Suggestive Outline for DPR preparation of watershed Projects - PowerPoint PPT Presentation

1 / 37
About This Presentation
Title:

Suggestive Outline for DPR preparation of watershed Projects

Description:

Suggestive Outline for DPR preparation of watershed Projects * * * * * * * * * * * LOGO * * * * * * * * * * * * * * * * * * * * * * * * * * Chapters 3 4 Executive ... – PowerPoint PPT presentation

Number of Views:485
Avg rating:3.0/5.0
Slides: 38
Provided by: Len845
Category:

less

Transcript and Presenter's Notes

Title: Suggestive Outline for DPR preparation of watershed Projects


1
Suggestive Outline for DPR preparation of
watershed Projects
2
Chapters
  • Executive summary
  • Introduction and background
  • General description of Project area
  • Baseline Survey
  • Institution building and project management
  • Management/ Action plan
  • Capacity Building Plan
  • Phasing of Programme and budgeting
  • Consolidation/ Exit strategy
  • Expected outcome

3
4
3
  • Executive Summary
  •  
  • Brief about area
  • Institutional arrangements
  • Salient Project activities
  • Physical target and financial outlays
  • Treatment area and details
  • Fact sheet about bench mark indicators and action
    plan at a glance

4
Introduction and background
  • Project Background
  • Need and Scope for Watershed Development
  • Weightage for selection of Watershed
  • Watershed Information
  • Status of previous watershed programmes other
    development projects in the area
  • (Ensure that information for MIS tables
    supplied by DoLR is reflected in relevant parts
    of DPR)

5
  • General description of Project Area
  •  
  • Location longitude, latitude, state, District,
    Taluk, Block, Villages, Approach road/land mark
    (watershed location map)
  • Area under major land uses for irrigated and
    rainfed
  • Physiography Elevation range, Slope range, Order
    of watershed, Drainage map
  • Climate Average monthly rainfall, temperature,
    wind velocity, evaporation, humidity
  • Watershed characteristics Shape index, Length of
    main stream, drainage density, average slope,
    relief, perimeter of the watershed

6
Base Line Survey
  • Socio-Economic conditions
  • Soil and Land Use
  • Agriculture crops, yields, horticulture etc
  • Production/farming systems
  • Livestock and Fisheries
  • Forests and Grass land, ago-forestry
  • Livelihood Status/pattern, sources, dependance
  • Hydrology and Water Resources
  • Resource conservation and water use
  • (May be collected from secondary sources, PRA
    exercise and if required by supplementing primary
    sources on sample basis)

7
Baseline survey
  • Act as a bench mark of the Project for future
    evaluation and impact analysis.
  • Collection of socio-economic details with
    Household survey.
  • Bio-physical survey to collect details of natural
    resources

Household Census
8
Bio-physical Survey
  • Geo-referenced data collection of particular
    natural resources.
  • Geo-referenced soil sample collection from
    representative area.
  • Survey number wise collection of land details
    about land acreage, ownership, crop
    cultivated(season), irrigation source and season
    details.

Natural Resources
Household Census
9
PRA Techniques
Local Knowledge
Natural Resources
Household Census
10
Institution Building and Project Management
  • About PIA
  • Indentify institutions along with their roles
    and responsibilities
  • Social Mobilization and Community organization
  • Formation of local level people Institutions WC,
    SHGs, UGS
  • Coordination and monitoring of implementation
    process including DPCs and other coordination
    mechanism.
  • Implementation plan
  • Convergence of watershed Programmes.
  • ?Identify and list Central/State sponsored
    schemes being implemented for convergence with
    their fund allocation
  • ?Prepare a matrix of major components of
    on-going and new schemes, which can be converged
    with watersheds.
  • ?Convergence mechanism at planning and
    implementation level

11
Problems to be addressed
  • Watershed Intervention
  • Conservation by NRM
  • Increase sustainable productivity of the system
  • Land non land based income generating
    activities
  • Formation of local institutions

12
Management / Action Plan
  • Prepare based on problems, needs, land
    suitability class, priorities and technical
    feasibility in participatory process
  • Entry point activities
  • Ridge area treatment
  • Land development private, waste, degraded,
    common
  • DLT measures
  • Water harvesting structures
  • Water, energy and resource conservation
    technologies
  • Pasture development, sericulture, common land
    development
  • Forests lands for fodder, fuel, water, etc.
  • Horticulture development
  • Livestock, dairying, fodder, fisheries
    development
  • Veterinary services
  • Livelihood interventions for landless, micro
    enterprises
  • Production / Farming System , crop improvement
  • Marketing Linkages

