Title: A Visit to CNAO:


1
A Visit to CNAO
  • The Italian Carbon Therapy Facility

2
History
  • May 1991 Amaldi Tosi, For a center of
    teletherapy with hadrons
  • 1992 financing for a study by INFN
  • 1992 TERA Foundation formed
  • 1992 2002 three different designs completed
  • 1995 2000 Proton Ion Medical Machine Study
    (PIMMS) by CERN

3
History continued
  • May 2000 decision to construct CNAO
  • 2001 CNAO Foundation formed
  • 2005 construction starts
  • Feb. 15, 2010 construction complete
  • Sep. 22, 2011 first proton patient
  • Nov. 13, 2012 first carbon patient
  • Note Italy, Austria, and France all planned to
    use the CNAO design

4
(No Transcript)
5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
Source Linac
  • Same as HIT
  • 2 permanent magnet ECR sources
  • 400 keV/u 4-rod type RFQ
  • 20 MV IH-type drift tube linac (IH-DTL)

9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
CNAO vs HIT
25 m
21 m
Synchrotron circumference 65 m
Synchrotron circumference 78 m
19
Extraction, etc.
  • Use amplitude momentum extraction, 5/3 resonance
  • Event driven, i.e resp. gating
  • Right now only one event - completion of a plane
  • Indefinite flattop, spill 200 msec 10 sec
  • Presently, 1 sec spill
  • Rep rate design 3 sec
  • Presently 5 sec

20
Daily schedule
  • Treat 4 days/week with carbon
  • (5 days/week with protons)
  • Up to 12 hours per day
  • Mid 8 AM, QA
  • Make adjustments 1/month
  • QA TP on some weekends also

21
(No Transcript)
22
(No Transcript)
23
Patient positioning
  • Couch platform rides on air cushion
  • IR optical tracking and lasers
  • Later may use x-rays or CT
  • Some pre-positioning outside of room
  • Therapists dont like to make patients wait
  • Alignment and Prep takes a long time

24
Cont.
  • Use the Japanese protocols
  • Use couch tilt like Japan

25
(No Transcript)
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
Scanning
  • Active scanning
  • Beam monitors drive the scanning system
  • 5 msec to treat each voxel
  • 10 µsec to move between voxels
  • Beam does not stop
  • 3 mm voxel pitch
  • Beam size 4 - 10 mm
  • Beam abort in 200 µsec

31
(No Transcript)
32
(No Transcript)
33
(No Transcript)
34
(No Transcript)
35
What would you do differently?
  • Would not outsource the control system
  • Lost too much control and ability to adjust to
    evolution of the design

36
Other concern
  • Need a second accelerator
  • Once in treatment, time is scarce for studies
  • Reluctance to make changes once treatment is
    stable

37
What can the US (Fermilab) do?
  • Varian has not entered even the proton market
  • Siemens has withdrawn from ions and even has
    abandoned two proton centers under construction
  • Ions are too expensive right now

38
In my view
  • Ion market will be small
  • An opening for a national lab to develop a
    national resource
  • Choose a technology
  • Something that will provide a significant cost
    savings
  • Develop it
  • Provide a prototype for initial development
  • Allow for continued development to allow for
    upgrades to be proven before deployment to
    operational facilities

39
Thank you