BaBar-Grid Status and Prospects - PowerPoint PPT Presentation

About This Presentation
Title:

BaBar-Grid Status and Prospects

Description:

BaBar-Grid Status and Prospects Eleonora Luppi Padova 16 ottobre 2003 Distributed Computing Currently BaBar has a largely distributed computing system 5 Tier-A sites ... – PowerPoint PPT presentation

Number of Views:74
Avg rating:3.0/5.0
Slides: 12
Provided by: feInfnIt5
Category:

less

Transcript and Presenter's Notes

Title: BaBar-Grid Status and Prospects


1
BaBar-Grid Status and Prospects
  • Eleonora Luppi
  • Padova 16 ottobre 2003

2
Distributed Computing
  • Currently BaBar has a largely distributed
    computing system
  • 5 Tier-A sites
  • Sites that provide large resources for BaBar
  • Resources agreed to via MoUs
  • gt20 Tier-C sites
  • University sites
  • Produce majority of BaBar Monte Carlo

3
Motivation
  • Three large analysis sites
  • Would like to be more flexible too and use other
    sites
  • Need way for users to automatically submit jobs
    that run where the data and cpu is available
  • Also intend that GridKa is only available via
    grid technology
  • Could reduce the manpower used to run Simulation
    Production
  • Each of 25 sites has 0.5FTE to keep system
    running
  • Go to great lengths to make sure everything is
    identical
  • Data distribution to smaller sites could be
    integrated

4
CE Computing Element
SE Storage Element
RB Resource Broker
WN Worker Node
RC Replica Catalogue
VO Virtual Organisation
5
Present Infrastructure
  • SLAC
  • will install LCG-1
  • SLAC/SCS actively involved in security for Grid
    (PPDG and LCG)
  • Karlsruhe
  • LCG-1 User Interface installed and LCG-1 deployed
  • France
  • Still nothing released for users
  • INFN
  • LCG-1 installed in Ferrara (Grid.it)
  • Genius interface developed under EDG 1.4.x is
    migrating to new release
  • UK
  • EDG 2.x installed.
  • RB at Imperial College installed
  • Imperial College will have a LCG-1 RB soon

6
(No Transcript)
7
BaBarGrid Analysis
  • Successful test using EDG v 1.4.x
  • Prepare executable locally
  • Copy executable to SE and register to RC
  • Prepare JDL to select CE with a close SE where
    the executable is available
  • Copy executable to WN
  • Run and produce ntuple
  • Copy ntuple to close SE and register to RC
  • The aim is to reproduce this procedure using
    LCG-1

8
(No Transcript)
9
Simulation Production (SP)
  • Monte Carlo runs at 25 sites
  • Includes all Tier-As
  • Generate three times the hadronic rate
  • MC Data is largest part of computing resources
  • Generation, analysis, disk/tape, ...
  • Managed centrally
  • Allocations, modes, luminosity weighting

10
BaBarGrid MC Production
  • MC production system already tested on EDG v
    1.4.x ported to LCG-1
  • BaBar MonteCarlo Production rpm is already
    included in Grid.it distribution
  • First tests started ( in Ferrara, Padova,
    Legnaro, Milano, Trieste, Napoli, Bologna, Bari
    and Catania).
  • Genius is migrating to the new release with a
    basic set of services for MC

11
Future Plans
  • 11/2003 Genius running under LCG-1 with a more
    complete set of services for MC production
  • 12/2003 MonteCarlo Simulation Grid in
    production in a few sites
  • Objectivity federations accessible in different
    sites
  • 01/2004 A full scale analysis running on Grid
    and producing physics results (10000 8 hour CPU
    jobs producing 500 GB of output)
  • New security method being deployed at SLAC in
    next few months (Virtual Smart Cards)
  • 02/2004 LCG-1 deployed at SLAC
  • BaBar RB installed at Ferrara
  • 02/2004 MC in production in a larger number of
    site
  • Analysis package tested and ready
  • Increasing in BaBarGrid resources
  • RC integrated with the BaBar book-keeping system
    (discussion in progress)
Write a Comment
User Comments (0)
About PowerShow.com