Corporate Presentation - PowerPoint PPT Presentation

1 / 29
About This Presentation
Title:

Corporate Presentation

Description:

High Speed Elevator * * / , , ... – PowerPoint PPT presentation

Number of Views:107
Avg rating:3.0/5.0
Slides: 30
Provided by: Nilsva
Category:

less

Transcript and Presenter's Notes

Title: Corporate Presentation


1
High Speed Elevator ?????
2
High Speed ???? Double Decker????
SF 1000 Machine Designed Built by ThyssenKrupp
Elevator for fastest elevator in
China ???????????????????????? Max. Speed 15 m/s
(under the capacity of 4400kg, travel height of
560m) ????15?/?(???4400kg,????560?)
3
High Speed ???? Premium Ride Quality ???????
Aerodynamic Measures ??????????
Car dome???
Counterweight??
Top cover??
Bottom cover??
4
High Speed ???? Premium Ride Quality ???????
Active Roller Guide ???????
5
High Rise ???? Rope Sway ?????
Determine resonant zones ?????? Increase mass of
compensator ?????? Apply active damping to
compensator ??????????
6
Stack Effect ????
ThyssenKrupp Elevator take thorough consideration
on the stack effect which happens to high rise
buildings caused by difference in temperature or
moisture of in and out air. ??????????????????????
???????????????
7
Monitoring Management ????? Campus View
Online DEMO ????
http//www.swiftcec.com/resources/demos/campusview
/Site/campusview-demo.html
8
Energy Saving ?? Regenerative Inverter ???????
Regeneration occurs when an empty or lightly
loaded car runs up. ???????????,????? The
counterweight at the top of the shaft has
potential energy which is released as it moves
down. ??????,???????????? This potential energy
is converted to kinetic energy and helps turn the
PM gearless machine causing it to act as a
generator. ???????,??????????,?????
9


Jump Lift (3500kg, 2.0m/s)
Temporary Lift Serving lower shaft zone ??????
Temporary Lift Serving total shaft zone ???????
Hoistable temporary machine room ??????? (1)
Double platform???? - for control (2)
???(2) - for machine suspension(3) ?????(3)
Retractable platform support (4)
???????(4) Use of original guide rails and
landing doors (5) ????????(5) Temporary car
suspension 21 (6) ???????? (6) Special
device for flexible rope support - no rope
change during temporary use of lift(7)
?????????????? ?????????????? (7)
2
1

3
4
7
6
5
7


10
Escalators ???? ??????? Meet the demand of
capacity
???? Pedestrian trials
???Transporting type
???Commercial type
11
ThyssenKrupp Elevator ???????Research Project
????????(TWIN)
  • Two independent cars in one shaft ???????????
  • Save the building space, reduce waiting time and
    increase the capacity.??????, ??????, ?????
  • ? Buildings floors can exceed 100.???????100?

Counterweight ??
TWIN panorama elevator TWIN????
Landing floor selection system????????
12
Our References ????
13
Reference Project ???? China ??
World Financial Center, Shanghai????????
  • Located in Lu Jia Zui Finance Trade Zone,
  • Pudong, Shanghai, beside Jinmao Tower
  • ??????????????,??????
  • Building type Complex
  • ????????
  • Building height 492m
  • ????492?
  • 44 elevators
  • 44???
  • Maximum speed 10.0m/s
  • ????10.0?/?

14
????? Landmark ProjectFreedom Tower, New York
???, ???
Freedom Tower, New York ???,???
Former site of World Trade Center ???????
  • Building height 542m
  • ????542?
  • 105 floors
  • 105 ?
  • 71 elevators (Max speed 9m/s)
  • 71??? (????9 ?/?)
  • 9 escalators
  • 9 ?????
  • Long-term maintenance contract
  • ??????
  • Completed date December, 2011
  • ????2011?12?

15
Reference Project ???? China ??
Baoli Water City, Foshan ??????
  • With a total construction area of about
    600,000m2, the project is a top construction
    complex, covering residential, commercial, hotel,
    office and leisure facilities. The project
    includes the first high-rise mansion and the
    first super five-star hotel in Foshan
  • ?????????60????,??????,???????????????,???????????
    ??,????????????????????????????????
  • Building type Complex ????????
  • Building height 160m ????160?
  • 46 escalators, 2 moving walks and 61 elevators
    46???,2???????61???

16
Reference Project ???? China ??
International Trade Building, Taiyuan ????????
  • Grade A office building in Taiyuan
  • ??A????
  • Building type Office building
  • ???????
  • Building height 166m
  • ????166?
  • 17 Elevators
  • 17???

17
Reference Project ???? China ??
Information Building, Xian ??????
  • The tallest building of North-West China
  • ????????
  • Grade A office building under construction
  • ????A????
  • Building type Office building
  • ???????
  • Building height 192m
  • ????192?

