An Overview of Arizona s Renewable Transmission Planning Process Southwest Renewable Energy Transmission Conference Amanda Ormond Ormond Group LLC – PowerPoint PPT presentation

Number of Views:62
Avg rating:3.0/5.0
Slides: 18
Provided by: GregoryB9
Category:

less

Transcript and Presenter's Notes

Title: An Overview of Arizona


1
An Overview of Arizonas Renewable Transmission
Planning Process
  • Southwest Renewable Energy Transmission
    Conference
  • Amanda Ormond Ormond Group LLC
  • Brian Cole Arizona Public Service
  • May 21, 2010

2
Arizonas Renewable Portfolio Standard
  • 15 of retail electric load must be served by
    renewable resources by 2025
  • Of this percentage, 30 (i.e. 4.5 of total
    retail sales in 2025) must come from distributed
    renewable (DE) resources by 2012 and thereafter
  • One-half of the distributed renewable energy
    requirement must come from residential
    applications and the remaining one-half from
    nonresidential, non-utility applications

3
Regulatory Background Stakeholder Forums
  • Biennial Transmission Assessment (BTA)
  • Orders issued by the Arizona Corporation
    Commission (ACC)
  • Conducted every two years to assess the existing
    and future transmission system in Arizona
  • 4th and 5th BTAs (2006 and 2008) emphasized
    renewable resource and associated transmission
    development

4
Regulatory Background Stakeholder Forums
  • Southwest Area Transmission (SWAT) Study Group
  • Comprised of utilities and stakeholders from AZ,
    NM, NV, and portions of southern CA
  • Conducts collaborative planning for the regional
    electrical transmission system
  • Forms committees to focus on specific topics or
    studies

5
Regulatory Background Stakeholder Forums
  • SWAT Renewable Transmission Task Force (RTTF)
  • Committee formed within SWAT as a result of the
    4th BTA
  • Tasked with identifying renewable resource
    potential and existing future transmission
  • Will conduct technical modeling of proposed
    renewable transmission in the SWAT footprint

6
Arizona Statewide Planning
Southwest Area Transmission Group (SWAT)
  • In December of 2008, the ACC approved the Fifth
    BTA (Decision No. 70635). The Order directed
    Commission-regulated utilities to take the
    results of the Arizona Renewable Transmission
    Task Force and..identify the top three potential
    renewable transmission projects in its service
    territories and propose funding mechanisms to
    construct the top three renewable transmission
    projects.

Renewable Transmission Task Force (RTTF)
AZ Renewable Resource and Transmission
Identification Subgroup (ARRTIS)
Utility Transmission Plans
7
ARRTIS Background
  • Established by SWAT RTTF in January 2009
  • An open stakeholder process tasked with
  • Identifying potential areas for Arizona renewable
    resource development
  • Assisting the RTTF group by providing information
    to assess transmission options
  • Informing and assisting the utilities in their
    response to the 5th BTA Order

8
ARRTIS Process
  • Assemble group of key stakeholders
  • Gather AZ renewable resource potential
  • Identify constraint criteria
  • Identify likely developable areas for renewables
  • Provide information to RTTF, and ultimately
    utilities, for identification of transmission
    options

9
ARRTIS Final Sensitivity Map
10
RTTF Finance Subcommittee
  • Created by the RTTF in January 2009
  • Primary Objectives
  • Provide the RTTF with recommendations for
    financing methodologies for renewable
    transmission projects (RTP) in Arizona
  • Determine what constitutes a RTP
  • Provide information recommendations to support
    utilities responsible for filing responses to the
    5th BTA Order

11
Finance Subcommittee Final Report
  • Report specifies types of RTP development costs
    that should be eligible for rate recovery by
    utilities
  • Proposes development of utility-specific
    Renewable Transmission Action Plan (RTAP)
  • Utility will describe how each RTP is expected to
    advance renewable resource development in Arizona
  • Utility may request special cost recovery for the
    Commissions consideration, which the Commission
    may order

12
Finance Subcommittee Final Report
  • RTPs include
  • new transmission line(s),
  • upgrade(s) of existing line(s), or
  • the development of transmission project(s)
    previously identified by the utility which
    provide either
  • access to renewable energy resource areas
  • enables renewable resources to be delivered to
    load centers
  • Did not define the amount of renewable generation
    that needs to be on the line

13
Finance Subcommittee Final Report
  • Recommendations to the Commission
  • Adopt the RTAP procedure as part of the Ten Year
    Plan filing requirement and the BTA process
  • Coordinate RTP cost recovery with related
    determinations made by FERC
  • RTP designation and special cost recovery should
    be determined by the Commission on a case-by-case
    basis

14
RTTF Final Transmission Options Map
15
Utility Evaluation Process Overview
16
Utility Evaluation Process
  • Process Consisted of
  • Economic Evaluation
  • Qualitative Evaluation

17
Arizona Utilities' BTA Projects