Kennecott Utah Copper - PowerPoint PPT Presentation

1 / 41
About This Presentation
Title:

Kennecott Utah Copper

Description:

Title: Kennecott Utah Copper Author: Wayne Wride Last modified by: Gregg Le Blanc Created Date: 10/4/1999 9:35:27 PM Document presentation format – PowerPoint PPT presentation

Number of Views:163
Avg rating:3.0/5.0
Slides: 42
Provided by: WayneW151
Category:

less

Transcript and Presenter's Notes

Title: Kennecott Utah Copper


1
Kennecott Utah CoppersInformation System
  • A.E. Lamb, D.J. Sonntag, W.P. Wride
  • 2000 OSI Software Users Conference
  • April 2 - 5, 2000
  • San Francisco, California

2
Kennecotts Foundation for Excellence
3
KUC Information System
  • General Information
  • PI System
  • Uses

4
General Information
  • Historical (The Hill)
  • Current (The Pit)
  • KUC Process

5
The Hill General Information
6
General Information
  • Historical (The Hill)
  • Current (The Pit)
  • KUC Process

7
The Pit General Information
8
General Information
9
General Information
  • Historical (The Hill)
  • Current (The Pit)
  • KUC Process

10
KUC Process
General Information
11
The Bingham Canyon Mine
KUC Process
  • Move 300,000 tons/day
  • Data collected-
  • truck movements
  • tons hauled per truck
  • crusher parameters

12
The Concentrators
KUC Process
  • Copperton and North Concentrators
  • 172,000 tons of ore processed/day
  • Data collected (14,000 points)-
  • mill speed and power
  • throughput and flowrates
  • online x-ray assays

13
The Smelter
KUC Process
  • Flash smelting, flash converting technology
  • 720-lb, 99.5 Cu anodes
  • Data collected (13,000 points)-
  • furnace temperatures
  • flowrates
  • assays

14
The Refinery
KUC Process
  • Anode Cu cathode Cu in 10 days
  • Cathodes are 99.99 Cu
  • Data collected (1700 points)-
  • electrolytic tank conductivity
  • anodes residence time
  • equipment status

15
KUC Information System
  • General Information
  • PI System
  • Uses

16
PI System
  • Instrument Interface
  • Compression Algorithm
  • User Interface
  • Plants Operating With PI

17
KUC Information System
  • General Information
  • PI System
  • Uses

18
Uses
  • Operations / Maintenance Troubleshooting
  • Process Optimization
  • Process Online Monitoring
  • Creating Production Reports
  • Maintenance Scheduling

19
Operations / Maintenance Troubleshooting
Uses
  • Unusual Caustic Usage
  • Oxidation-Reduction Potential (ORP) Control
    Problem

20
Caustic Valve Operation
Uses
21
Operations / Maintenance Troubleshooting
Uses
  • Unusual Caustic Usage
  • Oxidation-Reduction Potential (ORP) Control
    Problem

22
Faulty Reagent Valve
Uses
23
Working Reagent Valve
Uses
24
Uses
  • Operations / Maintenance Troubleshooting
  • Process Optimization
  • Process Online Monitoring
  • Creating Production Reports
  • Maintenance Scheduling

25
Process Optimization
Uses
  • Monitoring Boiler Pressure Increase
  • Furnace Process Control Issues

26
Holman Boiler Warm-up Curve
Uses
27
Process Optimization
Uses
  • Monitoring Boiler Pressure Increase
  • Furnace Process Control Issues

28
FSF/FCF Process Control Issues
Uses
  • Sampling and Process Data Availability
  • Lack of Feedback Control on both furnaces
  • Concentrate Matte Grade Variations to the
    FSF/FCF

29
Furnace Interface Logic
Uses
30
Uses
  • Operations / Maintenance Troubleshooting
  • Process Optimization
  • Process Online Monitoring
  • Creating Production Reports
  • Maintenance Scheduling

31
Process Online Monitoring
Uses
  • Smelter Hot Metals Operation
  • Powerhouse Operating Parameters

32
Process Online Monitoring
Uses
  • Smelter Hot Metals Operation
  • Powerhouse Operating Parameters

33
Powerhouse Operating Parameters
Uses
34
Uses
  • Operations / Maintenance Troubleshooting
  • Process Optimization
  • Process Online Monitoring
  • Creating Production Reports
  • Maintenance Scheduling

35
Creating Production Reports
Uses
  • Efficient Use of Manpower
  • Timely Decision Making

36
Uses
37
Creating Production Reports
Uses
  • Efficient Use of Manpower
  • Timely Decision Making

38
Uses
  • Operations / Maintenance Troubleshooting
  • Process Optimization
  • Process Online Monitoring
  • Creating Production Reports
  • Maintenance Scheduling

39
KUC Information System
  • General Information
  • PI System
  • Uses

40
  • Kennecotts Foundation for the Future

41
Questions?
Write a Comment
User Comments (0)
About PowerShow.com