TUKUMS - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

TUKUMS

Description:

TUKUMS MODEL pilot city Number of inhabitants: 20 000; Located 65km from capital Riga; The area of municipality is 12,9 km Reconstruction of biological waste water ... – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 11
Provided by: ilzes5
Category:
Tags: tukums | covenant

less

Transcript and Presenter's Notes

Title: TUKUMS


1
  • TUKUMS
  • MODEL pilot city

2
Tukums City
  • Number of inhabitants 20 000
  • Located 65km from capital Riga
  • The area of municipality is 12,9 km²

3
Energy efficiency improvement in city
  • Reconstruction of biological waste water
    treatment plant
  • Further development of the water supply sector in
    the municipality
  • Regional waste management project
  • Reconstruction of streetligtning in the
    municipality
  • Tukums municipality is one of the most active
    participant among Latvia municipalities in the
    international INTERREG cooperation projects
    related to spatial planning and environmental
    sector, here it can be noted such projects as
    Baltic Sea Planet, Baltic Pallete II, Baltic
    cities forum for sustainable development BUUF,
    Regional cooperation for waste management RECO,
    Baltic Biomass Network BBN. In total Tukums city
    has 8 friendship cities in 8 countries.

4
General information
  • DH company Tukuma Siltums Municipality has
    100 share in company
  • DH company covers approximately 80 of DH market
    in town
  • Main consumers are households (80) and public
    buildings
  • The main branches are wood processing, food,
    textile industry, machinery
  • One of the major producers of furnaces/boilers
    based on local biomass JSC Komforts is
    operating in Tukums city.

5
Bioenergy in Tukums Town
  • Reconstruction of the DH system was initiated in
    1999 and proceeds in seven stages
  • during the 1st and the 2nd stages the four-pipe
    heat supply system was eliminated
  • In the 3rd stage a new boiler-house unit was
    built, and two new biomass-fuelled boilers were
    installed
  • During the 4th and 5th stage a part of network
    was reconstructed
  • During the 6th and 7th stage was reconstruction
    of network.

6
Consumption of resources
  • Wood chips30 hog fuel with a moisture content
    of 40-55 - introduced instead of previous fuel
    heavy fuel oil (the residual fuel oil is
    preserved as reserve as well as for covering
    peaks)
  • Annual wood fuel consumption 65 000 loose m3
  • Wood fuel storehouse 3000 m3

7
Other energy efficiency measures
  • Signed European Covenant of Mayors March 18,
    2009
  • ERDF public project application in activity
    3.4.4.1. "Thermal stability improvement measures
    in apartment houses
  • Heat insulation of schools buildings
  • Arrangement of water meters in buildings
  • Etc.

8
MIED 2008
9
MIED 2009
10
  • Tukums Town Council
  • Pils Street 18,
  • Tukums, LV-3101
  • E-mail dome_at_tukums.lv
Write a Comment
User Comments (0)
About PowerShow.com