NY/NJ/PHL Metropolitan Area Airspace Redesign - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

NY/NJ/PHL Metropolitan Area Airspace Redesign

Description:

Title: Slide 1 Last modified by: Pete CTR Nelson Created Date: 4/10/2005 6:38:59 PM Document presentation format: On-screen Show Other titles: Arial Times New Roman ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 16
Provided by: erhNoaaG3
Category:

less

Transcript and Presenter's Notes

Title: NY/NJ/PHL Metropolitan Area Airspace Redesign


1
NY/NJ/PHL Metropolitan Area Airspace
Redesign Implementation Update
Presentation to Eastern Region Aviation Weather
Conference By Don Castonguay Air traffic
Supervisor New York Center Airspace Redesign
Team Peter Nelson Senior Management Analyst Air
traffic
Operations Date November 18, 2008
2
2000
1990s
2012
2007
2008
2006
1999
2005
2009
2010
3
Why We Need to Redesign Airspace
  • Routinely, the New York and Philadelphia
    metropolitan areas airports are among the top
    10 delayed
  • Lack of alternate routes closes off airspace in
    cases of severe weather
  • Multiple facilities fragment arrival and
    departure corridors
  • Complexity and congestion continue to be issues
    even with post-September 11 downturn

4
Implementation Overview
  • Implementation Plan began developed immediately
    following the signing of Record of Decision
    (September 5, 2007).
  • Initial changes to airspace were implemented on
    December 19, 2007
  • Implementation approach was segregated into four
    stages in the ROD
  • Each stage will take from 12 to 18 months and
    stages will overlap


5
ROMA (or Route Optimization and Mitigation
Analysis)
  • Considers all headings within an identified range
  • Evaluates noise impact for every possible
    combination of headings
  • Identifies exact headings for minimal impact

260
240
220
6
Motivation for Westgate Expansion
  • KEY ISSUES WITH CURRENT WESTGATE
  • ELIOT overload currentlyserves 3 airways and
    BRNAN
  • PARKE complexity climbingand descending
    aircraft
  • BIGGY complexity climbingand descending
    aircraft
  • RBV crossing traffic increased volume from JFK
  • IMPACTS
  • Westgate a chokepoint during peak demand
  • Passback of Miles-in-trail (MIT) restrictions to
    NY metro airports
  • Potential adverse impact on PCT arrivals

To IAD
ZNY39
J60
ZNY73
ELIOT
To BWI/DCA
J64
PARKE
LANNA
BIGGY
ZNY10
ZNY55
J80
J6
ZNY09
J48
J75
6
7
Westgate Expansion
8
Next Steps
TO-DO LIST
Terminal HITL evaluation
Expand Use of Terminal Separation Rules
  • N90 / ZNY resectorization
  • Separation standards in integrated airspace

Wrap JFK Departures
  • Route design
  • Sector boundary redesign
  • Runway use

N90 / ZNY Resectorization
Addition of Second New Departure Fix
  • Feasibility analysis
  • Design refinement

9
Key Elements of Stage 2 (4/1/2008 10/1/2009)
  • Relocate and Expand West Airways
  • Redesign NYNJPHL West Corridor
  • ZNY HITL June 2008 N90 HITL Oct 2008 Combined
    HITL Feb 2009
  • Apply Altitude Restriction on JFK En Route
    Arrivals for High and Low Capacities
  • JFK Improvements
  • Reroute ISP Arrivals over LENDY
  • Reroute JFK Europe Arrivals via ROBER
  • Reroute Traffic to New West Airways
  • Reroute Traffic to Existing West Airways
  • Reconfigure PHL
  • Reconfigure and Reroute Departures
  • Reroute Arrival Streams
  • Additional Dispersal Headings for RWY 09 and RWY
    27

10
Stage 2 Minor Airspace Realignment
11
Key Elements of Stage 3 (5/11/2010 11/9/2011)
  • Relocate and Expand North Airways
  • Redesign NYNJPHL North Corridor (ZNY, N90)
  • Reroute Northbound PCT Departure Routes
  • Redistribute Some ZNY Northgate Departures to ZNY
    Westgate
  • Redistribute Traffic on New North Routes
  • Facilitating Stage 4 Elements
  • Apply Altitude Restriction on LGA to Separate NY
    and PHL Traffic
  • Provide Arrival Coordination for Traffic Flow
    Management
  • Apply Terminal Separation Rules (allowing less
    stacking and MIT)
  • Additional MXE Departure Fix
  • Arrival Shift LGA and EWR
  • Facility Boundary Adjustments at ZNY, ZBW, ZDC,
    N90
  • Implement 3rd Dispersal Heading at EWR

12
Stage 3 Major Airspace Realignment
13
Key Elements of Stage 4 (3/10/2011 9/7/2012)
  • Relocate and Expand South Airways
  • Redistribute Traffic on New South Routes
  • Redesign NYNJPHL South Corridor
  • Apply Traffic Flow Management Rules for South
    Airway
  • Relocate and Expand East Airways
  • Redesign NYNJPHL East Corridor
  • Redistribute Traffic on New East Routes
  • East Airway Apply Traffic Flow Management Rules
  • Align TEB and MMU Departure Gates feeding EWR
    Departures
  • Change Altitude Restrictions
  • Create Continuous Decent Approach Procedures
  • All other Locations Apply Traffic Flow Management
    Rules

14
Stage 4 Full Airspace Integration
15
Next Steps
  • Continue to address and resolve legal and
    political challenges
  • Written Reevaluation with respect to new
    Information
  • Respond to GAO Recommendations Report due July
    31, 2008
  • Pending litigation Extension Granted for
    Briefing Schedule
  • Continue safety assessment of all changes
  • Facilitate an improved collaborative relationship
    with all stakeholders
  • Develop Airspace design activities with adjacent
    facilities
  • that enhance the benefits of integration
Write a Comment
User Comments (0)