Title: TSG-SA WG5 (Telecom Management) Status Report
1TSG-SA WG5(Telecom Management) Status Report
Technical Specification Group Services and System
Aspects SP-080690 Meeting 42, 8 - 11 December
2008, Athens, GREECE
Prepared and Reported by Christian
TOCHE Dionisio ZUMERLE TSG-SA WG5 Chair
TSG-SA WG5 Secretary
Agenda Item 7.5 Document for Information
23GPP SA5 Officers
- OAMP (Operations, Administration, Maintenance
Provisioning) And Charging Management - Christian TOCHE (Huawei) Chair since 08/2005
(2nd term) - Istvan ABA (T-Mobile) VC since 08/2007 (1st
term) - Thomas TOVINGER (Ericsson) VC since 08/2007
(1st term) - Charging SWG
- Patrik Teppo (Ericsson) Chair
- Mingjun Shan (Huawei) Vice Chair
- OAMP SWG
- Shuqiang HUANG (ZTE) Chair
- SON SWG
- Christian Toche (Huawei) Convenor
- Dionisio ZUMERLE (MCC) Secretary
3Inter-Organizational OAMP
- OAM Standards Harmonization
- Methodology convergence with ITU-T SG4 and other
SDOs - Requirements and Information Service templates
aligned in early Rel-8 (2007-09) - Remaining Rel-8 work focuses on Solution Set
guidelines and templates - Regular conference calls with ITU-T SG4 also
involving TISPAN WG8, TMF and ATIS TMOC - Process to keep common Methodology documents
aligned has been agreed - Cooperation on Subscription Management (SuM)
- Established bi-monthly conference calls with TMF
and TISPAN on convergence of the concepts and
modelling of subscriber, subscription, users and
related service data - Work plan was agreed, several contributions were
already discussed - Cooperation with TMF mTOP on the usage of XML
technologies - Monthly conference calls also involving ITU-T
SG4, TISPAN WG8 and ATIS TMOC - Work to be correlated with the new SA5 WID on
SOAP/XML Solution Sets - Cooperation with 3GPP2
- 3GPP2 OAMP is now in 3GPP2 TSG-S WG2
(Architecture and OAMP) - 3GPP2 is fully reusing SA5 Interface IRPs
- For NRM IRPs and Measurements, 3GPP2 is
referencing SA5 specifications and producing a
Delta Specification - Need was identified by 3GPP2 to separately
document in SA5 Common IMS and non-common IMS
performance measurements (similar request for
Trace), a WI would be needed to pursue - Need was identified by 3GPP2 to separately
document in SA5 Common IMS and non-common IMS
object models, a WI would be needed to pursue
4Inter-Organizational Charging
- ETSI TISPAN
- SA5 identifies there is no need to maintain
TISPAN ES 282.010 as this document only endorses
the 3GPP charging specifications and adds Tariff
Information operation. - The Tariff operation is considered in AoC WI, and
the requirement from TISPAN, i.e. RTTI was
reviewed in charging calls to confirm being used
for Advice of charge only, not for actually
charging for security constraints. - Open Mobile Alliance (OMA)
- 3GPP Charging architecture underlies OMA Charging
architecture - OMA Charging specs are reusing 3GPP diameter
vendor ID and AVP, new AVP codes allocated and
documented in SA5 TS. - Ongoing Collaborations with OMA Charging features
e.g. IM, DCD, CPM, MEM through AVP code
assigning. - Solutions as common as possible for AoC
requirement are seeking, Liaison exchange ongoing - ITU-T SG4, ITU-T SG13, ITU-T NGNMFG, ATIS TMOC
- initial work done on NGN Charging harmonization
focused on ITU-T SG13s requirements - Next step for harmonizing solutions between 3GPP
SA5 and ATIS TMOC would require additional
resources (currently in standby) - 3GPP2
- 3GPP2 endorses 3GPP Charging specifications for
Charging aspects related to common IMS Offline
Charging (no IMS Online Charging in 3GPP2). - No additional work identified so far with 3GPP2
(currently in standby)
5Meetings held
- 3GPPSA561
- 13-17 Oct Dalian, CN
- Hosted by ZTE
- Attended by 58 delegates
- 3GPPSA562
- 17-21 Nov Miami, US
- Hosted by NAF
- Attended by 53 delegates
6SA5 Statistics since last SA
- Agreed 3 new/updated WID
- Agreed 5 TS/TR for information
- Agreed 9 TS/TR for information
- Agreed 90 Change requests
- Received 30 Liaison statements
- Sent 10 Liaison statements
- Handled 859 documents
7SA5 Documents history
Data Source 3GPP website, WG meeting / document
directories
8Release 8
SAES (EPC), LTE (E-UTRAN)
SIDs UID_340036 Study on management of LTE and
SAE Progress 95 to 100. TR 32.816-100
(Submitted for approval SP-080710). WIDs UID_3900
01 E-UTRAN Data Definitions UID_370001 Subscriber
and Equipment Trace for E-UTRAN and EPC.
