JAR-OPS 3 - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

JAR-OPS 3

Description:

JAR-OPS 3 JAR-OPS Training Course Lectures 13 & 14 JAR-OPS 3 Joint Implementation Procedures To provide fair and equal competition Chapters 1 to 3 form the ... – PowerPoint PPT presentation

Number of Views:205
Avg rating:3.0/5.0
Slides: 22
Provided by: S276
Category:
Tags: jar | ops | launching | product

less

Transcript and Presenter's Notes

Title: JAR-OPS 3


1
JAR-OPS 3
JAR-OPS Training Course Lectures 13 14
2
JAR-OPS 3
Lecture 13
OPERATIONS
Joint Implementation Procedures
3
Joint Implementation Procedures
JAR-OPS 3
The purpose of JIP is
  • To provide fair and equal competition

and
  • To justify the free exchange of qualifications
    and services

4
JAR-OPS 3
Joint Implementation Procedures
Content of the JIP
  • Chapters 1 to 3 form the INTRODUCTION
  • Chapters 4 to 8 contain procedures concerning AOC
  • Chapters 9 to 11 are entitled REGULATION
  • Chapters 12 and 13 are about STANDARDISATION
  • The final section contains APPENDICES.

5
JAR-OPS 3
Joint Implementation Procedures
  • Technical findings
  • How the Authority arrives at a decision.
  • Legal findings
  • The decision taken by the Authority.

6
Exemptions (JAR-OPS 3.010)
JAR-OPS 3
  • The Authority may exceptionally and
    temporarily grant an exemption from the
    provisions of JAR-OPS Part 3 when satisfied
    that there is a need and subject to
    compliance with any supplementary condition
    the Authority considers necessary in order to
    ensure an acceptable level of safety in
    the particular case.

7
Exemptions (EXAMPLE)
JAR-OPS 3
  • Technical findings
  • written request
  • from the operator himself
  • explains why Exemption is needed
  • how safety is maintained and,
  • Request should have the support of the assigned
    Inspector.

8
Exemptions (EXAMPLE)
JAR-OPS 3
  • Legal findings
  • Authority must be satisfied
  • That the need is exceptional and temporary
  • And
  • That the proposal is acceptably safe
  • (The Authority may impose conditions)

9
JAR-OPS 3
End of Lecture 13
Any Questions?...
10
LECTURE 14
JAR-OPS 3
  • The principle and the practice of
    Operational Standardization Team
  • (OPST)

11
The Operations Division
JAR-OPS 3
  • The mission of the Operations Division is
  • To give assistance to Authorities on the
    implementation of JAR-OPS
  • To monitor the Performance of Authorities by
    assessing the consistency with which JAR-OPS is
    implemented.


12
OPERATIONS STANDARDISATION TEAM
JAR-OPS 3
13
Operational Standardisation Team
JAR-OPS 3
  • The objective of standardisation
  • How it is expected standardisation will work.

14
End-product
JAR-OPS 3
The Scope
  • National industry regulated in accordance with
    JAR-OPS and the JIP
  • National industry which offers a safe service
    to the public.
  • Ensuring exchange of services between JAA
    countries is justified (Mutual Recognition)

15
OPST Co-ordination
JAR-OPS 3
  • OPST activity is co-ordinated by Operations
    Division
  • (JAA HQ)

16
JAR-OPS 3
  • National Coordinator

17
OPST Sequence Of Events
JAR-OPS 3
  • Briefing
  • OPST visit
  • De-brief
  • Report.

18
Appeal Process (JIP Chapter 13)
JAR-OPS 3
  • Initial correspondence between JAA HQ and
    the Authority
  • Lower appeal board - Operations Sectorial
    Team
  • Upper appeal board - JAA Committee
  • Sanctions.

19
OPST Team Member Qualities
JAR-OPS 3
  • Adequate Experience of the Right Sort
  • Ability to Spot Problem Areas
  • Ability to Prioritise
  • Tact and Diplomacy
  • Awareness of National Culture and Sensitivities
  • Finally, and Most Important
  • Ability to put Aside Personal Prejudices in Order
    to work Effectively as Part of an
    International Team

20
EASA
JAR-OPS 3
  • On the 15 July 2002, EU 1592 EASA launching,
  • Common rules and implementation of this rules,
  • OPS, Licensing, third country A/C, airworthiness
    and environment Essential requirements to be
    developed by mid 2003
  • Legal existence, administrative financial
    autonomy COMMUNITY body issues technical
    findings certificates,
  • Transfer from JAA to EASA Certification (A/C)
    and Environment, from 28/09/2003 then
    transitional period of 42 months.

21
JAR-OPS 3
End of Lecture 14
Any Questions?...
Write a Comment
User Comments (0)
About PowerShow.com