Title: Production Efficiency


1
Production Efficiency
2
Production Efficiency
  • Agenda
  • Introduction
  • Importance of Production Efficiency
  • Efficiency Measurement
  • Efficiency Improvement
  • Tool Box

3
Production Efficiency
  • Ragbir Chana
  • Facilities Engineer
  • Central North Sea Field Team
  • Bill Nicholson
  • Facilities Engineer
  • Northern North Sea Field Team

4
(No Transcript)
5
Production Efficiency
  • What is DTIs interest?
  • Fields already in production hold a huge amount
    of probable and possible hydrocarbons the DTIs
    objective is to ensure that all this economic oil
    gas is produced. It is working closely with
    industry and in PILOT to achieve this goal. The
    Brownfields showcase is an excellent opportunity
    to identify investment opportunities and to
    disseminate best commercial and technical
    practice.
  • Simon Toole DTI
  • Director Of Licencing and Consent Unit

6
Importance of Production Efficiency
  • Maximise potential from Brown Fields
  • Huge potential remaining.
  • Mature Infrastructure.
  • Security of Supply, in particular Gas.
  • Environment and Safety consideration.
  • PILOT Target

7
PILOT Target
8
Importance of Production Efficiency
  • Maximise potential from Brown Fields
  • PILOT Target
  • Size of the Prize

9
Size of the Prize
10
Size of the Prize
11
Size of the Prize
12
Size of the Prize
13
Importance of Production Efficiency
  • Maximise potential from Brown Fields
  • PILOT Target
  • Size of the Prize
  • Benefits

14
Benefits
  • Short Term
  • Maximise Asset Value for all
  • Security of Supply (Gas)
  • Medium Term
  • Maintain Facilities for incremental developments
  • Keep UK as an attractive investment area
  • Longer Term
  • Decelerate COP Life of Field Extension
  • Extend indigenous Oil Gas production
  • Window of Opportunity, develop all potential
    satellite fields

15
The Window of Opportunity
Source Shell UK
16
Efficiency Measurement
  • Why
  • Inconsistent, and many definitions
  • Develop consistent measurement system
  • Who
  • We are all involved, Operators DTI
  • How
  • Establish consistent sensible definitions
  • Industry participation
  • When
  • Consultation Process completed in Q1 2003

17
Efficiency Improvement
  • Establish Base line
  • Formulate Plan of Action
  • Immediate Term

18
Tool Box
  • Awareness
  • Evaluation
  • Process Simulation
  • Operational/Maintenance Culture
  • Intervention
  • Immediate Head Line Items

19
Tool Box
  • Intervention
  • Compression
  • Corrosion
  • High Water Cut
  • Liquid Hold Up
  • Slugging
  • Sand Control
  • Set Points, Valves Controls
  • Weir Heights
  • Power Generation
  • Water Injection

20
Production Efficiency
  • Ragbir Chana
  • Senior Facilities Engineer
  • DTI, Oil Gas Directorate
  • Atholl House
  • 86-88 Guild Street
  • Aberdeen AB11 6AR
  • Tel 01224 254074
  • Email Ragbir.Chana_at_dti.gsi.gov.uk

21
Production Efficiency
Write a Comment
User Comments (0)
About PowerShow.com