Title: FCAP Review Comments and Responses


1
FCAP Review Comments and Responses 05/13/08
  • Fermilab Contractor Assurance Program

Ed Vokoun EGG Sr. Logistics Manager at Fermilab
2
FCAP Review Comments and Responses 05/13/08
  • Agenda
  • Past and Next Steps
  • Comment Resolution Process
  • Comments and Responses

3
FCAP Review History and Path Forward
  • Rough draft document written and reviewed
    04/01/08
  • Edits made and draft distributed to AC 04/08/08
  • Comments due 04/15/08
  • Comments review and presentation to AC 04/21/08
  • Additional comments due by 05/27/08
  • Comments review and resolution response 06/03/08
  • Meet if necessary to resolve comments 06/10/08
  • Distribute final review document 06/17/08
  • Final review comments or sign-off due 07/08/08

4
FCAP Review Comments Review and Resolution
Process
  • Review comments
  • Determine response/action
  • Edit, no change or different change
  • Response with reason
  • Review proposed responses with Bob Grant And
    Bruce Chrisman
  • Respond to person providing comments
  • If resolution not accepted, meet with Bruce, Bob
    and commenter
  • If fundamental issue needing larger group buy-in,
    meet with AC
  • If impasse, Bob and Bruce decide

5
FCAP Review Comments 04/21/08
  • General comment
  • Assurance Representative (AR) role Vs system(s)
    requirements and QAR
  • Staffing for the role
  • Determining major processes
  • Response
  • AR role is a lot of what you do today.
  • QAR role description applies to a specific
    management system, Quality.
  • AR role applies across all systems in this order.
  • The FCAP only shows the common AR
    responsibilities necessary for all management
    systems.
  • Resource requirements will be defined in the
    implementation plans.
  • Decision on which processes get graded is
    determined by Graded Approach Procedure and a
    definition of major processes.

6
FCAP Review Comments 04/21/08
  • General comment
  • Include Finance and other business operations
    systems now?
  • Response
  • Finance/Business Operations is not required by
    order 226.1A.
  • Recommend the approach should be compliance first
    and then enhanced control.

7
FCAP Review Comments 04/21/08
  • General comment
  • Should we list our external reporting
    requirements in an appendix?
  • Response
  • Recommend this is not done.
  • Creating a separate list outside of the FCAP
    document would be a useful tool and should be
    done.

8
FCAP Changes 04/21/08
  • Comment Overview Introduction, paragraph 5,
    sentence 1
  • Delete word assurance in order to place
    emphasis on all contractor systems not just
    assurance system.
  • Comment Overview Introduction, paragraph 6,
    sentence 1
  • Add word system in order change emphasis from
    management to management system.
  • Comment Overview Purpose
  • Add word systems in order change emphasis from
    management to management system.
  • Response to above
  • Done

9
FCAP Changes 04/21/08
  • Comment Overview Attributes of an Effective
    Assurance Program
  • Add an introductory sentence to clarify or
    emphasize why section is included and/or intent.
  • Response
  • Done

10
FCAP Changes 04/21/08
  • Comment Overview Attributes of an Effective
    Assurance Program
  • Continual Improvement, last sentence Need to
    define significant.
  • Response
  • Done changed wording to include definition as
    part of sentence and replaced the word
    significant.

11
FCAP Changes 04/21/08
  • Comment Program Introduction, paragraph 1,
    sentence 1
  • Need to define highest quality.
  • Response
  • Done replaced the word highest and added the
    perspective in which to view quality, the
    customers.

12
FCAP Changes 04/21/08
  • Program Organizational Structure, Section 1.1,
    paragraph 5
  • Change Internal Audit reporting to show
    administrative and functional reporting
    structure.
  • Response
  • Done

13
FCAP Changes 04/21/08
  • Comment Program Organizational Structure,
    Section 1.3
  • Add Centers to title, Division/Section,
  • Response
  • Done
  • Check remainder of document for consistency. Done
  • Also, document will be reviewed by the Technical
    Editor.

14
FCAP Changes 04/21/08
  • Comment Program Personnel Responsible for
    Management and Assurance Systems, Section 1.5.3
  • Add Property Management.
  • Response
  • Done

15
FCAP Changes 04/21/08
  • Comment Planning, Section 5.3, paragraph 1
  • Change DOE High Energy Physics Advisory Panel to
    Directors Physics Advisory Committee.
  • Response
  • Done

16
FCAP Changes 04/21/08
  • Comment Planning, Section 5.3, paragraph 2
  • Place emphasis on DOE Business Plan being
    strategic and PEMP being tactical and note they
    are done at different points in time
  • Business Plans are typically done a year in
    advance.
  • Response
  • Done

17
FCAP Changes 04/21/08
  • Issue Reporting - Responsibilities, Section 6.2
  • Capitalize C in title, Chair of the AC.
  • Response
  • Done
  • Check for others in document. Done
  • Also, document will be reviewed by the Technical
    Editor.

18
FCAP Changes 04/21/08
  • Comment Reporting - Responsibilities, Section
    6.2
  • Potential issue Verify Facility Manager role
    versus reserved definition from DOE orders and
    Randys job title.
  • What is intended use in the FCAP? Clarify or
    determine if there is a need to change.
  • Response
  • Decision by Fermilab management was to leave
    document as is, because Randy reports to COO.

19
FCAP Review Changes 04/21/08
  • Comment Employee Concerns Process, Section
    8.3.2
  • Should we include internal Action Line, x4000?
  • Response
  • Decision by Fermilab management was to include
    X4000 and have phone message updated to indicate
    relationship to program.

20
FCAP Review Changes 04/21/08
  • Comment Issue Management - Responsibilities,
    Section 9.5
  • Opportunity to elaborate on DOE O 226.1A,
    Attachment 1, Appendix A, page A-5, points 7-10.
  • Response
  • No change done at this time.
  • To BE document for corrective action and
    preventative action procedure will be created per
    FIQMP.