Anti-icing Study at O - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Anti-icing Study at O

Description:

Anti-icing Study at O Hare International Airport Professor: Barry J. Dempsey Graduate Asst.: Nathan M. Carroll BRIEF HISTORY Winter of 2002, phase I testing began ... – PowerPoint PPT presentation

Number of Views:69
Avg rating:3.0/5.0
Slides: 15
Provided by: nathanc6
Category:

less

Transcript and Presenter's Notes

Title: Anti-icing Study at O


1
Anti-icing Study at OHare International
AirportProfessor Barry J. DempseyGraduate
Asst. Nathan M. Carroll
2
BRIEF HISTORY
  • Winter of 2002, phase I testing began on textured
    aggregate coatings.
  • These Anti-icing Smart Pavement Overlays were
    evaluated for durability.
  • Preliminary observations demonstrate feasibility
    of installation process and durability.
  • Phase II began with installation of observation
    bed at OHare.

3
(No Transcript)
4
THE THEORY
  • The pavement overlay is placed on an existing
    pavement surface.
  • Anti-icing chemical is applied prior to icing
    conditions.
  • Icing conditions occur.
  • Anti-icing chemical are released from pavement.
  • Ice melts.

5
OUR GOAL
  • To perform a comprehensive observation of the
    test pavement under controlled conditions.
  • To perform complete analysis of all recovered
    data to determine the durability, performance and
    surface friction characteristics of the
    anti-icing pavement.

6
OBSERVATIONS
  • Visual Conditions
  • Weather Conditions
  • Surface Temperature
  • Operations Maintenance

7
Visual
  • On-sight observation of entire test bed.
  • Photographic documentation.
  • Real time video feed of taxiway (24/7).

8
(No Transcript)
9
Weather Conditions
  • Daily climatic data collected from NOAA.
  • Climatic data utilized in the Enhanced Climatic
    Model (ECM).
  • Surface temperatures monitored with existing
    sensors.

10
Operations and Maintenance
  • Use of observational video to determine all
    activities that occur on the pavement along with
    quantity and duration of activities.
  • Documentation of O Ms daily log of activities
    for correlation with video observation.

11
Equipment De-icer and Brushes
12
INITIAL ACTIVITES
  • Camera system installed and fully operational by
    end of October
  • Run friction tests to establish baseline for
    anti-icing pavement and control.
  • Take core samples from test site

13
TIMELINE
  • November 1, 2004
  • Begin complete observations of test pavement
  • January 1, 2005
  • Submit interim report on findings
  • April 1, 2005
  • Begin intense analysis of all accumulated data
  • August 2005
  • Submit Final Report

14