Title: AKDENIZ HARITA INSAAT SAN. VE TIC. LTD. STI.
1AKDENIZ HARITA INSAAT SAN. VE TIC. LTD. STI.
Cemalpasa mah. 5. sk. Karsal Apt. k1 d4
seyhan/ADANATel 0322 457 37 31 Fax 0322 459 84
13
2AKDENIZ HARITA INS. SAN. VE TIC. LTD. STI.
MAINTAINS LEADERSHIP ON ITS SECTOR.
- S. Turgay Ardiç, our founding partner of our
Company has made below mentioned a rule when he
has started his business life If this job
could be made I should do the best - Therefore, he had to work too much, had to apply
technological innovations. And he managed all
these things. He has set his signature on
important projects administrations such as
Provincial Bank, TKGM, TCK, TEIAS, BOTAS. He has
set his signature on from Izmir to Ardahan
without exception regions under responsibility of
Akdeniz Harita Ins. San. Ve Tic. Ltd. Sti. - Akdeniz Harita Ins. San. Ve Tic. Ltd. Sti.
Has proved that the company can manage works more
complicated and greater than projects that
company finished and continues by its background,
technical power, work experiences, equipment
capacity and technical qualified staff.
3Company Target
- Our company is one of the leadership on project
and construction sector, aims to tune in new
sectors in homeland by expanding service spectrum
and to represent ideally our sector and Country
by transferring out present service quality in
foreign countries.
4WORK MENTALITY
- Akdeniz harita Insaat San ve Tic ltd. sti. that
has adopted performing all kinds of works in
quality and on due time under companys
responsibility as a principle since company has
started on action, has not recognized quality as
legal obligation and has adopted as life
philosophy. - In this context
- Recognise quality service mentality as a basic
value - Protect Companys reputation, keep away from
injurious applications for any reason whatsoever.
- Follow the latest technological and occupational
developments, provide them for company as soon as
possible. - Encourage all staff for being full participant
and efficient. - Produce fast, reliable and understandable
service. Provide continuous development of our
service and quality. - Optimize project management and resource
utilization. - Our quality policy that has been formed such
as below mentioned has been adopted as COMPANY
SPIRIT and LIFE STYLE.
5Management Team
- Company Director S. Turgay ARDIÇ
- He graduated from Geodesy and Photogrammetry
Engineering , Faculty of Civil Engineering at
Istanbul Technical University in 1981. He started
his service life in ENKA Construction Company
and he worked as Supervising Engineer Region
Directorate of Provincial Bank in Elazig and
then as a Survey Project Group Authority at TAG
Motorway in TEKFEN Construction Company and
finally has founded Akdeniz Harita Ins. San. Ve
Tic. Ltd. Sti. in 1990 and he managed to achieve
our companys present quality by adding
innovations to his experiences. - Company Partner Mustafa Serdar INANÇ
- He graduated from Engineering Faculty at Selcuk
University in 1991. 2004 yilinda sirket ortagi
olan M. Serdar INANÇ has participated company in
2004 and he has served efficiently on
finalization of works rapidly, economically and
in quality from his participation day forward.
6CERTIFICATES OF OUR COMPANY
7CERTIFICATES OF OUR COMPANY
8SCOPE OF ACTIVITIES
- Our company has produced project, cartography and
construction works for various administration and
private sector companies by experienced
management team, qualified engineer and
technician staff, and 20 years experience in our
company. By the reason of these properties, the
company is the ideal company in its sector. - These are some of scope of activities of Akdeniz
Harita Insaat San. Ve Tic ltd. Sti. - Transmission Line and Warehouse Project and
Construction Works. - Infrastructural Project and Construction Works.
- Drawing As-built projects.
