NETPDTC AIM Central Site and CPM Hosting

Description:

NETPDTC AIM Central Site and CPM Hosting Bruce Bare, NETC, CIO Denise Green, CNATT N6 Dave Donnelly, CSFE LSO Peg David, NETPDTC Pgm Mgr Jake Aplanalp, NAWCTSD, AIM ... – PowerPoint PPT presentation

Number of Views:147
Avg rating:3.0/5.0
Slides: 15
Provided by: jac111
Category:
Tags: aim | cpm | netpdtc | central | hosting | site

less

Transcript and Presenter's Notes

Title: NETPDTC AIM Central Site and CPM Hosting


1
NETPDTC AIM Central Site and CPM Hosting
Bruce Bare, NETC, CIO Denise Green, CNATT N6 Dave
Donnelly, CSFE LSO Peg David, NETPDTC Pgm
Mgr Jake Aplanalp, NAWCTSD, AIM Pgm Mgr
15-17 Feb 11
2
Overview
  • Central Site AIM (AIM I/II)
  • CPM Migration Plans

3
Follow-on Actions from May 10 FRB
  • NETC CIO coordination within the organization and
    with NETPDTC, supported by AIM team
  • Ongoing AIM II CITRIX implementation for CNATT
  • Near-term AIM II implementation for CSFE
  • CID, CSCS, and SLC instances in planning stage
  • NETC CIO/NETPDTC support for IA Certification and
    Accreditation (CA) documentation development and
    approval AIM team working on CA document
    drafts
  • NETC CIO/NETC N7/AIM PM submitted POM-13 data for
    procurement of hardware/software necessary for
    enterprise-wide AIM CITRIX access

4
NETPDTC AIM Central Site / CPM Hosting
  • NMCI and non-NMCI users access AIM application(s)
    and centralized SQL Server database(s) via
    Metaframe
  • CNATT is the first instance of that architecture
    which is now operational

5
CNATT Implementation
  • CNATT had dispersed instances of AIM across 15
    sites in the CNATT domain
  • Supported by NETC CIO/NETPDTC, consolidating all
    AIM II curricula data at NETPDTC-hosted Central
    Site and based on NETC CIO architecture
  • Planning begun Sep 09, prototype on-line for
    testing in Apr 10 full system operation Jan 11
    data migration 25 complete (75,000 hrs)
  • AIM team supported CNATT/NETPDTC by
  • Implemented new 5-level privilege structure for
    AIM II w/in Central Site domain
  • Assisted in data migration/consolidation/performan
    ce testing

6
CNATT AIM Central Site Process Flow
7
CNATT AIM II Privilege Levels
8
CSFE Implementation
  • Based on guidance from NETPDTC, CSFE collecting
    data for migration and setting up Citrix user
    accounts
  • CSFE reviewing CNATT Central Site business
    process flow and 5-level privilege structure for
    applicability to CSFE curriculum business process
  • AIM team supporting CSFE in tweaking Central Site
    privilege as needed to map to CSFE business
    process and providing end-user assistance
  • CSFE applying lesson learned from CNATT
    implementation Central Site AIM Admin is
    experienced AIM user and curriculum manager

9
CPM Migration Plans
  • CPM Rel 4.0 currently operational at NAWCTSD on
    fedsun server accessed via DREN
  • Plan to migrate to NETPDTC as NETC enterprise
    application within NMCI domain
  • Request for Information Services (RIS) being
    staffed among NAWCTSD and NETC N6/NETPDTC
  • Schedule for prototype installation and
    operational transition TBD contingent on
    completion of IA CA documentation and now in
    work by NAWCTSD and NETPDTC and certification
    testing

10
Questions?
11
Backup Slides
12
Current fedsun Support at NAWCTSD
  • Continued production support for SSP SWS training
    community
  • Resolved performance and reliability issues
    complete rebuild of system with new servers
  • Lab now has IA (Information Assurance) ATO
    (Authority to Operate)
  • AIM I Rel 4.1 (CPM/LO Module updates) instance
    added to production SWS AIM I Rel 4.0 instance to
    support SWS MT Continuum production phase content
    design and development

13
NAWCTSD Central Site Architecture
14
NETPDTC Architecture
CSFE Remote Users (CAC)
CPM hosting/ access in work