SAFETEA: Transportation System Management, Operations and ITS - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

SAFETEA: Transportation System Management, Operations and ITS

Description:

Title: PowerPoint Presentation Author: jharding Last modified by: jharding Created Date: 1/29/2003 4:10:24 PM Document presentation format: On-screen Show – PowerPoint PPT presentation

Number of Views:123
Avg rating:3.0/5.0
Slides: 19
Provided by: Jhar63
Learn more at: https://ops.fhwa.dot.gov
Category:

less

Transcript and Presenter's Notes

Title: SAFETEA: Transportation System Management, Operations and ITS


1
SAFETEA Transportation System Management,
Operations and ITS
  • Jeffrey F. Paniati
  • Associate Administrator, Office of Operations
  • Federal Highway Administration

2
Transportation System Management
OperationsImprove reliability, safety, and
security through 21st Century Operations using
21st Century Technology
  • 21st Century Operations
  • Proactive
  • Customer view
  • Regional system base
  • 24/7
  • Performance based
  • Real-time information
  • 21st Century Technology
  • Advanced Signal Control
  • Ramp metering
  • Work Zone Management
  • Traffic Incident Management
  • Real-Time Transportation (traveler) Information
  • Emergency/Evacuation Management
  • Freight Management
  • More

3
Program Objectives
  • Accelerate deployment of 21st Century technology
    (ITS)
  • Support creation of institutional arrangements
    necessary for effective Operations
  • Investigate and develop the next generation of
    operational capabilities
  • Increase transportation communitys use of
    effective operational strategies and techniques

4
Reauthorization Objectives
  • Establish a specific foundation for
    Transportation Systems Management Operations
    (TSMO)
  • Implement programs and provisions that will
    assist entities enhance their systems
    performance
  • Institutionalize Freight Management increase
    Freight Management investment
  • Continue strong ITS program

5
Reauthorization Overview
  • Operations Reauthorization Provisions
  • ITS Reauthorization Provisions
  • Freight Reauthorization Provisions

6
Operations ReauthorizationProvisions
  • Establish a specific foundation for
    Transportation Systems Management and Operations
    (TSMO)
  • Section 1701 Transportation Systems Management
    and Operations
  • Establishes TSMO and differentiates from
    construction
  • Section 6001, subsection 5203 Metropolitan
    Planning
  • Incorporates consideration of TSMO improvements
    through Planning Factors and Transportation Plan
    requirements
  • Section 5201 Research, Technology, and Education
  • Includes TSMO as a specific research area

7
Operations ReauthorizationProvisions
  • Promote Regional Coordination
  • Section 1701 Transportation Systems Management
    and Operations
  • Defines and encourages regional operations
    collaboration and coordination
  • Regional operations collaboration and
    coordination activities eligible for Surface
    Transportation Program funds
  • Increases procurement flexibility for TSMO
  • Section 1503 State Planning and Research
  • TSMO planning and regional operations
    collaboration and coordination activities
    eligible for State Planning and Research Funding

8
Operations ReauthorizationProvisions
  • Increase Availability of Real-time Information
  • Section 1702 Real-Time System Management
    Information Program
  • Encourages establishment of Real-time Information
    Systems to provides capabilities to monitor
    real-time travel conditions on major highways
  • Promotes dissemination of information among
    government entities and the traveling public
  • Requires DOT to establish data exchange formats
    within one year
  • Requires each State to establish a Statewide
    incident reporting system within two years (some
    already exist)
  • Requires information systems to be explicitly
    addressed in regional ITS architectures
  • Program activities eligible under NHS, STP, and
    SPR

9
Operations ReauthorizationProvisions
  • Improve Performance of Existing System
  • Sec. 1201 Infrastructure Performance and
    Maintenance Program (IPAM)
  • Establish program to preserve existing highway
    facilities or alleviate traffic chokepoints
  • Only projects for system preservation, preventive
    maintenance, or operational improvements are
    eligible
  • Provides funds to implement eligible projects
    that will also produce near-term performance
    economic benefits
  • Provides 1 billion/FY apportioned using STP
    formula
  • Funding not utilized within 6 months to be
    redistributed.

