A tool for Decentralized, Participatory & Integrated District Planning * * * The DPC can generate sectoral views of the Plan (to be reviewed by sectoral committees ... – PowerPoint PPT presentation

Number of Views:1648
Avg rating:3.0/5.0
Slides: 92
Provided by: RamaHar3
Category:

less

Transcript and Presenter's Notes

Title: PlanPlus (http://planningonline.gov.in)


1
PlanPlus(http//planningonline.gov.in)
  • A tool for Decentralized, Participatory
    Integrated District Planning

2
Planning As Is
3
Objective
  • Facilitates the Decentralized Planning process in
    Local Language by
  • Supporting Need Based Planning rather than
    Scheme-based planning
  • Facilitating convergence of funds from different
    central and state sponsored schemes to address
    the needs of the people
  • Facilitating integration of plans prepared by
    various planning units into a single district
    plan document
  • Helping in monitoring the execution of the plan
  • Generating various graphs for analysis and
    decision support
  • Helping in the preparation of Perspective Plans
    and deriving the annual draft and action plans
    from perspective plans

4
Stakeholders
  • Rural Local Bodies
  • Urban Local Bodies
  • District / State Level Line Departments
  • DPCs / Planning board
  • Citizens
  • State Government Departments
  • Central Government Departments

5
(No Transcript)
6
PlanPlus Sections
  • Requirement Section
  • Capturing Information on Wish List,
    Works(location, proposed cost, proposed duration,
    asset/beneficiary, output) and Projects
  • Resource Envelope Section
  • Information about Resource Envelope Available
    with Planning Unit (Perspective Allocation/
    Expected Allocation / Actual Allocation)
  • Planning Section
  • Creating Perspective, Annual Draft Plan and
    Annual Action Plan, Allocating available
  • resources to Prioritized works

7
PlanPlus Sections
  • Technical Appraisal Section
  • Scrutinize Plans submitted by Planning Units and
    offer comments on cost, duration and methodology
  • Administrative Approval Section
  • Scrutinize Plans for administrative approval
  • DPC Approval
  • Scrutinize Plans cleared by TAC and
    accord/endorse approval and integrate it with
    District Annual Plan DPC
  • Plan Execution Monitoring
  • Record Execution Details of Works Approved in the
    Action Plan Planning Unit
  • Report Section
  • Generate various reports that reflect Plan-Unit
    wise Plans, Scheme Plans, Physical Financial
    Progress etc.

8
Requirement SectionStakeholder Planning Unit
9
Suggestion Box
  • PlanPlus captures the needs identified through
    SWOT analysis/Gram Sabha/Ward Sabha or even by
    individual citizen.
  • These suggestions are forwarded to the planning
    units
  • The planning units can decide if there is a need
    to take up the suggested need as a work in any of
    the Plans

10
Suggestion from Citizen
11
Suggestion From a Planning Unit
12
Work Category
  • PlanPlus allows each State to define categories
    of works
  • Egs. Include Construction of CC Road, Laying of
    water pipeline etc.
  • Each work category is associated with a specific
    work focus area such as roads, drinking water
    etc.
  • Each work category is mapped to specific outputs

13
(No Transcript)
14
Mapping of Assets to Work Category
15
Works
  • Planning Process begins with the structuring of
    unstructured wish-list into structured works by
    each Planning Unit
  • Work Details include among other parameters the
    following
  • Work For - Whether the work is for specific
    section of the population such as SC, ST, Women
    etc.
  • Work Focus Area What is the focus area of the
    work? The list includes the 29 and 18 functions
    allocated to Panchayats and urban local bodies
    under the Constitution. This will help in
    generating the sectoral plan
  • Estimated Cost
  • Estimated Duration
  • Proposed Output Asset, Training, Staff
    Augmentation etc.