Progress 60 to 90. UID_380036 E-UTRAN Network
Resource Model IRP. Progress 30 to 60.
UID_390002 Performance measurements for
E-UTRAN. Progress 30 to 80. UID_390003 Key
Performance Indicators (KPIs) for E-UTRAN.
Progress 30 to 90. UID_390004 Management of
Self-Organizing Networks (SON) UID_390005 Self-Es
tablishment of eNBs. Progress 30 to 90.
UID_390006 SON Automatic Neighbour Relations
(ANR) List Management. Progress 30 to 80.
UID_390007 SON Self-Optimization Self-Healing
handling. Progress 10 to 40. UID_390010 EPC
Data Definitions UID_380037 EPC Network Resource
Model (NRM) IRP. Progress 20 to 80.
UID_390002 Performance measurements for EPC.
Progress 30 to 80. SP-080756 New
WorkItem Proposal on NE Software
Management SP-080757 New WID on Study of UE
Management
9OAMP Feasibility Studies (OAM8-Studies)
Release 8
- UID_340036 Study on management of LTE and SAE
- See previous slide
- UID_360007 Study of SON related OAM interfaces
for Home NodeB - Progress 45 to 70
- SP-080708 New WID on 3G HNB OAM - type 1
- SP-080794 New WID on R9 3G HNB GW OAMP
- UID_360006 Study of System Maintenance over Itf-N
- Progress 65 to 70.
- UID_390017 Study on Self-healing of
Self-Organizing Networks (SON) - Progress 15 to 40.
-
- UID_400029 Study on SOA for IRP
- Progress 10 to 15.
10Release 8
OAMP Rel-8 (UID_340063, OAM8)
- Operation, Administration, Maintenance and
Provisioning - Target completion remains Dec 2008
- Covers several independent items, as shown in the
Work Plan - UID_340064 BB Network Infrastructure Management
8 - UID_35051 Telecom Management Methodology 75 to
90 - UID_ 35053 Advanced Alarming on Itf-N
Completed - UID_ 35056 CN CS Bearer Transport Network
relative NRM Completed - UID_ 370002 End point modelling for reference
point Completed - UID_ 390016 Alignment with eTOM and M.3060 15
to 100 - UID_400030 SOAP Solution Sets 10 to 40
- UID_340065 BB Performance Management 8
-
- UID_ 390012 IP bearer network PM
definitions Completed - UID_ 360001 HSUPA performance measurements 80
to 100
11Release 8
Charging Management
- UID_370059 IMS Multimedia Telephony and
Supplementary Services (IMSTSS) - SA5 BB UID_380042 Advice of Charge (AoC) support
in IMS Charging- new TS 32.280, CR
32.240/260/296/298/299 35 to 55 - (SP-080709 TS 32.280 for information)
- BB UID_370062 IMS Multimedia Telephony Service
- SA5 WT UID_380041 MMTel and Supplementary
Services Charging (MMTel-CH) - new TS 32.275,
CR 32.298/299 40 to 75 - UID_350016 Charging Management small
Enhancements (CH8) - UID_380046 WLAN Offline Charging stopped
12Exceptions for Rel-8
- SP-080691 Exception sheet for TM methodology
- SP-080692 Exception sheet for MMTel offline
charging - SP-080693 Exception sheet for EPC charging
- SP-080694 Exception sheet for Advice of Charge
- SP-080695 Exception for WID on E-UTRAN NRM
- SP-080696 Exception sheet of 32.410 Key
Performance Indicators (KPI) for UMTS and GSM - SP-080697 Exception for SOAP SS
- SP-080698 Exception for Trace for UTRAN and EPC
- SP-080699 WI Exception sheet for E-UTRAN
performance measurements - SP-080700 Exception sheet for KPI for E-UTRAN
- SP-080701 WI_Exception for EPC measurements
- SP-080750 Exception sheet for EPC Network
Resource Model (NRM) Integration Reference Point
(IRP) - SP-080xxx Exception for 3G Home NodeB OAMP (type
1 definition)
13SA5 Meetings 2008
TITLE DATES LOCATION CTRY HOST
3GPPSA557 7 - 11 Jan 2008 Sophia Antipolis FR ETSI
3GPPSA558 18 - 22 Feb 2008 Malta MT EF3
3GPPSA559 21 - 25 Apr 2008 Chengdu CN Huawei
3GPPSA559bis (SON) 16 - 18 Jun 2008 Budapest HU NSN
3GPPSA560 7 - 11 Jul 2008 Sophia Antipolis FR ETSI
3GPPSA560bis (SON) 10 - 12 Sep 2008 Budapest HU NSN
3GPPSA560bis (CHARGING) 10 - 11 Sep 2008 Budapest HU NSN
3GPPSA561 13 - 17 Oct 2008 Dalian CN ZTE
3GPPSA562 17 - 21 Nov 2008 Miami US NAF
14SA5 Meetings 2009
TITLE DATES LOCATION CTRY HOST
Joint RAN3/SA5 12 - 13 Jan 2009 Sophia Antipolis FR ETSI
SA562bis (CH) 12 - 14 Jan 2009 Sophia Antipolis FR ETSI
SA562bis (OAM) 14 - 16 Jan 2009 Sophia Antipolis FR ETSI
SA563 16 - 20 Feb 2009 Prague CZ EF3
