Title: CSAM Factory Acceptance Tests


1
CSAM Factory Acceptance Tests
CERN Safety Alarm System Supervisory
Board Roberto Bartolome The CSAM project team
2
Objective
  • To validate that the CSAM system meets the
    general and specific user requirements,
    functional and safety requirements, and product
    requirements described in CERNs technical
    specification (IT-2694/ST).

3
FAT on the planning
4
The 2nd attempt
  • The FAT were scheduled for the 15th of July
  • The system was not ready, and the tests were
    re-scheduled to the 15th of September

As a result of this,
  • CERN helps the contractor to identify the key
    issues
  • Both project teams define a strategy to meet the
    new dates
  • CERN closely follows up the development during
    July and August
  • CERN engineers acquire a hands-on experience on
    the system

5
Tests design
  • FAT are divided in Sessions and Scenarios
  • Sessions are related to general functions
  • Scenarios are different cases of the same session
  • Each session is composed by at least one scenario

6
Test design. Examples
  • I.e. the list of Sessions
  • Preliminary tests
  • Human-machine interface
  • System configuration
  • Hardware alarm handling
  • Commands handling
  • Archiving
  • Redundancy
  • External interfaces
  • System monitoring
  • Performance
  • Safety
  • i.e. Scenarios for Redundancy
  • Loss and recovery of one of the two networks
  • Loss and recovery of the hardware transmission
    path
  • Loss and recovery of the software transmission
    path (servers)
  • Loss and recovery of the SCR TCR consoles

7
Test follow-up
  • 2 CERN engineers are on the contractors site
    during 4 days for the overall coordination and
    validation of the tests
  • Test design documents revised by the CERN team
  • Test method known by the contractor
  • Tests performed by the contractor

8
Conclusions
  • The tests are expected to be successful
  • CERN engineers have participated in the
    realisation of the system, the approval of the
    proposed solutions and the implementation
  • CSAM complies to the IT2694 specifications and
    we know what we buy
  • CERN is ready to the on-site installation