- Found and Upgrade Triangulation, Levelment
Networks - GPS measurement and applications,
- Produce base map
- Route Maps, Survey projects works ( Road, Power
Line, Pipeline, Communication Lines) - Expropriation Plans
- Land and Building Lot Arrangements (Drawing and
Application of Zoning Plan) - Bathymetric (Hydrographic) Map production
- Prepare Cross -Section, Longitudinal Section and
Cubage Calculations - Establishments and Activation of Urban
Information and Infrastructure Information
Systems - Follow construction projects
- Geotechnical Report
- Environmental Impact Assessment Reports
9References
- We serve Institutions and Organisations such as
below mentioned - Seyhan County Municipality
- Yüregir County Municipality
- Sariçam County Municipality
- Karaisali Municipality
- Sarimazi Municipality
- General Directorate of Highways 5th District
Office - General Directorate of Provincial Bank
- General Directorate of Turkish Oil Pipelines
Corporation (Botas) - General Directorate of Land Registry and Cadastre
- General Directorate of Turkish Electricity
Transmission Corporation - STFA Construction
- Gama Construction
- Tekfen Construction
- Güris Construction
- Agaoglu Construction
- Toros Agriculture Corporation
- Iskenderun Thermal Power Plant
- Tekeli Engineering
10Completed Works
- Some of completed works in the last decade are
given below - 2000
- Adana Potable Water Supply Project and Warehouse
Construction Works. - Adana Potable Water Supply Project Transmission
Line Pre-tensioned steel Jacketed Concrete
Pipeline Excavation Laying Work - Adana Potable Water Supply Project Urban
Network CTP Pipeline Excavation and Laying Work - Transmission Line between Kizildag Plateau and
Karaisali Centre - Survey, Project, Expropriation
and Construction Works - Adana Eastern Waste Water, Western Waste Water
Treatment Facility Base Map Work - Adana Potable Water Supply Project Urban
Distribution (Eastern)Network Survey and 2nd and
3rd Stage Expropriation Works - At Sarimazi Municipality 99 hectares field -
Alanya Municipality 25th District Zoning
Application Works - Provincial Bank- Denizli- Buldan Base Map Work
- 2001
- Adana Potable Water Supply Project and Warehouse
Construction Works. - Adana Potable Water Supply Project Transmission
Line pre-tensioned steel Jacketed Concrete
Pipeline Excavation Laying Work - Adana Potable Water Supply Project Urban
Network CTP Pipeline Excavation and Laying Work - Mersin Waste Water Project Survey- Project Works
- Adana Potable Water Supply Project Urban
Distribution (Western)Network Survey and Service
Road Expropriation - Seyhan District Municipality Zoning Application
of numbered 51 Organization Field - Bozüyük-Adapazari Natural Gas Pipeline Phase II
Project Survey- Project-Expropriation
Application and As Built Project and Construction
Follow up works
11Completed Works
- 2002
- Adana Potable Water Supply Project Warehouse
Construction Works. - Adana Potable Water Supply Project Transmission
Line pre-tensioned steel Jacketed Concrete
Pipeline Excavation Laying Work - Adana Potable Water Supply Project Urban
Network CTP Pipeline Excavation and Laying Work - Alanya Municipality 15th District Recycling and
Zoning Application work - Mersin Waste Water Project Sea Discharge
Hydrographical Map Work - Sarimazi Municipality 190 hectares field Zoning
Application Work and - Sarimazi Municipality 1350 hectares field Base
Map and Application Zoning plan Work - 2003
- Adana Potable Water Supply Project Warehouse
Construction Works. - Adana Potable Water Supply Project Transmission
Line pre-tensioned steel Jacketed Concrete
Pipeline Excavation Laying Work - Adana Potable Water Supply Project Urban
Network CTP Pipeline Excavation and Laying Work - Afsin-Elbistan Thermal Power Plant Unit B
Conveyor Route Survey and Project Works - Toros Fertilizer Factory Base Map and Zoning
Application Work - Isken Sugözü Thermal Power Plant Coal Stockyards
Tons Calculation Work
12Completed Works
-
- 2004
