CEE 4606 - Capstone II Structural Engineering Lecture 4 - Load Paths and Construction Considerations Outline 1. Building systems 2. Load paths 3. – PowerPoint PPT presentation

Number of Views:120
Avg rating:3.0/5.0
Slides: 61
Provided by: Shaw156
Category:

less

Transcript and Presenter's Notes

Title: CEE 4606 - Capstone II Structural Engineering


1
CEE 4606 - Capstone IIStructural Engineering
  • Lecture 4 - Load Paths and
  • Construction Considerations

2
Outline
  • 1. Building systems
  • 2. Load paths
  • 3. IBC requirements for concrete and masonry
  • 4. Construction update
  • 5. Other projects

3
General Comments
  • Schedules were fine for submittal, but need to
    have far more detail to be useful within your
    groups.
  • Load paths were good, but need more detail on the
    specific structural elements.
  • 3. Answer these questions
  • How does the wind load get to the column?
  • How does the altar load get to the column?
  • Are there any beams in your structure?

4
Building Systems
5
Load Paths
  • Building Frame System
  • Gravity loads are carried entirely by slabs,
    beams, columns (frame action)
  • Lateral loads are carried entirely by the shear
    walls

6
Floor Slabs
7
Elevated Slab(s)
8
Wind
Wind Load on Front Face
9
Wind
Wind Load from the side
10
EQ
Drawing 06 - Section Through Living Room
11
IBC Requirements
  • How does having the Category (A F) of the
    structure affect the design of the concrete
    structural elements (beams, columns, and slab)
    for gravity load?
  • How does it effect the design of the masonry
    walls?

12
IBC Requirements
  • Remember that we have a building frame system
  • Gravity loads ? Beams, Columns, Slab
  • Lateral loads ? Masonry Shear Walls
  • Butthe two systems still must work together

13
References
  • Design of Low-Rise Concrete Buildings for
    Earthquake Forces, Portland Cement Association,
    2nd Edition, 1998.
  • Reinforced Concrete, A Fundamental Approach,
    Nawy, 5th Edition, Chapter 16
  • IBC, 2000, Chapter 19, Concrete
  • IBC, 2000, Chapter 21, Masonry

14
Recall the General Site Layout
Chapel Site
Woods / Hilltop
Garden
Open Field
Cornfields
Pumphouse
Path
Bldg. 2
Animals
Bldg. 1
Dirt Road
Gate
15
2000
16
2000
17
2001
18
2001
19
2002
20
January 2003
21
(No Transcript)
22
(No Transcript)
23
2003
24
(No Transcript)
25
(No Transcript)
26
(No Transcript)
27
Storage Area Over Split Level
28
(No Transcript)
29
(No Transcript)
30
(No Transcript)
31
(No Transcript)
32
(No Transcript)
33
2003
Sand or small aggregate?
34
(No Transcript)
35
2003
36
(No Transcript)
37
(No Transcript)
38
(No Transcript)
39
(No Transcript)
40
(No Transcript)
41
2003
42
(No Transcript)
43
(No Transcript)
44
Other Recent Projects
  • Long distance phone system
  • Drainage system in front of the boys dormitory
    (building 2)

45
Telecommunications Project
46
(No Transcript)
47
(No Transcript)
48
(No Transcript)
49
Drainage Project
50
(No Transcript)
51
(No Transcript)
52
(No Transcript)
53
(No Transcript)
54
(No Transcript)
55
Keep in mind that the quality of construction at
the site is not typical of the surrounding area.
56
Non-engineered Structures
57
Construction Goals
  • Construction of the 2nd Story Beams, Roof, and/or
    Chimney
  • You need to select your column locations (the
    photos can serve as a guide)
  • develop a detailed framing plan for the second
    floor and chapel roof, and
  • determine loads for the entire structure.

58
You should have already
  • selected
  • material properties for concrete and steel
  • and be well on your way to
  • determining the design wind speed and seismic
    category for the site.

59
Work Tasks
  • Progress Report 1 for Tuesday
  • Design Schedule (do not present)
  • Detailed Load Path
  • Design Wind Speed
  • Design Ground Acceleration
  • (dont forget the agendas)

60
Schedule for Progress Report 1
  • 1130 1140 Ameriduras Ingeniros
  • 1145 1155 Comma Engineers
  • 1200 1210 Los Amigos de Amigos de Jesus
  • 1215 1225 HyperStructo-CyberTronics
    Engineering and Associates
  • 1230 1240 En Fuego Engineering
  • Keep the setup and presentation portion lt 10
    minutes!
Write a Comment
User Comments (0)
About PowerShow.com