Compressed Air Systems Optimized - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

Compressed Air Systems Optimized

Description:

... analysis of Demand Requirements Allocated Cost model Closely Meeting Demand with flexible supply units Example of screw compressor system optimization ISO ... – PowerPoint PPT presentation

Number of Views:316
Avg rating:3.0/5.0
Slides: 18
Provided by: JimMc46
Category:

less

Transcript and Presenter's Notes

Title: Compressed Air Systems Optimized


1
Compressed Air Systems Optimized
  • What you really need and how to get it at the
    total lowest cost.
  • Go to www.JimMcAuley.com

2
US DOE Compressed Air Challenge
3
Where the air is used
4
Key Benchmark
  • What you get out for what you put in
  • Standard cubic feet per minute per Kilowatt
  • 5 Scfm/Kw at 100 psiG is good performance
  • Dynamic Efficiency

5
Flow meter installation
  • Details

6
Bin analysis of Demand Requirements
7
Allocated Cost model
  • Dollars per hour per 100 Scfm
  • Total annual cost divided by hours of operation
    divided by average flow rate in hundreds of Scfm
  • 1.00 to 2.00 is typical cost for a big system

8
Closely Meeting Demand with flexible supply units
  • A

9
Example of screw compressor systemoptimization
  • BLT

10
ISO 8573-1Air Quality Classifications
  • A

11
Drainage BP
  • Use zero loss drain technology at after coolers,
    dryers, and filters.
  • Institute daily operational checks.
  • Keep cleaned and ready spares for immediate
    deployment.

12
Distribution piping Standards
  • A

13
Dedicated storage with metered recovery
  • A

14
Critical uses
  • Requirements over 85 psiG
  • Actual final element article pressure required
  • Requirements for desiccated air
  • Online standby power for intermittent loads

15
Inappropriate uses
  • Dewatering
  • Drying
  • Vacuum generation
  • Parts manipulation
  • Blowers or regulation to lower pressure,
    engineered nozzles, interlocking solenoids

16
Leak Management
  • A

17
Your action Plan
  • Go to www.JimMcAuley.com and execute the Plant
    Managers self evaluation checklist.
  • Continuously measure your flow and power in real
    time.
  • Consider a professional evaluation by a US DOE
    qualified specialist. Go to www.compressedairchall
    enge.org
Write a Comment
User Comments (0)
About PowerShow.com