Title: 230 kV LINE WALLA WALLA
1230 kV LINE WALLA WALLA WALLULA Mc NARY500
kV LINE HEMINGWAY CAPTAIN JACK REGIONAL
PLANNING MEETING
- REGIONAL
- PLANNING PROJECT
- MEETING
- JULY 9, 2008
2230 kV LINE WALLA WALLA WALLULA Mc NARY500
kV LINE HEMINGWAY CAPTAIN JACK REGIONAL
PLANNING AND PROJECT RATING PROCESS
3230 kV LINE WALLA WALLA WALLULA Mc NARY500
kV LINE HEMINGWAY CAPTAIN JACK - PROJECT
GUIDELINES
- 1. Take multiple project needs and plans into
account, including identified utilities and
non-utilities future needs, environmental and
other stakeholder interests - 2. Cooperate with others to look beyond specific
end points of the sponsors project to identify
broader regional and subregional needs or
opportunities - 3. Address the efficient use of transmission
corridors (e.g., right-of-ways, new projects,
optimal line voltage, upgrades, etc.)
4230 kV LINE WALLA WALLA WALLULA Mc NARY500
kV LINE HEMINGWAY CAPTAIN JACK - PROJECT
GUIDELINES
- 4. Identify and show how the project improves
efficient use of, or impacts existing and planned
resources of the region (e.g., benefits and
impacts, transmission constraint mitigation) - 5. Cooperate with Regional Planning Review Group
members in determining the benefits and impacts
due to the project - 6. Identify transmission physical and
operational constraints resulting from the
project or that are removed by the project
5230 kV LINE WALLA WALLA WALLULA Mc NARY500
kV LINE HEMINGWAY CAPTAIN JACK - PROJECT
GUIDELINES
- 7. Coordinate project plans with and seek input
from all interested members, subregional planning
groups, power pools, and region-wide planning
group(s) - 8. Coordinate project plans with and seek input
from other stakeholders including utilities,
independent power producers, environmental and
land use groups, regulators, and other
stakeholders that may have an interest - 9. Review the possibility of using the existing
system, upgrades or reasonable alternatives to
the project to meet the need (including
non-transmission alternatives where appropriate)
6230 kV LINE WALLA WALLA WALLULA Mc NARY500
kV LINE HEMINGWAY CAPTAIN JACK - PROJECT
GUIDELINES
- 10. Indicate that the sponsors evaluation of
the project has taken into account costs and
benefits of the project compared with reasonable
alternatives - 11. Coordinate with potentially parallel or
competing projects and consolidate projects where
practicable.
7230 kV LINE WALLA WALLA WALLULA Mc NARY500
kV LINE HEMINGWAY CAPTAIN JACK STUDY AREA
8230 kV LINE WALLA WALLA WALLULA Mc NARY
- 230 kV LINE WALLA WALLA
- WALLULA Mc NARY
- PROJECT
- BENEFITS
- ALTERNATIVES STUDIED
9230 kV LINE WALLA WALLA WALLULA Mc NARY
- PROJECT
- CONSTRUCT NEW SINGLE-CIRCUIT 230 kV LINE FROM
WALLA WALLA TO WALLULA TO Mc NARY - APPROXIMATELY 56 MILES OF NEW LINE
- LINE TERMINALS REQUIRED AT WALLA WALLA, WALLULA
AND Mc NARY - PROPOSED IN-SERVICE DATE IS 2010.
10230 kV LINE WALLA WALLA WALLULA Mc NARY
- BENEFITS
- PROVIDES UP TO 400 MW OF NEW TRANSMISSION
CAPACITY - IMPROVES TRANSMISSION RELIABILITY
- PROVIDES TRANSMISSION CAPACITY FOR NEW WIND
RESOURCES - FACILITATES FUTURE INTERCONNECTION OF OTHER
REGIONAL TRANSMISSION PROJECTS
11230 kV LINE WALLA WALLA WALLULA Mc NARY
12230 kV LINE WALLA WALLA WALLULA Mc NARY
SYSTEM BEFORE REINFORCEMENTS (POTENTIAL WIND ON)
13230 kV LINE WALLA WALLA WALLULA Mc NARY-
SYSTEM AFTER REINFORCEMENTS
14230 kV LINE WALLA WALLA WALLULA Mc NARY
SYSTEM AFTER POTENTIAL DOUBLE CIRCUIT OUTAGE
15230 kV LINE WALLA WALLA WALLULA Mc NARY
- CONCLUSIONS TO-DATE
- Single Circuit performs well
- Double Circuit performs better
- Present needs indicate a double circuit is not
required - RAS needed for higher wind penetrations
- New corridor for line will be difficult to obtain
16230 kV LINE WALLA WALLA WALLULA Mc NARY
- NEXT STEPS
- ADDRESS REGIONAL PLANNING GUIDELINES
- PREPARE REGIONAL PLANNING PROJECT REPORT
- INITIATE PHASE 1 RATING PROCESS
17230 kV LINE WALLA WALLA WALLULA Mc NARY
18500 kV LINE HEMINGWAY CAPTAIN JACK
- 500 kV LINE HEMINGWAY CAPTAIN JACK
- PROJECT
- BENEFITS
- ALTERNATIVES STUDIED
19500 kV LINE HEMINGWAY CAPTAIN JACK
- PROJECT
- 320 MILE (APPROX.) SINGLE CIRCUIT 500 kV LINE
FROM NEW PROPOSED HEMINGWAY SUBSTATION NEAR
MELBA, IDAHO TO THE EXISTING CAPTAIN JACK 500 kV
SUBSTATION IN SOUTHERN OREGON. - PROPOSED IN-SERVICE DATE IS 2014.
20500 kV LINE HEMINGWAY CAPTAIN JACK
- ALTERNATIVES STUDIED
- USED WECC 2010 LIGHT AUTUMN CASE
- ADDED TO BASE CASE
- GATEWAY CENTRAL, WEST SOUTH
- I-5 REINFORCEMENT
- NORTHERN CALIFORNIA LINE
- SOUTHERN CROSSING
- WEST OF Mc NARY
- EVALUATED POWER SYSTEM SENSITIVITY TO HVDC
TERMINUS - EVALUATED POWER SYSTEM SENSITIVITY TO HEMINGWAY
TO CAPTAIN JACK TERMINUS
21500 kV LINE HEMINGWAY CAPTAIN JACK
- BENEFITS
- SUPPORT WEST SIDE LOAD GROWTH
- ADDRESS RENEWABLE PORTFOLIO STANDARDS
- FACILITATES FUTURE INTERCONNECTION OF OTHER
REGIONAL TRANSMISSION PROJECTS
22500 kV LINE HEMINGWAY CAPTAIN JACK
23500 kV LINE HEMINGWAY CAPTAIN JACK -
ALTERNATIVE A - HVDC TERMINAL ADJACENT TO
GRIZZLY 500 kV
24500 kV LINE HEMINGWAY CAPTAIN JACK
- NEXT STEPS
- ADDRESS REGIONAL PLANNING GUIDELINES
- PREPARE REGIONAL PLANNING PROJECT REPORT
- INITIATE PHASE 1 RATING PROCESS
25500 kV LINE HEMINGWAY CAPTAIN JACK