Title: Cofiroute A86


1
(No Transcript)
2
About Cofiroute
  • 33 year-old private motorway concessionaire
    company (financing, construction, operation)
  • 800 million (U.S.) per year revenue
  • 550 mile network in France
  • 120 miles under development
  • 2,000 employees
  • Worldwide experience
  • SR 91 Express Lanes in California
  • Toll Collect in Germany
  • Dartford Crossing and Severn Bridges in the UK
  • Chilean Collipulli motorway in Chile

3
The Need
  • No public funding to complete A86
  • Commute times increasing
  • Increasing traffic in area impacting other roads
  • Sensitive environmental and political area

4
Project Goals
  • Complete the missing link of the radial freeway
  • Improve suburb to suburb travel
  • Reduce surface travel
  • Contribute to the improvement of the quality of
    life of the neighborhood
  • No tax dollars used

5
The Project
  • Two tunnels
  • East 6.5 miles
  • Two-level
  • Three lanes each direction
  • Uni-directional
  • Light vehicles only
  • West 4 miles
  • Single level
  • One lane each direction
  • Light vehicles and trucks

6
East Tunnel
West Tunnel
7
Lower Level
8
Value Pricing For Throughputand Revenue
Production
  • Means of keeping the tunnels congestion-free
  • Supports financing of construction and operations

9
Focus On Safety
  • Traffic Management
  • Entrance control
  • One-way traffic
  • Trucks separated from passenger vehicles
  • Automatic Incident Detection
  • Variable message signs
  • FM radio override
  • Customer Assistance Patrol
  • Design and Environmental
  • Driver sensitive design (lighting, color)
  • Independent ventilation for each level
  • Emergency access/refuge bay every 200 meters

10
Focus On The Environment
  • Extensive landscaping
  • Architecture design and above-ground facility
    location blends into landscape
  • Minimized above-ground facilities while
    maintaining safety
  • Noise reduction

11
Financing and Risk Sharing
Cofiroute - Concessionaire/Operator SOCATOP -
Design/build contractor 1.5 billion (U.S.)
private investment Financed by Cofiroute 70 year
concession Financed only with tolls Risk sharing
Cofiroute Cofiroute Cofiroute Cofiroute Governm
ent
  • Revenue and traffic
  • Construction cost
  • Financial risk
  • Operation cost
  • Government action

12
Benefits
  • A new road gets built
  • No tax dollars are used
  • Time savings for customers
  • 15 reduction of surface traffic
  • Relative gain in accessibility
  • Creation of 800 jobs at construction stage
  • Aprox 100 additional jobs during operations

13
Development Timetable
  • Project first envisioned as surface project by
    state - 1972
  • President decides to study all alternatives -
    1975
  • Underground project proposed by Cofiroute - 1988
  • Concession granted to Cofiroute - 1989
  • Major construction begins - 1997
  • Concession challenged/construction stopped 1998
  • Government rebids project 1998/1999
  • Cofiroute re-awarded concession - 1999
  • Construction begins again - 2000
  • Anticipated opening of first 4 miles 2005

14
More Information
  • Visit the A86 West Exhibition
  • or our website www.a86ouest.com
  • Greg Hulsizer
  • Cofiroute Global Mobility
  • (714) 637-9192
  • ghulsizer_at_cofiroutegm.com
  • www.cofiroute.fr
  • www.cofiroutegm.com

15