TRAINING OF GRAM SANJOYAK - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

TRAINING OF GRAM SANJOYAK

Description:

TRAINING OF GRAM SANJOYAK SUGGESTION for Policy Decision 1 The minimum qualification for a Gram-Sanjojak should be H.S.C. pass. If not available in a particular ... – PowerPoint PPT presentation

Number of Views:87
Avg rating:3.0/5.0
Slides: 13
Provided by: odishapan
Category:

less

Transcript and Presenter's Notes

Title: TRAINING OF GRAM SANJOYAK


1
  • TRAINING OF GRAM SANJOYAK

2
  • SUGGESTION for Policy Decision
  • 1 The minimum qualification for a
    Gram-Sanjojak should be H.S.C. pass. If not
    available in a particular village the GS should
    be chosen form the nearest village.
  • 2- Performance of GS to be reviewed in every 15
    days and best GS to be facilitated.
  • 3- The sketch of the above item no (6) may be
    included in the GS hand book.
  • 4 Piece rate for turfing slussy soil may be
    fixed.
  • 5 The amount may be specified out of piece
    rate of earth work for dressing and leveling.
  • 6 Conversion factor inch to feet to be
    included in the Hand Book of GS.
  • 7 More Training at GP level to be provided.

3
  • Training for GS at GP/PS level
  • 1 Weekly measurement in stead of daily
    measurement to be recorded by the GS.
  • 2 For Roads and Embankments Profile to be
    given to the workers with drawing.
  • 3 Preliminary measurement may be entered in
    the GP computer Excel sheet with the help of GRS
    for final entry in the MB.
  • 4- The sketch of the particular work may be
    collected before commencement

4
  • 5- Short forms
  • E/W Earth Work
  • PCC Plain cement concrete
  • RCC Reinforced Cement Concrete
  • C.B Bricks Clamp Burnt Bricks
  • K B Bricks Kiln Burnt Bricks
  • L.S masonry Laterite stone masonary
  • RR HG Randum Rubble Hard Granite
  • CM Cement Mortar
  • CP Cement Plaster
  • AS flooring Artificial stone flooring
  • DPC Damp Proof course
  • HG Hard Grinite
  • HGCB Hard Granite Crusher broken
  • HGHB Hard granite Hand broken

5
  • 6-Propertions
  • Cement Fine Aggrigate Coarse Aggrigates
    Sand
    Metal/Chips
  • PCC(148) 01 04 08
  • PCC(124) 01 02 04
  • RCC(11.53) 01 1.5 03
  • C.P (16) 01 06 --
  • C.P (14) 01 04 --
  • A.S Flooring 01 02 04

6
  • 07. Unit of measurements (L- Length)
    (B-Breadth)(H-Height)
  • Building Item Unit Details of measurement
  • Earth work Cum LXBXH
  • Sand filling Cum LXBXH
  • PCC(148) Cum LXBXH
  • RCC (11.53) Cum LXBXH
  • C.B Bricks(16) Cum LXBXH
  • K B Bricks (16) Cum LXBXH
  • L.S Masonry (16) Cum LXBXH
  • RR masonry (16) Cum LXBXH
  • CP (16) Cum LXBXH
  • CP (14) Cum LXBXH
  • AS flooring(124) Sqm LXB

7
  • DPC (124) Sqm LXB
  • Cement washing Sqm LXB
  • Cement Painting Sqm LXB
  • White washing Sqm LXB
  • Enamel Painting Sqm LXB
  • Steel(M.S Bar) Qntl
  • Door window Qntl
  • (MS)
  • Wooden door
  • Window Sqm LXB
  • Centering
  • Shuttering Sqm LXB

8
  • Road Work
  • Item Unit Details of measurement
  • Earth work Cum LXBXH
  • Sand filling Cum LXBXH
  • Moorum Collection Cum LXBXH
  • Metal Collection Cum LXBXH
  • Spreading Moorum Cum LXBXH
  • Spreading Metal Cum LXBXH
  • Blinding Road Surface Sqm LXB
  • Turffing Sqm LXB
  • Sectioning
  • Cambering Sqm LXB
  • PCC(148) Cum LXBXH
  • PCC (124) Cum LXBXH

9
  • Tank /Farm pond/WHS/Field Channel 
  • Earth work Cum LXBXH
  • Turffing Sqm LXB
  • Sectioning
  • Cambering Sqm LXB
  • Bush cutting Sqm LXB
  • Irrigation Well
  • Earth work Cum 22/28XDiaX DiaX1.5m
  • Staining of well Cum 22/28XDiaX DiaXH
  • Sample pit for earth work _at_ Rs.90.00/day
  • Ordinary soil 100X100X 07.562.5 Cft Rs.90.00
  • Hard soil 100X100X06 50.0 cft Rs.90.00
  • Stoney Earth 60X60X10 36.0 Cft
    Rs.90.00

10
  • Definition of Lead
  • Distance between excavated area (pit) to work
    site.
  • Initial lead up to 50.0m
  • One extra lead 50.0m to 75.0m
  • 2 extra lead 75.0m to 100.0m
  • 3extra lead 100.0m to 125.0m
  • 4 extra lead 125.0m to 150.0m
  • 5 extra lead 150.0m to 175.0m
  • Definition of Lift
  • Height between excavated area (pit) to
    Embankment.
  • Initial lift up to 1.50m
  • One extra lift 1. 50 m to 3.0m
  • 2 extra lift 3.0m to 4.5m
  • 3extra lift 4.5m to 6.0m
  • 4 extra lift 6.0m to7.5m

11
  • Convertion inch to feet
  • 1 0.083ft 6 0.5ft 110.917ft
  • 2 0.166ft 7 0.583ft 12 1.00 ft
  • 30.250ft 80.666ft
  • 40.333ft 90.75ft
  • 50.416ft 100.833ft
  • Muster roll
  • The Gram sanjoyaka must receive the unique
    numbered Muster Roll with proper Seal and
    signature of P.O from PEO/JE/GPTA before
    commencement of the work.
  • The Muster Roll should be ready in all respect
    and kept at the work site during execution for
    verification.

12
  • THANKS
Write a Comment
User Comments (0)
About PowerShow.com