13
Entry Point Activity
  • Urgent demand of the local community
  • Should enrich the common natural resources or
    production system, or common needs like drinking
    water, etc.
  • An instrument of confidence and rapport building

14
Net Planning
  • Meeting with local community members
  • Understanding various schemes running in the
    project area for convergence.
  • Detail Budgeting for each activity to be
    undertaken under IWMP.
  • Institute Building like Watershed committee, SHG,
    User Group
  • Group Discussion of activities with
  • -Watershed committee
  • -Farmers(Small, Marginal) Agricultural
    labours
  • -Women group
  • -BPL,SC/ST Population

15
Net Planning
Activities Planning
Local Knowledge
Natural Resources
Household Census
16
Net Required conservation Structure in village
S. No Measure No. of Structures proposed under IWMP Actual Requirement of the Village
1 Staggered Contour Trenching / Stone Bunding
2 Border Contour Trench
3 Earthen bund
4 Farm Pond
5 Farm bund
6 Afforestation( in Ha)
7 Waste weir
8 Water harvesting strs
17
Convergence Planning of various activity
S.No Measure Unit/Length (Rm) Net Expense under IWMP Convergence Strategy
1 Staggered Contour Trenching / Stone Bunding NREGS, Forest
2 Border Contour Trench NREGS, Forest
3 Earthen bund NREGS
4 Farm Pond  
5 Farm bund    
6 Afforestation( in Ha) NREGS
7 Waste weir  
8 Water harvesting strs  
18
Detail of other activities
  • Productivity enhancement of important crops and
    farming systems
  • Introducing improved technology
  • Livelihood intervention strategy
  • Demand driven, Business model of Production
    System
  • Capacity Building Plans

19
Focal points for livelihood intervention
  • Poor productivity of cattle
  • Migration due to lack of fodder
  • Low productivity of land due to less use of
    organic content.
  • Lack of use of Farmyard manure
  • Lack of grading of farm product.

20
Livelihoods intervention
Feed Fodder Bank, seed bank
Micro-enterprise model
Vermi- compost Unit
IGA eg lac, etc
21
Capacity Building Plan
  • Develop Annual Action Plan for CB
  • Phase wise key programmes, activities and
    contents
  • Actors, required skills
  • Type, level and nos of CB Programmes
  • Core team
  • Budget
  • Approval of Action Plan with annual phasing
  • Consortium of Service Providers/Resource
    Organizations
  • Developing resource materials, training manuals
    etc.
  • Pool of resource persons
  • Field level hand-holding support details
  • Follow-up and monitoring

22
Capacity Building Plans
  • NRM concept
  • Soil and moisture conservation structure
  • SHG formation and community mobilization.
  • Improved and Scientific agriculture practices.
  • Dairy development and Management.
  • Rural handicraft.
  • Exposure visits for production systems

23
Phasing of Programme and Budgeting
  • Administrative cost
  • Monitoring and Evaluation
  • Physical and Financial - Targets Out lays
  • Year wise Plan/Activities for development of
    watersheds
  • Year wise Financial requirements for
    developmental activities
  • Details of convergence with other schemes
    Physical Financial

24
Consolidation / Exit strategy
Consolidation and completion of various works,
Building the capacity of the community based
organizations to carry out the new agenda items
during post project period, Sustainable
management of (developed) natural resources,
up-scaling of successful experience regarding
farm production systems/off-farm livelihoods.
25
Expected Outcome
  • Some quantifiable indicators for outcomes of the
    programme including those in PPR
  • Productivity and production of crops,
    horticulture, livestock, fodder, agro-forestry,
    fisheries products, farming systems, land use and
    commodity diversification.
  • Changes in water availability (surface storage
    and ground water table), irrigated area, per
    capita income, creation of livelihood
    opportunities, out migration, cropping intensity,
    feed and fodder availability etc.
  • Environmental impact Change in soil loss
    enhancing the perenniality of flow and reducing
    peak flows, recharge of ground water enhancement
    of nutrients water quality.
  • Employment generation casual and regular

26
Use of Village Planning Map
Using Contour map to demarcate area for SCT and
Contour trench
27
Identifying location for Check Dam
  • Potential site for check dam(Drainage point)
  • Calculate the catchment area

28
(No Transcript)
29
(No Transcript)
30
(No Transcript)
31
(No Transcript)
32
Base-line Map
33
(No Transcript)
34
(No Transcript)
35
(No Transcript)
36
(No Transcript)
37
Thank You !
Write a Comment