1Petroleum Equipment Institute RP
200-13 Recommended Practices for Installation of
Aboveground Storage Systems for Motor Vehicle
Fueling
2 3RP 200-13 Introduction Scope Includes
aboveground, stationary, shop-fabricated tanks.
Does not include field-fabricated storage tanks
or storage systems for liquefied petroleum gases,
liquefied natural gases or compressed natural
gases.
4RP 200-13 1. Introduction Emphasizes the
Importance of Using Competent Installers
5RP 200-13 2. Site Planning
Tank Location Tank Configurations Property Lines
and Bldgs Tank Spacing Requirements Bases and
Foundations Retail Service Stations Commercial
Fleet Facilities Marinas (Change)
Product Deliveries Traffic Flow SPCC
Plan Electronic Equipment Physical
Protection Fire Protection Utilities Emergency
Planning
Change Added See RP1000
6RP 200-13 3. Foundations, Support and Anchorage
General Soil Analysis Foundation
Design Excavation Base Course
Vertical Tank Bases Horizontal Tank
Saddles Reinforced Concrete Slabs Anchoring
7RP 200-13 4. Dikes
Purpose Dike Capacity Dike Construction Impervious
Barrier
Dike Penetraions Access Drainage
Control Oil/Water Separator
8RP 200-13 5. Vaults and Special Enclosures
General Vault Design Vault Construction Venting Le
ak Detection
Liquid Recovery Vault Ventilation Collision
Protection Electrical Installation Special
Enclosures
9RP 200-13 6. Tanks
General Standards (Changes) Tank Openings
Preinstallation Inspection Material
Handling Air-and-Soap Test
Changes Deleted UL2244 (Tank System) Added STI
F921 (Integral Secondary Containment) Added STI
F941 (Fireguard)
10RP 200-13 7. Pumps and Valves
Materials and Design Pumping Systems Fire/Emergenc
y Valves Block Valves
Anti-Siphon Valves Check Valves Pressure Relief
Valves
11RP 200-13 8. Tank Filling, Gauging, Dispensing
and Venting
Materials and Design Tank Filling Dispensing
Systems
Gauging Systems Tank Venting
12RP 200-13 9. Aboveground Piping and Fittings
General Requirements AST Piping Materials Piping
Practices Piping Layout
Fittings for AST Piping Testing AST Piping Piping
Corrosion Protection
13RP 200-13 10. Underground Piping and Fittings
General Requirements Piping Materials Piping
Practices Layout and Trenches Backfill and
Compaction Fittings
Corrosion Protection Fiberglass Piping Flexible
Piping Containment Sumps Testing Primary
Piping Testing Secondary Piping
14RP 200-13 11. Corrosion Protection
General Applicability Coatings Protection of
Buried Components
Galvanic CP Impressed-Current Sys Wiring and
Electrical Inspection and Testing
15RP 200-13 12. Environmental Protection
General Release Detection Vapor Recovery
16RP 200-13 13. Electrical Installation
General Requirements Classifications Electrical
Equipment Emergency Shutoff
Wiring Intrinsically Safe Grounding and
Bonding Ensuring Uninterrupted Power
17RP 200-13 14. Testing and Inspection
General Test Results Other Testing
18RP 200-13 15. Documentation, Maintenance and
Training
As-Built Drawings Component Documentation Schedule
d Maintenance Training
19RP 200-13 Appendix A Size Calculations for Dikes
20RP 200-13 Appendix B Venting
21RP 200-13 Appendix C Code Requirements for ASTs
at Motor Vehicle Fuel Dispensing Facilities
22RP 200-13 Appendix C Code Requirements NFPA
30A 2012 (2008) IFC 2012 (2006)
23RP 200-13 Appendix D Publication Reference