Virtual Space Logistics Readiness Center (VSLRC) - PowerPoint PPT Presentation

1 / 27
About This Presentation
Title:

Virtual Space Logistics Readiness Center (VSLRC)

Description:

Title: Kickoff Meeting Last modified by: Industrial Engineering Created Date: 9/26/2002 2:41:34 PM Document presentation format: On-screen Show Company – PowerPoint PPT presentation

Number of Views:175
Avg rating:3.0/5.0
Slides: 28
Provided by: celdiIne
Category:

less

Transcript and Presenter's Notes

Title: Virtual Space Logistics Readiness Center (VSLRC)


1
Virtual Space Logistics Readiness Center (VSLRC)
  • Kickoff Meeting
  • 8 October 2002

2
Introduction of Team
  • Northrop Grumman Defense Enterprise Solutions
  • Lonna Dumouchel Program Manager
  • Laura Kistler Functional Lead
  • Greg Golden Technical Lead
  • Dymond Associates Inc. Consultant

3
Company Overview
  • THIS SLIDE AND THE NEXT SHOULD PRESENT RATHER
    GENERAL, HIGH LEVEL INFORMATION
  • IT SHOULD NOT BE PERCEIVED AS A MARKETING PITCH
  • THIS IS A BIG HOT BUTTON FOR THE LAB

4
Company Overview (Contd)
  • Quantitative and Strategic Analysis
  • Operations Research
  • Statistical Analysis
  • Business Process Reengineering
  • Cost/Benefit Analysis
  • Functional Economic Analysis
  • Information Technology
  • Systems Analysis and Design
  • Software Development
  • Database Management

Modeling and Simulation
  • Process Modeling
  • Analytical Decision
  • Support Tools
  • Logistics Simulations

5
Technical Approach Problem Identification
  • No near real time, secure, web-enabled means for
    data exchange and display
  • Need to obtain visibility of status of space
    system assets for accurate decision making and
    reporting
  • Need to capture logistics and operations
    processes, policies, and systems as they evolve
  • Need an architectural solution to support EAF,
    cross-functional C2 objectives
  • Scaleable
  • Interoperable

6
Technical Approach Users/Customers
  • HQ AFSPC/LGZ/LGX/LGM/LGS/SC
  • 14 AF/LG
  • Det 11SSMs
  • SMC/AX
  • OO-ALC/LH
  • HQ AFMC/DR

7
Technical Approach Goals/Objectives
  • Improved visibility of operational and logistical
    status through advanced information composition
  • Architecture to support near and long-term
    solutions
  • Legacy and evolving systems
  • AF Logistics/C2 requirements (current and future)

8
Technical ApproachTechnical Challenges
  • Access to data systems, interfaces and databases
  • Access to key system users (experts)

9
Technical Approach to Solution
  • Iterative, spiral development techniques used
  • Develop CONOPS (high level)
  • Depict VSLRC functional, system and reporting
    requirements
  • Data system and process analysis
  • Questionnaires used for in-depth focus
  • Interviews with SMEs
  • Det 11 interviews
  • Identify holes/buckets
  • Will work with UDRI on recommendations
  • Technological infrastructure overview
  • Size,scale and scope of operations

10
Technical Approach to Solution (Contd)
  • Develop CONOPS (Contd)
  • ROI Analysis
  • Jointly define metrics and cost elements
  • Describe non-tangible benefits of VSLRC
  • Identify strengths, weaknesses, risks
  • Validate with AFSPC
  • Balanced Scorecard Approach (BCA)
  • Identify applicability to requirements
  • Identify performance measurements/mgmt objectives
  • Recommendations for incorporation into VSLRC

11
Technical Approach to Solution (Contd)
  • Functional requirements managed with Rational
    Requisite Pro
  • Requirements Traceability Matrix (RTM)
  • Use Cases
  • Map within documentation requirements

12
Technical Approach to Solution (Contd)
  • Requirements Traceability Matrix

13
Technical Approach to Solution (Contd)
  • Requirements View

14
Technical Approach to Solution (Contd)
  • Documented Requirements and Mapping

15
Technical Approach to Solution (Contd)
  • Conceptual Demonstration
  • Slide presentation (only) to avoid resource drain
  • Data representation
  • Functional requirements representation
  • Maximize efficiencies
  • Cross functional
  • IT architecture/recommendation
  • Consistent and interoperable w/AF and DOD
    standards

16
Technical Approach Major Milestones
  • Functional Requirements Identification
  • Technological Alternatives
  • Return on Investment (ROI)
  • Final Program Review
  • Conceptual Demonstration
  • Final Technical Report

17
Technical ApproachProgress Measurement
  • MS Project detailed baseline schedule
  • Program Reviews
  • Monthly Status Reports (MSRs)
  • Funds and Man-Hour Expenditure Report
  • Internal contract progress/status reviews by
    Corporate Leads

18
Technical Approach Exit Criteria
  • Requirements Traceability Matrix (RTM)
  • Baseline Cost of Work Performed (BCWP)
  • Conceptual Demonstration

19
Planned Travel
  • DC to Dayton KickOff Mtng
  • DC to LA Data Collection
  • Dayton to LA Data Collection
  • DC to OO-ALC Site Survey
  • Dayton to CO Data Collection and Progress
    Review
  • DC to CO (2 trips) Data Collection and Progress
    Review
  • Further travel requirements will be performed
    within contract cost/funding provided

20
Risks
  • Management
  • Cost
  • Schedule
  • Technical
  • Data Access Requirements
  • Access to personnel (SMEs) for interviews
  • Risk Abatement Strategy
  • Leverage off of already existing studies/reports
  • Use management tools to monitor progress
  • Report any shortfalls in receiving access to data
    required to AFRL/HESS and associated impact to
    effort

21
Major Unresolved Issues
  • None

22
Potential Benefits/Payoffs
  • First iteration in depicting VSLRC rqmnts
    (CONOPs)
  • Data system reduction
  • Advanced technological infrastructure
  • Improve Supply Chain Management (SCM) and LRC
    objectives
  • Performance Management/ Measurement goals
    identified and implemented
  • Conceptual demonstration of possibilities
  • Return On Investment (ROI)
  • Sound business case for marketing of VSLRC
    concept to senior leadership

23
Programmatics Schedule
24
Programmatics Man-Hours and Types
  • Type Hours
  • Project Mgr 19
  • Sr. Analyst Manager I 879
  • Sr. Analyst Manager II 304
  • 1,202

25
ProgrammaticsDeliverables
  • Type Due Date
  • Monthly Status Report 15th day of each month
  • Funds and Man-Hour Rpt 15th day of each month
  • Presentation Material As Required
  • Technical Report (Draft) 7.5 MAC (Apr 03)
  • Technical Report (Final) 9.5 MAC (Jun 03)
  • All deliverables will be presented in contractor
    format

26
Programmatics Contractor billing
schedule/strategy
  • Invoiced monthly based on expenses incurred

27
QUESTIONS?
Write a Comment
User Comments (0)
About PowerShow.com