10
Operations ReauthorizationProvisions
  • Improve Performance of Existing System
  • Section 1610 Use of HOV Lanes
  • Allows States to exempt low emission/energy
    efficient, and transit vehicles from HOV
    occupancy requirements
  • Allows tolling of non-HOV vehicles using HOV
    lanes (with Sec. 1615)
  • States exercising HOV exemptions must institute
    participation and monitoring programs, and commit
    to maintaining facility performance

11
ITS ReauthorizationProvisions
  • Foster RD, but Place Greater Emphasis on using
    ITS to Improve Performance and Operation of the
    Transportation System
  • Represent Natural Evolution of Program
  • ISTEA RD
  • TEA-21 - RD and Deployment Incentives
  • SAFETEA RD and Formula-based Deployment

12
ITS Reauthorization Provisions
  • Improve Performance of Existing System
  • Sec. 1703 ITS Performance Incentive program
  • Establishes formula-based incentive program to
    encourage
  • deployment of ITS to improve system
    performance
  • Formula initially NHS-based transitioning to
    performance
  • based
  • Replaces ITS Integration Program (which has
    been
  • historically fully earmarked)
  • 135 million/year

13
ITS Reauthorization Provisions
  • Complete CVISN
  • - Sec. 1704 Commercial Vehicle Information
  • Systems and Networks Development (CVISN)
  • Establishes program to fund nationwide
    deployment
  • of CVISN
  • Replaces Commercial Vehicle Infrastructure
  • Program (which has been historically fully
    earmarked)
  • 25 million/year
  • Two types of grants
  • - core development 2.5 million/state
  • - expanded deployment 1 million/state

14
ITS Reauthorization Provisions
  • Continue Strong ITS RD Program
  • - Sec. 5505 ITS Research Development
  • Continues a comprehensive ITS RD program
  • 121 million/year (726 million in SAFETEA is 20
    increase from TEA-21)
  • Minor Modifications Made to Reflect Program
    Priorities/Evolution
  • Supports Mobility/Productivity, Safety, Security
    and Integration

15
Freight ReauthorizationProvisions
  • Institutionalize Freight Considerations
  • Increase Investment in Freight

16
Freight ReauthorizationProvisions
  • Institutionalization of Freight
  • Sec. 1205 Freight Transportation Gateways
    Freight Intermodal Connections
  • Program enables systematic improvements that
    facilitate freight transport into and thru
    gateways
  • State responsibilities
  • Integrate freight needs into project development
    process
  • Designate a freight transportation coordinator
  • Facilitate public and private coordination
  • Encourage implementation of innovative financing
    where appropriate
  • Update ID of STRANET NHS connectors within 3
    years
  • Sec.1505 Planning Capacity Building Initiative
  • Inclusion of Freight Professional Development
    Program into FHWAs Planning Capacity Building
    initiative
  • Sec. 1806 Multi-State Corridor Planning Program
  • Strengthens consideration of freight in
    Multi-State Corridor Planning Program (Sec. 1806)

17
Freight ReauthorizationProvisions
  • Freight Investment
  • Sec. 1205 Freight Transportation Gateways
    Freight Intermodal Connections and Sec 1304
    Transportation Infrastructure Finance and
    Innovations Act (TIFIA)
  • Freight Transportation Gateways
  • Expand STP eligibility for publicly-owned
    intermodal transfer facility projects (Sec. 1205)
  • Expand TIFIA eligibility for public and
    privately-owned intermodal transfer facility
    projects
  • NHS Freight Connectors (includes STRAHNET
    connectors)
  • Set aside (2 minimum)
  • Exemption Provision
  • Federal Share Payable (Sec 1205) 90 Federal
    share

18
Summary
Using reauthorization to create a path that will
bring about 21st Century Operations using 21st
Century Technology we have
  • Established a foundation for TSMO throughout the
    legislation.
  • Facilitated the creation of information and
    institutional arrangements necessary to support
    effective operations.
  • Brought a performance focus to the ITS Program.
  • Supported the development of the next generation
    of technology by continuing a strong ITS program.
  • Supported investment in freight gateways and
    connectors, and created an institutional focus on
    freight management.
Write a Comment
User Comments (0)
About PowerShow.com