Title: ISQA 479


1
ISQA 479
  • Customer Value
  • Smart Pricing
  • Expediting

2
Customer Value
  • Timing and Lead Time
  • Location
  • Conformance to Specifications
  • Information/Visibility
  • Value Added Services
  • Product Selection
  • Price
  • Long Term Relationship

3
Power Shift in Manufacturing
  • Contract Manufacturing
  • Electronics
  • Clothing
  • Auto Sub-assemblies
  • Jewelry
  • Food
  • Furniture
  • Pharmaceuticals

4
Locations
  • Hi Tech/ Hi Quality or Cheap
  • Asia
  • China
  • India
  • Malaysia
  • Indonesia
  • Taiwan
  • Korea
  • Japan

5
Locations
  • Central and South America
  • Brazil
  • Mexico
  • Maquiladoras
  • Central America and Caribbean
  • Africa
  • Kenya
  • South Africa

6
Smart Pricing
  • Customer Differentiation
  • Timing
  • Price According to Demand
  • Airlines
  • Hotels
  • Rebates
  • Surcharges

7
Smart Pricing
  • Differential Pricing
  • Group Pricing
  • Regional Pricing
  • Product Versions
  • Transportation Preferences
  • Seasonality
  • Freight and Handling

8
Pricing and the Internet
  • Information Availability
  • Expanded Customer Base
  • Expanded Supply Base
  • Price
  • Service
  • Customer Ratings
  • Look Up
  • Alibaba.com
  • Thomasnet.com
  • Solusource.com

9
Sourcing and Expediting
10
Sourcing Objectives
  • Fundamental Objectives
  • Continuity of Supply
  • Quality
  • Minimize Administrative Costs

11
Avoiding Problems
  • Complete Specifications
  • Minimize Change Orders
  • Order Timing
  • Order Outside Supplier Normal Lead Time
  • Minimize Rush Orders
  • Continuous Supplier Information Flow
  • In Both Directions
  • Supplier Visits

12
(No Transcript)
13
Expediting Objectives
  • Avoid surprises
  • Receive Materials ON TIME
  • Manage supply base
  • Persuade supplier to do what was agreed
  • Solve problems
  • Supplier Problems
  • Industry Problems
  • Build supplier relationships
  • Understand supply chains

14
Why Suppliers Fail
  • Inaccurate lead times
  • Impossible sales promises
  • Lead time changes
  • Suppliers sources
  • Overmatched supplier
  • Errors
  • Undercapitalized
  • Logistics
  • Force Majeure

15
Before you place an order
  • Salespersons home phone
  • Managers home phone
  • Other emergency numbers
  • List of carriers in immediate vicinity
  • Other useful information
  • Organization chart
  • Credit manager
  • Engineering manager
  • Production manager
  • Purchasing manager

16
Before Placing an Order
  • Early Delivery Bonus?
  • Sliding Pay Scale
  • On Time Full Pay
  • Late Deductions
  • Agree on Transportation
  • Mode
  • Carrier
  • Agree on Force Majeure
  • Agree on Liquidated Damages

17
After Placing an Order
  • Read contract documents carefully
  • Think before you act
  • BE NICE but firm
  • Authorize overtime
  • Partial shipment
  • Next closest dealer
  • Next closest major customer
  • Available in another form?
  • Hold all new orders to supplier pending
    resolution
  • Threats are ALWAYS a last resort

18
Structural SteelAn Example
  • Engineering Specs
  • General Contract
  • Sub-Contract With Installer
  • Sub Orders Materials
  • Local Steel Supply Firm
  • Order From Supplier Bao Steel Shanghai
  • Bao Steel
  • Hot Roll
  • Fabricate
  • Deliver to Dock

19
Structural Steel, Cont.
  • Load on Ship (Schedule)
  • Transit Time
  • Discharge at Port
  • Customs
  • Arrange Local Trucking
  • Deliver to Jobsite
  • Erect

20
Structural Steel
  • Finalize Engineering Specs Drawings 6
  • Award Contract to LCL 4
  • Contract With Installer 4
  • Installer Orders Materials 2
  • Local Steel Supply Firm 2
  • Order From Supplier Bao Steel Shanghai
  • Bao Steel
  • Hot Roll 2-4
  • Fabricate 1-2
  • Deliver to Ship 1

21
Structural Steel, Cont.
  • Load on Ship (Schedule) 1-2
  • Transit Time 2-3
  • Discharge at Port 1
  • Customs 1-2
  • Arrange Local Trucking 1
  • Deliver to Jobsite 1
  • Erect
  • Total Lead Time Could Be 6 Months

22
Structural Steel, Cont.
  • Assume Contract w/ Erector
  • Assume Steel Supplier Has Raw Material
  • Still Need Fabrication Time, Transportation Time

23
Expediting
  • Ask Subs Does your supplier have the materials
    IN STOCK?
  • If YES, is the material set aside and earmarked
    for us?
  • If not in stock, what is the lead time and what
    process does sub have in place to be sure it gets
    ordered in time?
  • Dont forget that transportation lead time needs
    to be included (Permits?)

24
Expediting and Project Management
  • This ties back to the need for prompt submittals
    and AE approvals.
  • Do AE folks know what lead times are for
    materials?
  • A Materials Critical Path?

25
Expediting
  • Backward Scheduling
  • Date needed on jobsite
  • Slack
  • Transportation time
  • Fabrication time
  • Materials lead time
  • AE approvals
  • AE submittals

26
Expediting
  • Make a materials checklist that includes
    proactive checking on subs to be sure they and
    their suppliers have ordered material in time.
  • Ask Subs What is your Forecast (not guess) for
    availability of materials? Why?
  • Lead times change depending on economic
    conditions. Verify periodically

27
Questions, Comments, Observations, Conclusions,
Arguments?