Title: IRSE Seminar on 8th Jan
1IRSE Seminar on 8th Jan2010 New Delhi ERTMS
Level 1 and Level 2 Products Applications A.
Casazza V. Kumar
2Goal of Presentation
- Overview of Ansaldo STS
- Ansaldo ERTMS Applications
- Ansaldo ERTMS Level 2 Applications
- Ansaldo ERTMS Level 1 Applications
- Ansaldo ERTMS Products
2
3Ansaldo STS Worldwide Presence
- 4 200 Employees
- Present in 28 countries
Central Eastern Europe Employees
1430 Revenues 576 M
Western Northern Europe Employees
802 Revenues 154 M
Paris
Genoa
Pittsburgh
Americas Employees 1061 Revenues 145 M
Asia Pacific Employees 965 Revenues 94 M
Brisbane
4Ansaldo STS ERTMS applications
UK Cambrian Coast - lev. 2
Scandinavia STM Nordic
France LGV Est - lev. 2 Tournan - Marles en Brie
- lev. 1/2 Onboard - lev. 1/2 Onboard - lev. 2
Germany Saarbrücken - Mannheim Lev. 2
Belgium - Netherlands Onboard lev. 1/2
Czech Republic Porícany - Kolín lev. 2
Spain - France Figueres - Perpignan - lev. 1/2
Austria Hungary Vienna - Budapest lev. 1
China Zhengzhou-Xian - lev. 2 Shijiazhuang -
Taiyuan lev. 1 Onboard - lev. 1-2
Spain Madrid - Llerida - lev. 1/2 Onboard lev.
1/2
India Chennai - Gummudipundi - lev. 1 Delhi -
Agra - lev. 1
Italy Turin - Milan HSL, lev. 2 Milano - Bologna
HSL, lev. 2 SCMT (STM) projects Onboard - lev.
1 Onboard - lev. 2
Greece Onboard - lev. 1
Romania Campina Predeal lev. 1
5Italian High-Speed Network Case Study
ERTMS Level 2
Km CBI (Stations) RBC Control Centre Links
Roma- Napoli 211 18 3 1 4
Torino-Novara 125 10 2 1 3
Novara-Milano 125 4 2 1 3
Milano-Bologna 185 19 3 1 7
Bologna-Firenze 81 8 1 1 1
6TVM ERTMS Level 2
7ERTMS PILOT LINE IN UK CAMBRIAN Line
Main characteristics of the line
- Wayside
- Interlocking (SEI)
- RBC
- MTOR
- Balises (380)
- ERTMS level 2 pilot line
- Passengers/Freight line 215 km
- On Board
- ERTMS level 2 on board equipment
- for 28 freight locomotives (class
- 158 class 37)
ERTMS Architecture
ERTMS
8ERTMS LINE IN SWEDEN HAPARANDABANAN Line (ESTER)
INTERLOCKING AND TRAIN CONTROL SYSTEM RENEWAL
Main characteristics of the line
- Wayside
- 28 MTOR Object controllers in 11 locations
- 211 fixed balises
- 142 Track circuits
- 1 RBC
- 1 SEI
- ERTMS level 2 pilot line
- Passengers/Freight line 150 km single-track
line, - Eight (8) stations and nine (9) level crossings
in all on the part being equipped with the ERTMS
ESTER system.
