Title: Defense Transportation
1U.S. Transportation Command
Defense Transportation Coordination Initiative
(DTCI) Overview Briefing LTC Leslie
Sullivan Dec 06
2Mission
Partner with a world-class transportation
services provider (3PL) to manage CONUS
distribution of material for selected Service and
Defense Logistics Agency (DLA) shipping
locations. Leverage the winning coordinators
existing commercial business with his best
commercial practices and our large volume of DOD
freight to achieve efficiencies in distribution
and associated cost savings.
3Why are we doing this?
- Over 600 CONUS shipping locations
- More receiving locations
- No enterprise-wide vision, collaboration or
direction - 3PLs are particularly effective in the
commercial world - So why not DoD?
- Our SE region pilot program gave OSD
confidence to press ahead - We can garner efficiencies as well as cost
savings.
- Improve operational effectiveness
- Support strong small business participation
- Improve customer confidence
- Reduce cycle times (defined as time from request
for movement to delivery) - Increase efficiencies
- Develop a partnership to integrate commercial
best practices - Enable process improvements
- Achieve cost savings
- Integrate seamlessly with the DoD Strategic
Distribution System - Protect operational capability like a DoD
critical infrastructure asset
DTCI Goals
4Guidance and Oversight
- Office of the Secretary of Defense (OSD)
- Transportation Policy is strong lead
- Acquisition, General Counsel, Comptroller,
- others provide support
- Distribution governance
- Steering Group
- Senior Task Force
- Executive Board
- Combatant Commanders Council
- Other groups as required
- USTRANSCOM
- DTCI Project Manager reports directly to
Commander - Acquisition provides acquisition policy and
contracting support - Services, Defense Logistics Agency, and
Supporting Agencies
5Industry Players
- Dozens of participants in pre-proposal
discussions - Trade Associations
- American Trucking Association (ATA)
- National Defense Transportation Association
(NDTA) - Transportation Intermediaries Association (TIA)
- Several others.
6DTCI Site Activation
Phase I
7Functional Concept (PWS requirements)
- DTCI coordinator will
- Arrange, coordinate, monitor, and control freight
shipments from notification to delivery - Manage and optimize enterprise operations while
providing exception reporting - Process timely payments to subcontractors and
carriers for services provided - Accept, process and facilitate claims resulting
from loss or damage - Manage carrier quality and performance
- Assist in the ID and delivery of astray freight
- Provide In-Transit Visibility (ITV) to government
systems and real-time access to shipment info - Perform shipment optimization, consolidation and
routing services - Provide management info and accounting reports
- Collaboratively develop, recommend and implement
process improvements
8Exclusions
- OCONUS freight movements (Theater controlled)
- Vendor shipments
- OCONUS unit moves
- Universal service ocean carrier contracts
- Household goods to include DPM moves
- DOD organic equipment moves
- On-site local drayage contracts
- Bulk and Missile fuels
- Small package contracts
- Privately owned vehicles
- Sensitive and/or classified shipments
- Arms, ammunition and explosives
- Cash/Collect on delivery shipments
9Performance Thresholds
- On-time pickup 98
- On-time delivery 98
- Loss and damage-free shipments 98
- Process loss and damage claims in a timely manner
99 within 120 days - IT systems available for use 99
- Small business subcontracting 20 first year
10How will we measure performance?
- Quality Assurance Surveillance Plan (QASP)
- Performance Objectives and Thresholds
- Surveillance responsibilities of the government
- Procedures for evaluating performance and
resolving issues - Program Management Review (PMR)
- Comparison of contractors monthly report against
Transportation Officer (TO) shipper system/hard
copy data - QA Representative on site forwards to DTCI PMO
quarterly - If sub-standard performance, a of management
services will be reduced - Random Inspections
- Web-based Process Change Request System /
Customer Feedback
11Exclusions
12Market Research Results
- Adequate competition exists
- Bundling supported by Business Case Analysis --
- savings in excess of 15
- Hybrid contract-type necessary
- Transportation based on cost-reimbursement
provisions - Management services based on fixed-price
provisions - Long-term relationship preferred
- Include provisions for price adjustments due to
surge - So the Acquisition Strategy and RFP were
constructed with these results in mind
13Source Selection Approach
- Source selection approach
- Best value basis of award
- All offers evaluated against evaluation criteria
- Competitive range (down select) for purposes of
efficiency - Full debriefings to offerors throughout source
selection process - Source Selection Advisory Council (SESs, Cols,
GS-15s) - Several pre-solicitation meetings
- Several meetings during the source selection
- SSA will make the award decision
- Source Selection Evaluation Team
- 17 full-time USTRANSCOM personnel (15 from DTCI
PMO) - 7 full-time Service/Agency personnel here TDY
- Many other SMEs on-board for help as required
14Transition Planning Team
- Full-time PMO and DDC membership Services
- provide additional support full-time change
- management expert on board -- Army O-5 lead
- Completed milestones (since 15 May)
- Developed Change Management and Communications
Plans - Developed Plan of Action and Milestones (POAM)
- Tri-fold, posters, voice-over Powerpoint brief,
video in works. - As-is and To-be process flows for shippers
- Way-ahead
- Taking the show on the road
- Perform ROC (Rehearsal of Concept) Drills
- Deliver the message to our stakeholders
- Integrate with DTCI Coordinator after contract
award - Develop training plans
- Capture lessons learned from each site
implementation - Ensure feedback loops are in place
15Why Change Management ?
- SE prototype findings
- There was no real plan with a transition team
that included DoD and contractor personnel.
there was inadequate identification of
transition problems or issues. - Lack of trust by DoD personnel was an important
issue that could not be overcome to ensure an
adequate test. - The DoD transportation system has not
adequately incorporated new processes, systems
and technologies over the past 30 years.
Team Composition Primary LTC Stan Smith
(PMO) Thom Bettinger (DDC) Mary Jo Kruse
(LMI) Subject Matter Experts DDC Ops Service
Reps Transition Team Contracting
- Finalize DTCI CM Plan
- Tailor CM Plan to DDC
- Review existing DTCI communications products
(video, briefings, elevator speech, web sites,
etc.) for applicability for DDC - Determine appropriate vehicles/resources for
executing comm plan - Lay out specific messages and activities
- Prepare to revisit all with winning DTCI
coordinator - Execute site visits, ROC drills, etc.
16IT Strategy
- Coordinator will conform with defined DoD IT
architecture - Coordinator to demonstrate ability to interface
with DoD systems before execution starts - Provides IT tools required to execute task
- Provides interface with Trans Ops government
financial systems - Coordinator will provide real time web access
- Electronic Data Interchange for data transfers
- Protect DoD data as sensitive, unclassified
information - Share performance data and measures
electronically with all stakeholders - Identify/recommend changes ensure compatibility
17Mission (Why were doing this.)
Bottom Line with conservative assumptions,
analysis indicates DoD can save nearly 60M a
year
Estimated annual DoD CONUS freight
transportation spend
Annual realistic projected savings on Phase
I-III 58M
Potential savings
Total analyzed CONUS freight
100 sites Analyzed in the BCA
77M
260M
560M
Approx. 900M
SOURCE APRIL 2006 BCA UNINFLATED
18DTCI PMO Division Chiefs
(618) 622-2212
Program Manager Col Jim Lovell Administration
Ms. Chris Bennett Contracting Ms. Cathy
Simpson Financial Ms. Carol
Manfucci Functional Ms. Pat
Kuntz Information Technology MAJ Kathy
Zirolli Integration LTC Leslie
Sullivan Transition Planning LTC Stan Smith
As of 1 Sep 06