16
(No Transcript)
17
Asset Details
18
(No Transcript)
19
Capacity Building
20
Staff Augmentation
21
Project
  • A project is a logical collection of related
    works, possibly belonging to different sectors
  • A project may have two or more works
  • It is not mandatory for every work to be included
    in a project
  • Helps in bringing about sectoral integration and
    ensures maximum impact of the interventions in
    different sectors

22
(No Transcript)
23
Sources of FundingStakeholder Central
Govt./State Govt. / Local Govt.
24
Sources of Funding
  • Stakeholder
  • Central Government Departments (CSSs, ACAs etc.)
  • State Government Departments (state government
    schemes)

25
Sources of Funding
  • The software captures details about various
    Sources of Funding in the form of Centrally
    Sponsored Schemes/State Government Schemes
  • Details include inter-alia,
  • Scheme Active Period
  • Geographical Coverage
  • Target Group
  • Component Focus
  • Component Funding Pattern (State-wise and
    year-wise)
  • Permissible/Non Permissible Activities

26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
(No Transcript)
31
Resource EnvelopeStakeholder State Govt.
32
Resource Envelope
  • Plan-unit wise resource envelope can be defined
    for each Source of Funding
  • Resource envelope corresponds to
  • Allocation under various Central and State
    Government Schemes (Perspective, Expected and
    Actual budgetary Allocation)
  • Plan units own funds through taxation and
    various services

33
Funding Sources
Parastatal Bodies
PSUs
State Line Department
34
Tied Untied Funds
35
(No Transcript)
36
(No Transcript)
37
(No Transcript)
38
Planning Process Stakeholder - Planning Units
  • Facilitates preparation of Perspective Plan,
    Draft Annual Plan and Annual Action Plan

39
Planning Cycle
Physical Financial Progress Details
Execution status and learnings
40
Identify Resources
41
Identify Resources
42
Planning
  • A plan would consist of one or more works.
  • PlanPlus automatically includes all works which
    have been created for the Plan Year. In addition,
    it also includes spill-over, on-going and resumed
    works from previous years plans in the current
    Plan.
  • Based on the sector of the work and that of the
    component, the software automatically shows the
    amount of expected allocation under different
    components of different schemes.
  • The Planning unit can allocate funds from
    different schemes/components to different works
  • One work may be funded by more than one Source of
    Funding, thereby converging the funds from
    different funding sources
  • If any permissible activity is defined under a
    component, then the planner will have to indicate
    the activity of the component under which the
    work is being undertaken.

43
Planning (contd.)
  • Works may be included or excluded from the plan
    as per availability of funds. However, works
    which are on-going or spill-over cannot be
    excluded.
  • Works funding can be shared by multiple Planning
    Units
  • Priority can be set for each work fund
    availability is automatically re-calculated
  • A Planning unit has to answer defined Process
    Checklist based on scheme components from funds
    are proposed to be taken up
  • The software also informs the planner about fund
    availability under different schemes under
    different sectors thereby ensuring maximum
    utilization of funds

44
Create Plan
45
Allocation of Funds to Works
46
Collaborative Planning
47
Who is doing what in my Gram Panchayat
  • What are other planning units planning for my GP?
  • Am I duplicating their efforts?

48
Can I Collaborate?
  • Can I add value to what others are planning in my
    GP?
  • Is the other planning unit short of funds? Can I
    contribute?
  • Am I short of funds? Is any other planning unit
    willing to contribute?

49
Sharing of Work Funding
  • Provision to share the cost of Work among
    different Planning Units
  • Planning Unit can demand the amount from multiple
    planning units
  • Planning Unit giving the amount can accept/reject
    the demand
  • Mandatory to freeze the amount if the request for
    demand is accepted.

50
(No Transcript)
51
(No Transcript)
52
Standing Committees
  • Provision to define Plan Unit wise Standing
    Committees
  • Planning Unit can assign works to the Standing
    Committees
  • Mandatory to assign works to Standing Committee
    (for both Draft Action Plan and Annual Action
    Plan) if Standing Committee exist for the Plan
    Unit.

53
Planning Workflow
  • Kerala

54
Kerala Planning Workflow
Citizens/
NGOs/
Suggest
CBOs
/
Needs/Expectations
GramSabhas
/
Area
Sabhas
/
Planning Units
Unstructured wish
-
list
SORs
Planning Unit
Assign
Prepare Annual Plan
Formulate Projects
(
ULBs

