1
Petroleum Equipment Institute RP
200-13 Recommended Practices for Installation of
Aboveground Storage Systems for Motor Vehicle
Fueling

2

3
RP 200-13 Introduction Scope Includes
aboveground, stationary, shop-fabricated tanks.
Does not include field-fabricated storage tanks
or storage systems for liquefied petroleum gases,
liquefied natural gases or compressed natural
gases.

4
RP 200-13 1. Introduction Emphasizes the
Importance of Using Competent Installers

5
RP 200-13 2. Site Planning

Tank Location Tank Configurations Property Lines
and Bldgs Tank Spacing Requirements Bases and
Foundations Retail Service Stations Commercial
Fleet Facilities Marinas (Change)
Product Deliveries Traffic Flow SPCC
Plan Electronic Equipment Physical
Protection Fire Protection Utilities Emergency
Planning
Change Added See RP1000
6
RP 200-13 3. Foundations, Support and Anchorage

General Soil Analysis Foundation
Design Excavation Base Course
Vertical Tank Bases Horizontal Tank
Saddles Reinforced Concrete Slabs Anchoring
7
RP 200-13 4. Dikes

Purpose Dike Capacity Dike Construction Impervious
Barrier
Dike Penetraions Access Drainage
Control Oil/Water Separator
8
RP 200-13 5. Vaults and Special Enclosures

General Vault Design Vault Construction Venting Le
ak Detection
Liquid Recovery Vault Ventilation Collision
Protection Electrical Installation Special
Enclosures
9
RP 200-13 6. Tanks

General Standards (Changes) Tank Openings
Preinstallation Inspection Material
Handling Air-and-Soap Test
Changes Deleted UL2244 (Tank System) Added STI
F921 (Integral Secondary Containment) Added STI
F941 (Fireguard)
10
RP 200-13 7. Pumps and Valves

Materials and Design Pumping Systems Fire/Emergenc
y Valves Block Valves
Anti-Siphon Valves Check Valves Pressure Relief
Valves
11
RP 200-13 8. Tank Filling, Gauging, Dispensing
and Venting

Materials and Design Tank Filling Dispensing
Systems
Gauging Systems Tank Venting
12
RP 200-13 9. Aboveground Piping and Fittings

General Requirements AST Piping Materials Piping
Practices Piping Layout
Fittings for AST Piping Testing AST Piping Piping
Corrosion Protection
13
RP 200-13 10. Underground Piping and Fittings

General Requirements Piping Materials Piping
Practices Layout and Trenches Backfill and
Compaction Fittings
Corrosion Protection Fiberglass Piping Flexible
Piping Containment Sumps Testing Primary
Piping Testing Secondary Piping
14
RP 200-13 11. Corrosion Protection

General Applicability Coatings Protection of
Buried Components
Galvanic CP Impressed-Current Sys Wiring and
Electrical Inspection and Testing
15
RP 200-13 12. Environmental Protection

General Release Detection Vapor Recovery
16
RP 200-13 13. Electrical Installation

General Requirements Classifications Electrical
Equipment Emergency Shutoff
Wiring Intrinsically Safe Grounding and
Bonding Ensuring Uninterrupted Power
17
RP 200-13 14. Testing and Inspection

General Test Results Other Testing
18
RP 200-13 15. Documentation, Maintenance and
Training

As-Built Drawings Component Documentation Schedule
d Maintenance Training
19
RP 200-13 Appendix A Size Calculations for Dikes

20
RP 200-13 Appendix B Venting

21
RP 200-13 Appendix C Code Requirements for ASTs
at Motor Vehicle Fuel Dispensing Facilities

22
RP 200-13 Appendix C Code Requirements NFPA
30A 2012 (2008) IFC 2012 (2006)

23
RP 200-13 Appendix D Publication Reference
Write a Comment