Attivita - PowerPoint PPT Presentation

About This Presentation
Title:

Attivita

Description:

Title: Muon PRS Preparation Document presentation format: Presentazione su schermo Company: Norbert Neumeister Other titles: Times New Roman Arial Zapf Dingbats ... – PowerPoint PPT presentation

Number of Views:282
Avg rating:3.0/5.0
Slides: 26
Provided by: pdInfnI
Category:
Tags: attivita | field | lepton

less

Transcript and Presenter's Notes

Title: Attivita


1
Attivita di softwareanalisi fisica a Padova
  • U. Gasparini, Padova, 4/9/06

2
Agenda
-  CSA06 (Computing -Software-Analysis
challenge 2006 previsto in autunno)
prototipi da sviluppare, nostro
coinvolgimento - analisi dati magnet test
(possibili analisi comuni Tracker/mu sui
dati dalla DAQ globale?) - Organizzazione
ambiente di lavoro comune risorse hardware
software - analisi di 'prima fisica' a LHC -
preparazione per LHC startup workshop
(prossima CMS week)
3
CSA06 scopo/definizione
E il primo test globale di ricostruzione/analisi
nel framework finale (sia sw che infrastruttura
di computing) di CMS (LHC-like)
D.Acosta, CSA meeting 2/8/06
vedi dopo
4
CSA06
More info (status, data handling/ organization,
various technical details, meetings
agenda/presentations)
Twiki page
5
CSA06 overall expressions of interests
D.Acosta 23/8
6
CSA06 data samples
Pre-challenge phase well advanced preparation of
datasamples (up to digis) almost finalized
Minimum bias (25M events, 081) t-tbar
(5M events, all decay channels, 082)
Z-gtmumu- (2M events, 082) W-gte nu
(4M events, 082) events selected in narrow range
to illuminate 2 SMs
Electroweak soup (5M events, 082) 2.6M W-gtl nu
(xsec reduced 1/5)
2.2M Drell-Yan (massgt15 GeV)
0.1M H-gtWW (xsec increased 40X),
all 3 charged
lepton generations Soft Muon Soup (2M events,
082) 1M events inclusive muons in minbias
1M events J/Psi
production, with Pt_mugt4 preselection Jet
calibration soup (1M events, 082) dijet Zjet,
various pt-hat ranges
with weights to give JetMET event
yield HLT soup (5M events, 082), W (charged
leptons) Drell-Yan (massgt20
GeV, charged leptons) t-tbar (all modes)
dijets (pt-hatgt350 GeV)
7
Muon Analyses for CSA06
  • Proposals for PRS/mu contributions to CSA06
  • Alignment study with prompt muons from W and Z
    decays
  • Extraction of W? mn signal out of single-lepton
    datastream
  • Di-muon analysis, Z reconstruction and muon
    efficiency measurement from data
  • Extraction of J/Y signal and momentum calibration
  • gt optional

8
1. Alignment
Madrid, Santander
CSA06 reproduce this result In CMSSW, starting
from a HLT high pT lepton-stream of 5 M
ev. (including 10-20 of W ? mn )
Datasamples - 1 M Z ?2m - 1 M W ? mn
9
2. W?mn Analysis
Lint12 nb-1
Padova
Scope - test HLT trigger efficiency -
test isolation algorithms - show capability
to isolate standard candle with good
purity (gt lumi measurement) - needed for
alignment - may be used for jet
calibration? Datasamples - 1M pp? m X
preselected (MSEL1, pthat20, pTmugt 5)
- 10 kevt W signal
W
Generator level
10
3. Di-Muon Analysis
Extract Z signal from 12mu high pT lepton
datastream
Florida,Purdue,FNAL,Madrid
Scope - test Z reconstruction with 1 and 2
identified muons - test procedures to measure
efficiencies from data - high pT momentum
calibration, mag.field effects Sample/code -
1 M Z ?2m - 1 M W ? mn (background)
additional backg. from tt ? single semileptonic
11
4. J/psi Calibration
200 J/y / (10 nb-1)
Scope - understand/train of low pT triggers
- muon identification in jet environment -
momentum calibration, mag.field
effects Sample/code - 1 M J/psi
pTmu1gt 4. GeV pTmu2gt 1. GeV
(BUT 2nd m is NOT identified in 50 of the
cases)
Spain, China groups interested
12
PRS/mu CSA06 tasks
Proposed CSA06 tasks/analyses 1)Task Muon
Alignment samples Z? 2mu Location
T1-PIC, Tier2-Spain (CIEMAT-IFCA) Contact F.
Matorras (Spanish group) 2) Task W -gt mu nu
analysis Samples Electroweak soft muon
soupsLocation T1-CNAF, Tier-2 Legnaro, Padova
Contact U.Gasparini, E.Torassa 3) Task
Di-muon analysis, Z reconstruction samples
Z? 2mu ( electroweak soups for backg.?)
Location Purdue, FNAL, PIC Contact M.
Schmitt, N. Neumeister, J.Alcaraz 4) Task
J/Psi -gt mu mu analysis samples soft muon
soupsLocation T1-PIC ,T2-Spain(CIEMAT-IFCA)
,China?Contact J.Alcaraz(Spain), S.Qian TBC
13
CSA06 Time schedule (I)
14
CSA06 time schedule (II)
15
CSA06 time schedule (III)
16
MTCC analyses
MTCC phase 1 (basically hardware/online,offline
software integration test) completed 15 M
trigger (7 TB data) taken(local and global
runs, many different trigger conditions, B 0
and B on data (up to 3.8 T)) A lot of detector
specific work on-going
(see e.g. DT/CSC cosmics analysis meetings
on http //indico.cern.ch/categoryDisplay.py?cat
egId20 )
17
MTCC data
Global DAQ Run 2600, B3.8 T
18
MTCC data
W2
W1
sect10
sect11
sect10
MB1
Run 2485 B0
MB2
DT occupancies
MB3
MB4
19
MTCC data
W1
W2
sect10
sect11
sect11
MBn
f1
1?2
MBn1
f2
Run 2485 B0
2?3
3?4
Df(rad)
20
MTCC data
MBn
MBn1
x1extr
x2
Dx
Run 2485 B0
Dx(cm)
21
MTCC data
Df34(rad)
Df23(rad)
Run 2485 B0
Df12(rad)
Df23(rad)
Dx23(cm)
Dx34(cm)
Dx12(cm)
Dx23(cm)
22
MTCC data
Run 2600 B 3.8 T
23
MTCC data
Pt estimation
Run 2600 B 3.8 T
24
MTCC analyses
- Can we developed cross-detectors analyses
(e.g. barrel DT Tracker) ? - Preparing for
MTCC phase 2 (the true challenge foreseen
runs at 4 T under stable conditions..)
25
Organizzazione
  • Risorse comuni
  • Cluster con sistema SCL3
  • 3 macchine lxcmssrv1,2,3
  • - /home condivise
  • - software cms (/cms/sw) condiviso
  • scramv1, CMSSW_0_9_1 installato
  • (gtgenerazione,simulazione,ricostruzione,
    visualizzazione
  • (iguana))
  • dati condivisi
  • /cms2/data
  • /cms5/data
  • /cms6/data
  • ( 1.2 TB mass storage)
  • e.g. see /cms2/data/SectTest_0607/Global/.root
    files
  • CMSSW configuration files on
  • /cms2/data/Sect
    Test_0607/ana/Aug06/.cfg
Write a Comment
User Comments (0)
About PowerShow.com