Boiler Operation Procedures - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

Boiler Operation Procedures

Description:

Chapter 8 Boiler Operation Procedures Taking Over a Shift First-Time Boiler Start-up Procedures Routine Boiler Start-up Procedures Boiler Maintenance ... – PowerPoint PPT presentation

Number of Views:4568
Avg rating:3.0/5.0
Slides: 22
Provided by: go2atpCo6
Category:

less

Transcript and Presenter's Notes

Title: Boiler Operation Procedures


1
Chapter 8
  • Boiler Operation Procedures

Taking Over a Shift First-Time Boiler Start-up
Procedures Routine Boiler Start-up Procedures
Boiler Maintenance Procedures Boiler Shutdown
Procedures Boiler Inspection Hydrostatic Test
Boiler Troubleshooting
2
  • Boiler operation information is communicated to
    the boiler operator starting the shift to specify
    any special procedures required.

3
  • When blowing down the gauge glass, water should
    enter the gauge glass quickly when the gauge
    glass blowdown valve is closed.

4
  • During a bottom blowdown, the boiler should be
    under light load and the water level should be at
    the NOWL.

5
  • The blowdown valve is opened to evacuate the low
    water fuel cutoff chamber with the burner firing
    during blowdown.

6
  • When testing the flame scanner, the flame scanner
    sensor is covered to simulate a flame failure.

7
  • Before starting the boiler for the first time,
    the boiler should have a minimum water level of
    approximately 2? above the bottom of the gauge
    glass.

8
  • The burner is started in low fire according to
    procedures specified by the manufacturer.

9
  • The boiler vent is closed when pressure in the
    boiler reaches 10 psi to 15 psi.

10
  • The main steam stop valve is opened slowly to
    allow the pressure to equalize when the boiler is
    a few pounds below the header pressure.

11
  • A broken or discolored gauge glass is replaced
    using standard procedures for maximum safety.

12
  • The low water fuel cutoff controls must be
    installed vertically for proper performance.

13
  • The burner is maintained and tested to ensure
    proper operation and maximum efficiency.

14
  • Feedwater pumps should be checked periodically to
    ensure proper bearing temperatures and checked
    for any unusual vibration.

15
  • Safety valves are routinely tested to ensure
    proper operation and must be serviced by an
    authorized manufacturer representative.

16
  • Steam traps are checked for proper operation when
    determining the cause of a steambound feedwater
    pump.

17
  • When inspecting a boiler, inspect tube sheets,
    tubes, and other internal parts for corrosion,
    overheating, and/or other damage.

18
  • Handhole covers are removed to provide access to
    boiler parts during a boiler inspection.

19
  • All internal surfaces are exposed and cleaned
    prior to the boiler inspection.

20
  • Troubleshooting steps from the manufacturer
    provide a guide to correcting a boiler operation
    problem.

21
  • The boiler room log lists boiler operation data
    that can be used to increase boiler efficiency
    and identify a potential malfunction.
Write a Comment
User Comments (0)
About PowerShow.com