ETS,)
  • SG 9 (Preferential telecommunications over
    IPCablecom networks,)
  • SG 11 (BICC and ISUP Support for IEPS,)

4
ITU-T Status Report on Disaster Relief and Early
warning
  • Main Study Groups involved 2/2
  • SG 13 (Framework on network requirements and
    capabilities to support emergency
    telecommunications, incl. NGN,)
  • SG15 (Automatically Switched Optical Network,)
  • SG16 (Priority mechanisms and message broadcast
    over multimedia systems,)
  • SG17 (Security aspects,)
  • SG19 (Emergency services in IMT-2000,)

5
ITU-T Status Report on Disaster Relief and Early
warning
  • Coordination 1/2
  • TSAG
  • ITU-T Action Plan for Standardization on TDR/EW
  • SG2
  • ITU-T Lead Study Group for Telecommunication for
    TDR/EW
  • Partnership Coordination Panel on TDR
  • Monitor the progress of technical standardization
    work in general and in particular a mapping to
    the requirements of the different categories of
    users
  • Address coordination issues between the partners
  • Involve institutional users in the
    standardization process

6
ITU-T Status Report on Disaster Relief and Early
warning
  • Coordination 2/2
  • Partnership Coordination Panel on TDR
  • Develop and maintain contact with entities not
    traditionally involved in standards development
  • PCP-TDR present Members- ITU-T SG2, SG4, SG16
    and other SGs on request,- ITU-R SG8 and others
    on request,- ITU-D SG2,- SDOs ISO/IEC, APT,
    ATIS T1, ETSI, IETF, OASIS, TIA and
    others,- Intergovernmental Organizations
    UN-OCHA, UNHCR, UNICEF, WFP, WHO
    and others,- NGOs IFRC, ICRC, TSF, IARU and
    others,- Industry Forum and Consortium MESA,
    TETRA and others.

7
ITU-T Status Report on Disaster Relief and Early
warning
  • New developments and trends
  • Increased importance of systems to support early
    warning needs
  • collection and transmission of relevant
    information (Citizen to Authority Authority to
    Authority)
  • Information broadcast (Authority to Citizen)
  • Evolution of telecommunication systems (mobile,
    internet,)
  • Importance of considering accessibility issues (
    e.g. users with disabilities, language barriers,
    )

8
ITU-T Status Report on Disaster Relief and Early
warning
  • Proposed actions
  • Encourage different PSOs to develop EW/TDR
    standards for the systems under their
    responsibility
  • In ITU-T encourage and stimulate contributions
    to the different ITU-T SGs
  • Improve cooperation and coordination among the
    PSOs, in particular through participation to the
    PCP-TDR
  • Contribute to the 2nd Workshop on EW/TDR(19-20
    October 2006())
  • () Date to be confirmed!
Write a Comment
User Comments (0)
About PowerShow.com