Title: OPERATIONAL RISK MANAGEMENT
1OPERATIONAL RISK MANAGEMENT
2(No Transcript)
3Why have ORM for NJROTC?
4What well cover today
5-Step ORM Process Causes of Risk 4 ORM
Principles 3 Levels of ORM Risk Assessment
Matrix
5Operational Risk Management
- ORM is the process of dealing with risk
associated with NJROTC Unit operations, which
includes risk assessment, risk decision making,
and implementation of effective risk controls.
6ORM
- A Decision Making Tool
- Should we do this or not?
- Increases Ability to Make
- Informed Decisions
- Reduces Risks to Acceptable
- Levels
7ORM Goal
- The goal of ORM is to optimize operational
capability and readiness by managing risk to
accomplish the mission with minimal loss.
8ORM Terms
9ORM Terms
Hazard A condition with the potential to cause
personal injury or death, property damage, or
mission degradation.
10ORM Terms
- Risk
- An expression of possible loss in terms of
severity and probability.
11ORM Terms
Severity
The worst credible
consequence which can occur as a result of a
hazard.
12ORM Terms
Probability The likelihood
that a hazard will result in a mishap or loss.
13Physical Training Example
Hazard
Risk
Bad Weather
Slipping on track
Chance of muscle strain
Improper Stretching Before Exercise
Chance of knee injury
Running on Hard Pavement
14ORM Terms
Control A method for reducing risk for an
identified hazard by lowering the probability of
occurrence, decreasing potential severity, or
both.
15ORM Terms
- Risk Assessment
- The process of detecting hazards and assessing
associated risks.
16ORM Process
1. Identify Hazards
2. Assess Hazards
3. Make Risk Decisions
4. Implement Controls
5. Supervise
17Causes of Risk
- Change - The Mother of Risk
- Resource Constraints
- New Technology
- Complexity
- Stress
-
TEENAGERS!!!!
18Causes of Risk
- Societal Constraints
- Environmental Influences
- Human Nature
- Speed/Tempo of Operation
- High Energy Levels
19Four ORM Principles
- 1. Accept risk only when the benefits outweigh
the probable costs. - 2. Accept no unnecessary risk.
- 3. Anticipate and manage risk by planning.
- 4. Empower and train subordinates to make risk
decisions at the right level.
20ORM Levels of Application
1. Time-critical - On the run
consideration of the 5 Steps 2. Deliberate -
Application of the complete 5-Step
Process 3. In-depth - Complete 5-Step
Process with Detailed Analysis
f
21Risk Assessment Matrix
- When conducting a risk assessment, you must
factor in the severity of the hazard, the
probability of occurrence, and assign a risk
assessment code to determine the risk level.
22Risk Assessment Matrix
- Severity
- Category I (Critical)
- Hazard may cause death, loss of facility/asset
or result in grave damage to national interests.
23Risk Assessment Matrix
- Severity
- Category II (Serious)
- Hazard may cause severe injury, illness,
property damage, damage to national or service
interests or degradation to efficient use of
assets.
24Risk Assessment Matrix
- Severity
- Category III (Moderate)
- Hazard may cause minor injury, illness, minor
property damage, minor damage to national,
service or command interests or minor degradation
to efficient use of assets.
25Risk Assessment Matrix
- Severity
- Category IV (Minor)
- Hazard presents a minimal threat to personnel
safety or health, property, national, service or
command interests or efficient use of assets.
26Risk Assessment Matrix
- Probability
- Sub Category A
- Likely to occur immediately or within a short
period of time. Expected to occur frequently to
an individual item or person or continuously to a
group.
27Risk Assessment Matrix
- Probability
- Sub Category B
- Probably will occur in time. Expected to occur
several times to an individual item or person or
frequently to a group.
28Risk Assessment Matrix
- Probability
- Sub Category C
- May occur in time. Can reasonably be expected
to occur some time to an individual or several
times to a group.
29Risk Assessment Matrix
- Probability
- Sub Category D
- Unlikely to occur.
30Risk Assessment Matrix
- Risk Assessment Code (RAC)
- The RAC is an expression of risk which combines
hazard severity and mishap probability. Using
the matrix, the RAC is expressed as a single
number that can be used to help determine hazard
abatement priorities.
31Risk Assessment Matrix
PROBABILITY OF OCCURENCE
Likely Probably May
Unlikely
A B C
D
S E V E R I T Y
Critical
1
1
2
3
Serious
1
2
3
4
Moderate
2
3
4
5
3
4
5
5
Minor
32ORM vs. Non-standard Approach
Systematic Random, Individual-Dependent
Proactive Reactive
Safety As After-thought Once Plan is Done
Integrates All Types of Risk Into Plan
Common Non-standard Process Terms
Conscious Decision Can Do Regardless of
Risk Based on Risk Benefit
33The Benefits of ORM
gt Reduction in Mishaps
gt Improved Mission Effectiveness
34Questions??