9POS Nord Line
- POS Nord Paris-Ostfrankreich-Südwestdeutschland
- Scope of the Work to equip with ERTMS Level 1 e
Level 2 the SaarbrückenLudwigshafen/Mannheim
Line (about 125 km), located in the
western-center part of Germany - Customer Deutsche Bahn Aktiengesellschaft
9
10Czech Republic Pilot Project
- General
- Porícany - Kolìn pilot section 22 km long
- ERTMS/ETCS Level 2 system, according to the
UNISIG SRS version 2.3.0 (Subset-108 version
1.0.0) - Use of Velim Ring for preliminary tests
11Sirt-Ras Ajdir Al Hisha-Sabha Lybia Main
Features
- Type of System ERTMS/ETCS Level 1 2
- ERTMS/ETCS Baseline UNISIG 2.3.0
- Customer Libyan Railroads
- Infrastructures Newly built
- Length 1500 km
- Backup signalling systems No
- Max speed 250 km/h
- Mixed traffic tbd
- Light signals No - Only fixed signals in the
stations - Headway Few trains/hour
12ZhengXi Line China Main Features
- Type of System ERTMS/ETCS Level 2
- ERTMS/ETCS Baseline UNISIG 2.3.0
- Customer MOR (Chinese Railways)
- Infrastructures Newly built
- Length 500 km
- Backup signalling systems CTCS2
- Max speed 350 km/h
- Mixed traffic Yes
- Light signals No - Only fixed signals (Marker
Boards) along the line and in the stations - Headway not provided
13ZhengXi Line China Main functional requirements
- Management of mixed traffic on the same line
- Trains equipped ETCS Level 2
- Trains equipped CTCS-2
- Onboard integration ETCS and CTCS-2
- The CTCS-2 system is integrated as a national STM
- Centralized management of the TSR for both
systems ETCS and CTCS-2 - RBC manages the speed restrictions (TSR)
14Work schedule
ZhengXi Line China Schedule
- PHASE 1
- Commencement of Works 01/07/2008
- Delivery in China January 2009
- Test
- Laboratory April-October 2009
- Line October-December 2009
- Trial run January 2010
- Commercial run 1 February 2010
- PHASE 2 (Additional functionalities)
15Bogazkopru-Yenice Mersin-Toprakkale Line
Turkey Main Features
- Type of System ERTMS/ETCS Level 1
- ERTMS/ETCS Baseline UNISIG 2.3.0
- Customer TCDD
- Infrastructures existing
- Length 440 km
- Backup signalling systems No
- Max speed 160 km/h
- Mixed traffic Yes
- Light signals Yes
- Headway 30100 trains/day
Key
16CampinaPredeal Line Romania Main features
- Type of System ERTMS/ETCS Level 1
- ERTMS/ETCS Baseline UNISIG 2.3.0
- Customer CFR
- Infrastructures existing
- Length 48 km
- Backup signalling systems INDUSI I60
- Max speed 120 km/h
- Mixed traffic Yes
- Light signals Yes
- Headway tbd
17SCMT Sistema Controllo Marcia Treno Italy
- Wayside more than 3.600 km equipped lines with
300 stations (33.000 Eurobalise and 3.400 LEU) - node of Firenze 120 stations
- node of Napoli 72 stations
- node of Torino 50 stations
- node of Verona 14 stations
SCMT ERTMS-1 technology with use of Packet 44
18ETCS-1 Spain Madrid/Lerida
- 440 km - 4 stations -
- 3000 balises (amongst them 1100 switchables)
- 365 LEU modules
- 1000 CDV / 5 RBC
- In commercial service with SEI ERTMS Level 1
since May 2006
19ETCS Lev.1 Some references
- BDŽ (Bulgaria) Sofia Burgas
- Supply of
- BTM and Antennas (184)
- Eurobalises (1.078)
-
- MÁV (Hungary) Budapest-Kelenföld-Kimle
- Supply of
- BTM and Antennas (20)
- Eurobalises (1.800)
-
20ETCS-1
ETCS Lev.1 References
Northern Indian Railways
- Supplier (for the Lev.1 system) of
- BTM and Antennas (35)
- Compact LEU (290)
- Eurobalises (520)
- EVC (35)
21ETCS-1
ETCS Lev.1 References
Southern Indian Railways
- Supplier (for the Lev.1 system) of
- BTM and Antennas (84)
- Compact LEU (108)
- Eurobalises (520)
- EVC (84)
22TPWS -India
- New Delhi to Agra (North)
- one of the busiest trunk routes in India
- Chennai Beach to Gummidipundi (South)
- one of the busiest suburban routes in India
- Benefits
- Gradual implementation as an overlay to
existing - infrastructure.
