Title: Preparation of D1.7


1
Preparation of D1.7
  • Massimo Sgaravatto
  • INFN Padova

2
Introduction
  • D.17 Final evaluation report
  • We should report (as we have been told)
  • Achievements
  • Fulfilments and deviations (explaining why) of
    the original plans
  • Evaluation
  • Future Directions

3
Proposed Outline
  • Introduction and executive summary
  • Summary of activities of WP1 in these 3 years
  • First WMS prototype
  • Review of WMS architecture and second release of
    WMS
  • Support and bug fixes
  • Activities within Iteam, ATF, QA, Security group

4
Proposed Outline
  •  Achievements and evaluation
  • Summary of capabilities of the WMS
  • Some numbers on performance ?
  • Use of the WP1 software
  • WMS used in different environments, and not only
    in EDG (used by LCG, CrossGrid, Grid.it, )
  • Contributions to standards
  • Activities within GGF
  • Grid Accounting
  • GridCPR activities
  • What else ?
  • Glue Schema activities
  • Papers for journals and conferences ?
  • We didnt do a very good job here
  • What else could we write for evaluation ?
  • Some performance numbers ? Which ones ?
  • Difficult to rely on evaluation criteria written
    in D1.2 (they were quite generic)

5
Proposed Outline
  • Deviations (Final results wrt what was
    initially planned in the TA)
  • What was not done (or was not deployed) but was
    planned and why ?
  • What was done even if not initially planned and
    why ?
  • What was done but was not deployed and why ?
  • Future work
  • See i.e. talks given by F. Prelz at INFN-GRID
    worksop in Catania
  • Going towards a Service Oriented (OGSA)
    architecture
  • Conclusions

6
Proposed schedule
  • Friday 14/11 first version ready for internal
    (WP1) review
  • I should basically write it, but I will ask
    contributions for some specific parts (e.g.
    participations to ATF, QA, , activities within
    GGF)
  • Thursday 20/11 deadline for comments
  • Much better if comments can arrive earlier
  • 24/11/2003 D1.7 ready for internal (EDG) review
  • Moderator J. Jensen (WP5)
  • Reviewers
  • M. Corvo (WP8)
  • A. Terracina (WP9)
  • J. Montagnat (WP10)
  • 15/12/1003 PTB approval