18
Reference Project ???? China ??
Poly Center, Guangzhou ??????
  • Building type Office building
  • ???????
  • Building height 165m
  • ????165?
  • 36 elevators
  • 36???

19
Reference Project ???? China ??
Jiangsu Telecom Tower, Nanjing ????????
  • Office building of Jiangsu province Telecom Group
  • ??????????
  • Building type Office building
  • ???????
  • Building height 180m
  • ????180?

20
Reference Project ???? China ??
General Broadcasting and TV Station,
Jiangsu ??????????
  • A civilization landmark in the city of Nanjing
    ????????
  • Building type Complex
  • ????????
  • Building height 168m
  • ????168?
  • 17 elevators
  • 17???
  • Maximum elevator speed 6m/s
  • ??????6?/?

21
Reference Project ???? China??
Beijing Capital International Airport ????????
  • For new T3 terminal?T3???
  • Building type Government Building
  • ????????
  • Building height 45m
  • ????45?
  • Number of units 90 moving walks, 16
    elevators, 10 escalators
  • ??90??????,16????10???
  • Other information????
  • Chinas biggest airport with planned yearly
    passenger handling capacity of 60 million
    ???????,??????????6000??

22
Reference Project ???? China ??
Beijing Olympic Park, Beijing ????????
  • ??????????
  • Olympic National Conference Centre
  • Building type Governmental building
  • ????????
  • 50 Elevators and 16 Escalators
  • 50????16???

23
Reference Project ???? Europe ??
TWIN FTM (Federation Tower Moscow),
Russia. ??????????
  • Tower A 11 TWIN Systems 34 / 46 stops.
    (Total of 34 elevators)
  • A?11????34/46?,??34????
  • Tower B 11 TWIN Systems 16 / 29 stops.
    (Total of 17 elevators)
  • B?11????,16/29?,??17????
  • Speeds upper cars 6.0 m/s and 7.0 m/s,
  • lower cars 4.0 m/s and 6.0
    m/s.
  • ????? 6.0?/??7.0?/?
  • ???4.0?/??6.0?/?
  • Building height Tower A 350 m, 93 Floors
  • Tower B 250 m,
    63 Floors
  • ????A?350?,93?
  • B?250?,63?

24
TWIN Reference project. ???????? University
Stuttgart, Germany. ????????
Elevator WorldProject of the Year 2004
??1?TWIN??1 TWIN system in operation.
???? 2?/? Speed upper car 2 m/s, ??2?/?
lower car 2 m/s
????44.5?,11??Building height 44.5 m, 11 stops.
???? 1000?? Nominal load 1,000 kg.
??????????Modernization projecthigher handling
capacity.
25
TWIN. Reference project. ThyssenKrupp AG,
Düsseldorf, Germany.
?????????
??2?TWIN?? 2 TWIN systems in operation.
???? 4?/? Speed upper car 4 m/s,
??2.5?/? lower car 2.5
m/s.
?????94?,22?? Building height 94 m, 22 stops.
????1350?? Nominal load 1,350 kg.
???? Modernization project
6??????????8??? before modernization 8 shafts
now 6 shafts.
26
TWIN. Reference project. BMW head office Munich,
Germany. ????????????
4?TWIN?? 4 TWIN systems.
????4?/? Speed upper car 4 m/s ??2.5?/?
lower car 2.5 m/s.
????101?,23?? Building height 101 m, 23 stops.
????1425?? Nominal load 1,425 kg.
??????????,2006??? Modernization project higher
handling capacity, 2 of 8 existing shafts can be
used a one fire fighting elevator completion in
2006.
27
TWIN Reference project. Maintriangel Frankfurt
a.M., Germany. ??????????
2???TWIN??????? 2 scenic TWIN outriders inside
the atrium.
????2.5?/? Speed upper car 2.5 m/s,
??2.5?/? lower car 2.5 m/s
????60?,9?? Building height 60 m, 9 stops.
????1350?? Nominal load 1,350 kg.
2006???? New building project completion at the
beginning of 2006.
28
TWIN Reference project. Trumpf Technology Center
Seoul DMC, Korea ????DMC , ??, ??
1?TWIN?? 1 TWIN system
????2.5?/? Speed upper car 2.5 m/s, ??2.0?/?
lower car 2.0 m/s
????17?,16?? Building height 17 floors, 16 stops.
????1600?? Nominal load 1,600 kg.
2006???? New building project completion
October 2006.
29
TWIN Reference project. Oceanic-Center Valencia,
Spain. ???????????
1?TWIN?? 1 TWIN system.
????2.5?/? Speed upper car 2.5 m/s ??2.5?/?
lower car 2.5 m/s
?????99.6?,22?? Building height 99.60 m, 22
stops.
??1600?? Nominal load 1,600 kg.
2006??? New building project completion in 2006.
Write a Comment
User Comments (0)
About PowerShow.com