- Qualitative and quantitative safety improvement
- Flexible to adopt to specific customer
requirements - Increase train speed shorter train headways
- Reduction of unit and direct operating costs
- Eliminating human error leading to signals
passed at - Danger and over speeding.
- Stimulate the implementation of Modern,
proactive and - systematic safety.
- Common system concepts with high safety
standards - (CENELEC)
23On-board architecture (TPWS)
ERTMS DMI
PSTI RACK
BTM
Speed sensors
Train Interface
EUROBALISE Antenna
24Eurobalises
- ERTMS EUROSIG EUROBALISE Compliance
- FSK transmission, 565.4 KHz
- 1023 and 341 - bit telegrams
- Fixed or variable data balises
- Programmable through C Interface
- Suitable for SIL 4 systems
- Class A Balise
- Length 523 mm
- Width 403 mm
- Height 40 mm
- Weight lt 10kg
- Temperature Range - 40 C / 70 C
25Reduced Size Eurobalise
- Length 440 mm
- Width 262 mm
- Height 42 mm
- Weight lt 5 kg
- Temperature Range - 40 / 70C
- Designed for railway and metro lines
- Compatible with the majority supports used in
ERTMS and KER applications - Available with different type of connector (screw
or bayonet)
26Signal Encoder
27Signal Encoder
Basic Version insideresin cabinet Width 300
mm Height 520 mm Depth 330 mm Weight 12 kg
() () fully equipped device plus external case
28Signal Encoder
Basic Version insidemetallic cabinet Width
460 mm Height 700 mm Depth 450 mm Weight
45 kg () () fully equipped device plus showed
external case (double layer, IP65)
29Signal Encoder
- I/O capability depending on configuration
(contd) - Basic version High number of input
- Up to 23 inputs
- Up to 4 outputs (all EUROBALISE or max 3 LOOMO)
30Signal Encoder
- I/O capability depending on configuration
- Extended version (maximum configuration)
- Up to 30 inputs
- Up to 8 outputs (all EUROBALISE or max 3 LOOMO)
31Signal Encoder
- I/O capability depending on configuration
(contd) - Basic version High number of output
- Up to 16 inputs
- Up to 8 outputs (all EUROBALISE or max 3 LOOMO)
32RBC Product (Example of 3 RBC Milano-Bologna)
3 Cabinets (TMRCC) 1 Cabinet ART
1 Operator Interface Cabinet
DM MI Interface
HMI Interface
33On-board ERTMS ATP deliveries
- References over the past 2 years
- Country / Customer Equipment
Quantity - Spain (GIF/ADIF) ERTMS levels 1 2 12
- (CAF) ERTMS levels 1 2 12 (CAF) ERTMS
levels 1 2 29 - (Alstom) ERTMS levels 1 2 16
- Czech Republic ERTMS level 2 STM LS90 4
- India ERTMS level 1 130
- (Northern / Southern Railways)
- Netherlands (Ansaldo Breda) Eurocab ETCS
2 38 - (V2.3.0)
- Korea (Rotem) Eurocab ETCS 1 (Loco 8200) 28
34- References over the past 2 years
- Country / Customer Equipment
Quantity - France (SNCF) Bi standard for HSL 800
- ERTMS level 2 TVM
- Bi standard for POS trains 32
- ERTMS level 2 TVM
- Bi standard for Thalys 60
- China (MOR) ATP for EMU Trains 120
based on China CTCS standard - (linked with ERTMS standard)
- Korea (Rotem) Bi standard for KTX 20
- ETCS / TVM 430
- Siemens (Velaro) ERTMS-2 30
35- EUROCAB product description
- Components (System integration)
EUROCAB
MMI 1
MMI 2
O
R
F
Movement Direction Switch
ON
OF
Power Supply Cab Main Switch
GSM-R Radio Modem
ON
OF
Wheel Sensors
Isolation
Doppler Radar
EVC
Maintenance
STM
BTM
JRU Downloading
Eurobalises
Radio Infill