RLBs
)
Works to Projects
(Prioritization
(Sectoral Integration)
source of funding)
(Estimates,time, location etc)
Forward to TAC
Technical
Evaluate for
Approval Committee
Review
All works approved?
Technical Scrutiny/
(BTAC/DTAC/STAC)
Sanction
Yes
Evaluate for
Review
All works approved?
DPC
Administrative Approval
Approved Plan
Yes
55
Karnataka Local Body Planning Work Flow
Suggest
GramSabhas/ Ward Sabhas
Needs/Expectations
Prioritize
Allocate Funds
RLB/ULB (Standing Committee)
Prepare Shelf of works
Line Deptt.
Yes
Identify More Works
Forward (for technical scrutiny preparation of
cost estimates)
Technical Scrutiny
Review
(AE/EE/CE)
All works OK?
Evaluate work s prepare cost estimates
Review
ZP (General Body)
Evaluate for Administrative Financial
Approval
All works approved?
Accord Final Approval
DPC
Approved Draft Plan
56
Rural Local Body WorkFlow Madhya Pradesh
Suggest
GramSabhas/ Ward Sabhas
Needs/Expectations
RLB (Standing Committee / General
Administrative Committee)
Prioritize
Allocate Funds
Prepare Shelf of works
Forward (for technical scrutiny preparation of
cost estimates)
Technical Scrutiny
Review
All works OK?
Evaluate work s prepare cost estimates
Forward Own Plan along with lower tier Plan, if
any
Higher Tier (JP/ZP)
Examine Lower Tier Plan
Prepare Own Plan
Forward all RLB Plans
Accord Final Approval
DPC
Approved Draft Plan
57
Urban Local Body WorkFlow Madhya Pradesh
Suggest
GramSabhas/ Ward Sabhas
Needs/Expectations
ULB (Standing Committee)
Prioritize
Allocate Funds
Prepare Shelf of works
Forward (for technical scrutiny preparation of
cost estimates)
Technical Scrutiny
Review
All works OK?
Evaluate work s prepare cost estimates
Accord Final Approval
DPC
Approved Draft Plan
58
Gram Panchayat WorkFlow Orissa
Suggest Needs/ Expectations
Palli Sabhas
Prepare Shelf of works
Prioritize
Gram Panchayat
Allocate Funds
Forward (for technical scrutiny preparation of
cost estimates)
JE(Block)/ AE(Block) (Technical
Approval)
Evaluate work s prepare cost estimates
OK
Sarpanch/Gram Panchayat (Administrative Approval)
Accord Adm. Approval)
Review
All works OK?
Forward
Panchayat Samiti
Forward GP Plan
Zilla Parishad
Forward GP Plan
Accord Final Approval
Approved Draft Plan
DPC
59
Panchayat Samiti WorkFlow Orissa
Suggest Needs/ Expectations
Citizen Body
Prepare Shelf of works
Panchayat Samiti
Prioritize
Allocate Funds
Forward (for technical scrutiny preparation of
cost estimates)
JE(Block)/ AE(Block) / EE(DRDA)/ SE(PR Dept.)
(Technical Approval)
Evaluate work s prepare cost estimates
OK
BDO/ PS, Chairman/ Collector
Accord Adm. Approval)
Review
All works OK?
Forward
Zilla Parishad
Forward PS Plan
Accord Final Approval
DPC
Approved Draft Plan
60
Zilla Parishad WorkFlow Orissa
Suggest Needs/ Expectations
Citizen Body
Prepare Shelf of works
Prioritize
Zilla Parishad
Allocate Funds
Forward (for technical scrutiny preparation of
cost estimates)
JE/ AE/ EE/ SE(PR Dept.)
(Technical Approval)
Evaluate work s prepare cost estimates
OK
Secretary, ZP/ Exec. Officer, ZP/ CEO,
ZP (Administrative Approval)
Accord Adm. Approval)
Review
All works OK?
Approved Draft Plan
DPC
Accord Final Approval
61
Planning Workflow in PlanPlus
  • Captures the plan unit wise, state-specific work
    flows as defined by the State Planning
    Department.
  • The Plan is routed to various stakeholders as per
    the defined workflow.
  • Different Workflows can be defined for Draft
    Annual Plan and Annual Action Plan
  • Versions of the workflow are maintained to ensure
    consistency in legacy plans.