SA564 30 Mar - 03 Apr 2009 TBD CN Huawei
SA565 11 - 15 May 2009 Tallinn EE EF3
SA566 29 Jun - 03 Jul 2009 Dublin IE Openet
SA567 31 Aug 04 Sep 2009 North America TBD NAF
SA568 09 - 13 Nov 2009 TBD TBD TBD
15SA5 input to this SA meeting 1/2
NUMBER TITLE
SP-080690 SA5 Report
SP-080691 WI Exception sheet for TM methodology
SP-080692 Exception sheet for MMTel offline charging
SP-080693 Exception sheet for EPC charging
SP-080694 Exception sheet for Advice of Charge
SP-080695 Exception for WID on E-UTRAN NRM
SP-080696 Exception sheet of 32.410 Key Performance Indicators (KPI) for UMTS and GSM
SP-080697 Exception for SOAP SS
SP-080698 Exception for Trace for UTRAN and EPC
SP-080699 WI Exception sheet for E-UTRAN performance measurements
SP-080700 Exception sheet for KPI for E-UTRAN
SP-080701 WI_Exception for EPC measurements
SP-080702 Rel-6 CR on OAM-NIM
SP-080703 Rel-7/Rel-8 CRs on OAMP (OAM7, OAM7-NIM, OAM7-PM, OAM7-Trace)
SP-080704 Rel-8 CRs on EPC Charging (EPC-CH)
SP-080705 Rel-8 CRs on OAMP (OAM8)
SP-080706 Rel-8 CRs on Charging Management (CH8)
SP-080707 Rel-8 CRs on IMS Multimedia Telephony and Supplementary Services (IMSTSS)
SP-080708 New WID on 3G HNB OAM - type 1
SP-080709 TS 32.280 Telecommunication management Charging management Advice of Charge (AoC) service
SP-080710 TS 32.816 Telecommunication management Study on management of Evolved Universal Terrestrial Radio Access Network (E-UTRAN) and Evolved Packet Core (EPC)
16SA5 input to this SA meeting 2/2
SP-080711 TS 32.500, Version 0.5.1 Self-Organising Networks (SON) Concepts and requirements
SP-080712 TS 32.511 Telecommunication management Self-Organizing Networks (SON) Automatic Neighbour Relation (ANR) management Concepts and requirements
SP-080713 TS 32.501 Telecommunication management Self-Organizing Networks (SON) Self-establishment of eNodeBs Concepts and requirements
SP-080714 TS 32.502 Telecommunication management Self-Organizing Networks (SON) Self-establishment of eNodeBs Stage 2
SP-080715 TS 32.503 Telecommunication management Self-Configuration of Network Elements Integration Reference Point (IRP) CORBA Solution Set (SS)
SP-080716 TS 32.531 Telecommunication management Software management concepts and Integration Reference Point (IRP) requirements
SP-080717 TS 32.532 Telecommunication management Software management IRP Information Service (IS)
SP-080718 TS 32.533 Telecommunication management Software management Integration Reference Point (IRP) Common Object Request Broker Architecture (CORBA) Solution Set (SS)
SP-080719 TS 32.450 Telecommunication management Key Performance Indicators (KPI) for Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Definitions
SP-080720 TS 32.451 Telecommunication management Key Performance Indicators (KPI) for Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Requirements
SP-080750 Exception sheet for EPC Network Resource Model (NRM) Integration Reference Point (IRP)
SP-080751 TS 32.751 Telecommunication management Evolved Packet Core (EPC) Network Resource Model (NRM) Integration Reference Point (IRP) Requirements
SP-080752 TS 32.752 Telecommunication management Evolved Packet Core (EPC) Network Resource Model (NRM) Integration Reference Point (IRP) Information Service (IS)
SP-080756 New WorkItem Proposal on NE Software Management
SP-080757 New WID on Study of UE Management
SP-080793 TS 32.410 Telecommunication management Key Performance Indicators (KPI) for UMTS and GSM (Release 8)
SP-080794 WID on R9 3G HNB GW OAMP
SP-080836 Exception for 3G Home NodeB OAMP (type 1 definition)
SP-080837 TS 32.761 Telecommunication management Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP) Requirements for SA approval
SP-080838 TS 32.762 Telecommunication management Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP) Information Service (IS) for SA information
SP-080839 TS 32.426 Telecommunication management Performance Management (PM) Performance measurements Evolved Packet Core (EPC) network for information
17Thank you for your attention