- Isken Sugözü Thermal Power Plant Coal Stockyards
Tons Calculation Work - Yatagan-Mugla ENH Survey, Project, Expropriation
Engineering Service Work - Gölbasi-Temelli ENH Survey, Project,
Expropriation Engineering Service Work - Kuzuculu/HATAY Base Map Work
- Hatay Industrial Zone Road, Drainage,
Infrastructure Project Works based on
Construction - 2005
- Isken Sugözü Thermal Power Plant Coal Stockyards
Tons Calculation Work - Alparslan-Hinis ENH Survey, Project,
Expropriation Engineering Service Work - Alparslan-Adilcevaz ENH Survey, Project,
Expropriation Engineering Service Work - Yumurtalik Sewerage Survey, Project, Construction
Follow up Works - Ardahan-Göle Digital Cadastral Mapping Work (Work
Bank) - Yüregir District Municipality Quarter of
Cumhuriyet Road Karatas Zoning Application Work - Yüregir District Municipality Quarter of
Cumhuriyet Road Güney Kusak -Karatas Zoning
Application Work - 2006
- Isken Sugözü Thermal Power Plant Coal Stockyards
Tons Calculation Work - Adana-Kozan Digital Cadastral Mapping Work
- Adana-Feke Digital Cadastral Mapping Work
13Completed Works
- 2007
- Isken Sugözü Thermal Power Plant Coal Stockyards
Tons Calculation Work - Yüregir District Municipality Quarter of
Cumhuriyet Road Karatas Zoning Application Work - Yüregir District Municipality Quarter of Seyhan
Road Karatas Zoning Application Work - Erzurum-Hinis-Tekman Digital Cadastral Mapping
Work (Work Bank) - Belen RES Bas Map Work
- 2008
- Isken Sugözü Thermal Power Plant Coal Stockyards
Tons Calculation Work - Tunceli-Hozat Digital Cadastral Mapping Work
- Bingöl-Karliova Digital Cadastral Mapping Work
- Sarimazi Municipality 1020 hectares field Base
Map Work - Ayas Energy Company Infrastructure Works before
Construction - Sarimazi Municipality 107 hectares field
Renovation Zoning Plan and Application Work - 2009
- Isken Sugözü Thermal Power Plant Coal Stockyards
Tons Calculation Work - Ayas Energy Company Infrastructure Works before
Construction - Ayas Energy Supervision of Plant Field Excavation
Works - Mersin RES-Gezende HES ENH Expropriation
Engineering Service Works - Yüregir District Municipality Quarter of Koprulu
Zoning Application Work
14Work in Progress
- Some Work in Progress are given as below
- Yüregir District Municipality Çamlibel-Yenidogan
Recycling- Zoning Plan Application Work - Bingöl Municipality 1st and 2nd Region Zoning
Plan Application Work - Yüregir District Municipality Quarter of Seyhan
3rd Region Recycling- Zoning Plan Application
Work - Kayseri-Kocasinan 22-A Digital Cadastral Revision
Work (World Bank) - Superonline Mersin Drawing Application Projects
for Laying Fiber Optic Cables and Following
construction works - Province Ordu ENH Expropriation Engineering
Service Works - Provincial Bank Giresun / Tirebolu Digital Base
Map Work - Provincial Bank Burdur / Çeltikci Digital Base
Map Work - Sariçam District Municipality Lot 11135 Lot
11142 Zoning Application Work
15Certificates for Work Completion and Sample
Projects
- Samples for completed works of our Company and
certificates for work completion are given as
below
16GENERAL DIRECTORATE OF TURKISH OIL PIPELINES
CORPORATION (BOTAS)CORPORATION OF OIL
TRANSPORTATION BY PIPELINE
17TURKEY ELECTRICITY TRANSMISSION CORPORATION
18YÜREGIR DISTRICT MUNICIPALITYADANA
19GENERAL DIRECTORATE OF HIGHWAYS5th REGION
DEPARTMENT
20GENERAL DIRECTORATE OF PROVINCIAL BANK
21ADANA POTABLE WATER SUPPLY PROJECT
22ADANA POTABLE WATER SUPPLY PROJECT
23ADANA POTABLE WATER SUPPLY PROJECT
24ADANA POTABLE WATER SUPPLY PROJECT
25SECTIONS FROM COMPLETED WORKSLAYING FIBER OPTIC
CABLES
26SECTIONS FROM COMPLETED WORKSADANA POTABLE WATER
SUPPLY PROJECT
27YAPILAN ISLERDEN KESITLER ADANA POTABLE WATER
SUPPLY PROJECT
28SECTIONS FROM COMPLETED WORKSKIZILDAG PLATEAU
TRANSMISSION LINE PROJECT
29SECTIONS FROM COMPLETED WORKSSUGÖZÜ THERMAL
PLANT STREAM IMPROVEMENT PROJECT
30PROVINCE KIRKLARELI PHOTOGRAMMETRIC MAP
PRODUCTION WORK
31ADANA URBAN DISTRIBUTION NETWORK WORK
32ADANA POTABLE WATER SUPPLY PORJECT