62
Technical Scrutiny
  • Scrutinize Plans submitted by Planning Units and
    offer comments on cost, duration and methodology
  • Once an optimal Plan has been prepared by a
    planning unit, it may get forwarded for technical
    clearance
  • At the time of technical clearance, the Plan may
    be forwarded to more than one approving entity
    based on the sector and cost of the work.
  • The Plan is returned back to the Planning Unit if
    any work requires modification to meet technical
    (for eg., revision of cost estimates)
  • The Planning Unit must modify as per the
    clearance requirement and forward it back for
    clearance
  • If all works are cleared, the Plan is forwarded
    to the next level as defined in the process flow
    of the planning unit.

63
Administrative Approval
  • At different stages of planning process,
    administrative approval may be required at
    different levels.
  • The privilege for administrative approval can be
    given to a user for one or more planning units
  • Based on the workflow, the plan of the planning
    unit will be automatically forwarded to the
    approving authority

64
(No Transcript)
65
DPC Approval
  • Review and Consolidate the plans of local bodies
    in view of district priorities
  • Accord clearance for the plans of each planning
    unit in the district after examining the plans in
    a holistic manner
  • Generate the District plan - DPC

66
Plan Review/Consolidation by DPC
  • The DPC can generate sectoral views of the Plan
    (to be reviewed by sectoral committees) and take
    decisions (scrutinise, review and approve) on
    each work included in the Plan
  • The DPC can either approve a Plan (if all works
    are approved) or return the Plan to the planning
    unit for review/modification
  • The DPC can look at the plan unit wise plan
    report which provides a detailed analysis of the
    Plan of the selected planning unit

67
Planning Execution
  • Records Execution of Works Approved in the Plan

68
Plan Execution
  • Planning Unit can Record Execution of Works
    Approved in the Action Plan
  • Frequency of Recording is event-based
  • Expenditure on the Work can be recorded Component
    Wise
  • Work-wise outputs to be Achieved can recorded

69
Fund Receipt Details
70
Work Execution Status
71
Expenditure Details
72
Physical Progress
73
(No Transcript)
74
(No Transcript)
75
(No Transcript)
76
(No Transcript)
77
(No Transcript)
78
(No Transcript)
79
Reports
  • Annual Plan of respective Plan Units
  • Integrated District Plan
  • History of the Plan as it goes through the cycle
    of revisions
  • Status of approval of different works
  • Expected Fund utilization
  • Sectoral Plan
  • Scheme Plan
  • Sectorwise Scheme plan and vice versa
  • Sectorwise BRGF allocation
  • Gap filling by BRGF

80
(No Transcript)
81
(No Transcript)
82
(No Transcript)
83
Plan Unit Report
84
District Plan Report Template
85
District Plan Report
86
District Plan Document
  • Anatapur, Andhra Pradesh
  • Dhenkanal, Orissa

87
Customizing PlanPlus
  • PlanPlus is a highly generic software making it
    easy to customize it to specific requirements
  • Provides complete local language support in
    UNICODE
  • Captures the state-specific workflows as defined
    by the State Planning Department
  • Can be easily extended to facilitate the
    preparation of state and central government
    plans.
  • Is web-based but can be installed locally also
  • Based on Open source tools and technologies

88
Capacity Building
  • National Workshops
  • No. of trainings 4
  • No. of people trained - 172
  • State Level
  • No. of trainings 88
  • No. of people trained - 2534
  • District Level Trainings
  • No. of trainings 292
  • No. of people trained 7820
  • Total Trainings
  • No. of trainings 386
  • No. of people trained 10526

89
Capacity Building
Workshops No. of Workshops Total No. of People Trained
National Level 4 172
State Level 88 2534
District Level 292 7820
Total 386 10526
Training Details available at http//panchayat.gov.in/priprofiler Training Details available at http//panchayat.gov.in/priprofiler Training Details available at http//panchayat.gov.in/priprofiler
Demo Site for hands-on available at http//panchayat.gov.in/planplus Demo Site for hands-on available at http//panchayat.gov.in/planplus Demo Site for hands-on available at http//panchayat.gov.in/planplus
Computer Based Tutorial (CBT) available both online as well as for download from both demo as well as actual site Computer Based Tutorial (CBT) available both online as well as for download from both demo as well as actual site Computer Based Tutorial (CBT) available both online as well as for download from both demo as well as actual site
90
Implementation Status
Plan Year No. of District Plans Total No. of Approved Plans No. of BRGF Planning Units adopted Planplus.
2007-2008 37 21344 34612
2008 - 2009 66 35512 53952
2009 - 2010 63 38583 57249
91