Automation in 24 kV (MV) overhead line network This means : increased supply quality and reduced costs for the customers, reduced compensation costs for the utilities. – PowerPoint PPT presentation

Number of Views:50
Avg rating:3.0/5.0
Slides: 8
Provided by: dhb3
Category:

less

Transcript and Presenter's Notes

Title: Automation in 24 kV (MV) overhead line network


1
Automation in 24 kV (MV) overhead line network
  • This means
  • increased supply quality and reduced costs for
    the customers,
  • reduced compensation costs for the utilities.
  • Why focus on MV overhead line network?

2
Investments and reliability of electricity supply
system
3
Example of MV-network configuration
4
Interruption times with and without automation
Cost savings for automation will depend on the
CENS-rates and customergroups. (CENS- Cost of
Energy not Supplied)
5
The Automation-system should

  • Save costs
  • Be independent of communication
  • Be a simple product with few variants
  • Use standard industrial components
  • with long life
  • Take care of radial
  • and meshed network

6
Example of system - SiMAGIK
Substation-busbar
SIMATIC S7-200
Circuit-breaker
IEC-60870-5-101
Discon-nector
MASTER
SLAVE
7
Automation in MV overhead line network
  • Conclusion
  • Considerably reduced interruption times during
    permanent faults
  • Systems are on the marked (e.g SiMAGIK since
    1987) and have a lot of references
  • Profitable investment
  • CENS has increased the interest and reduced the
    pay back time.