Title: Facility Maintenance
1Facility Maintenance
2Typical Job Categories for Maintenance Plant
Maintenance
Typical Job Categories for Maintenance
Plant Maintenance
Electricians
Bricklayers
Heavy Movers
Tinsmiths
Painters
Window Washers
Welder
s
Glaziers
Janitors
Pipe fitters
Concrete Workers
Gardeners
Fire/emergency People
Carpenters
Steam fitters
Millwrights
Machine Maintenance
General Mechanics
Machinists
Sheet Metal Workers
Welders
Electronic Technician
Computer Technicians
General Mechanics Machinists Sheet Metal
Workers Welders Electronics Technicians Computer
Technicians
3MAINTENANCE PROCEDURES Emergency
Maintenance Preventative Maintenance
4(No Transcript)
5Emergency Standby Capacity
Probability that Number of Machines will be
broken Total 100
Cost to Rent Number of Machines Out of Order
6Cost of Repair-on-Breakdown
- We have a line with 50 robot GMA welders
- The cost to do a preventative maintenance
overhaul on each machine is 200/machine - Average breakdown repair costs are 700/machine
- Objective Calculate the cost if we elect to
repair only when a machine breaks down. How much
must we set aside each month?
7Probability of Breakdown as a function of months
after overhaul of all machines.
They Add to 100
The months time the probability results in the
partial expected time for failure.
Since the partial probabilities add to 100, the
partial times add to the expect time for a
failure 8.42 months
1.00
8The cost of repair-on-breakdown then
(700/machine) /(8.42 months) 50 machines
4157/month Thus, we better place 4157 in a
fund every month if we decide to do
repair-on-breakdown policy.
9Preventative Maintenance
- We have a line with 50 robot GMA welders
- The cost to do a preventative maintenance
overhaul on each machine is 200/machine - Average breakdown repair costs are 700/machine
- Objective Calculate if preventative maintenance
should be done and if so what the schedule should
be.
10Calculate Cost for Preventative Maintenance For
every preventative maintenance overhaul we do it
will cost 200/machine 50 machines
10,000 If we do a preventative maintenance
every month, it will cost 10,000/month If we do
a preventative maintenance every 2 months, it
will cost 5,000/month, etc.
11Even though we do preventative maintenance, we
can expect some breakdowns to occur anyway. We
can calculate the number of expected breakdowns
each month using the following equation.
Where Bn expected number of breakdowns N
number of machines Pn probability of machine
breakdown in period n
That is, 2.5 breakdowns in the first month
That is, 3.63 breakdown in first 2 months
12PLOT
Expected Cost Ave. Number 700/machine 2.5
700 1750
Total Cost Expected Cost Prev. Maint. Cost
1750 10000 11750
134157
14Maintenance Homework